About this file

This is a Description of Schedule of Values document for the Perdido Landfill Northeast Pond Improvements project solicited by Escambia County, Florida Department of Waste Services through Invitation to Bid #PD 25-26.056. The project encompasses nine lump sum line items: mobilization and demobilization with general conditions, erosion and sediment control, surveying, demolition of existing infrastructure, pond grading, sand infiltration layer installation, underdrain pipe network installation, topsoil placement and sod, and outlet protection reestablishment. The scope involves comprehensive improvements to the northeast stormwater pond at the Perdido Class I Landfill facility located at 13009 Beulah Road in Cantonment, Florida, with a mandatory pre-bid meeting scheduled for March 16, 2026 at 12:30 p.m., a question deadline of March 25, 2026 at 10:00 a.m., and bid submissions due April 6, 2026 at 1:00 p.m. Work must be substantially completed within 90 consecutive calendar days from Notice to Proceed, with an additional 30 days allowed for final completion (120 calendar days total).

Bidders must submit lump sum pricing for all nine line items with bids to be evaluated for comparison and partial payment determinations. The mobilization and general conditions item shall not exceed 7 percent of the total contract amount, with up to 75 percent payable upon completion of mobilization activities and the remainder due upon demobilization. Payment for erosion and sediment control, surveying, and other lump sum items will be made based on contractor-submitted schedules and estimates approved by the owner's representative or engineer. All contractors must provide a bid bond equal to 5 percent of the total bid price, obtain performance and payment bonds covering up to 100 percent of the award value, maintain comprehensive insurance coverage with workers' compensation, general liability of $1,000,000 per occurrence and $2,000,000 annual aggregate, business auto liability of $1,000,000 per accident, and contractor's pollution liability of $1,000,000 per occurrence and $2,000,000 annual aggregate. Liquidated damages are assessed at $1,685.00 per calendar day for work extending beyond the completion deadline, and a one-year warranty on all labor and materials is required following project completion.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NE Pond Remediation Section 01200 Description of Schedule of Values

01200-1

SECTION 01200

DESCRIPTION OF SCHEDULE OF VALUES

PART 1 GENERAL

1.01 DESCRIPTION

A completed, quality project, as intended by the general nature of the Drawings and specifications, shall be produced whether or not any particular wording or direction is inadvertently omitted. Pay items listed on the Bid Form whether lump sum or unit price are for comparison of bids and may be used as a method of determining the value of work performed for partial payment requests.

1.02 LUMP SUM QUANTITIES

A. CONTRACTOR shall be solely responsible for determining the quantities of each lump sum pay item necessary to complete the work as required by the Contract Documents. When lump sum items are broken into components, the sum of the components shall be the total

Contract Price for the work. The lump sum schedule of values stated on the Bid Form shall constitute full compensation for each pay item completed in accordance with the Drawings and specifications. No other payments will be made to the CONTRACTOR except as specifically authorized by change order.

1.03 LUMP SUM SCHEDULE

The descriptions provided in the following paragraphs are to be used by the Bidder in preparation of his bid proposal. They generally indicate how the major workscope items and their respective costs are to be separated into the line items listed in the Bid Form. These descriptions are neither fully representative nor all inclusive of the work required for completing the project in accordance with the Contract Documents. It is the Bidder's responsibility to include costs within the most appropriate line item(s) of the Lump Sum Schedule except for the specific unit price pay items specifically described. The following descriptions are ordered in the same numeric sequence of the Schedule of

Values.

Item 1 – Mobilization, Demobilization and General Conditions

This lump sum item shall include and cover the costs for performance of construction preparatory and overhead operations, including, but not limited to, movement of personnel and equipment to and from the site, temporary facilities, sanitary facilities, project administration and management, dust control, insurance, bonds, OWNER and ENGINEER indemnification, site health and safety, environmental protection, permits related to construction and all other similar activities and facilities necessary for execution of this project. This item shall not exceed 7% of the total contract amount.

Contractor will be paid up to 75% of this item upon completion of mobilization and general conditions with the remainder paid upon demobilization.

Item 2 – Erosion and Sediment Control

01200-2

This lump sum item shall consist of furnishing all equipment, materials, labor, and appurtenances required for sedimentation and erosion control at the site as required by the Contract Documents, applicable laws and regulations, and standards of practice. This work includes but is not limited to furnishing, installing, and maintaining silt fence, temporary or intermediate seeding and mulching, temporary stormwater channels and temporary diversion berms, temporary check dams and maintenance of the stormwater swales and stormwater management during construction. The lump sum price proposed shall be full compensation for performing sedimentation and erosion control work required. Payment for this bid item will be on a lump sum basis based on the value of materials furnished or services and work completed using estimates provided by CONTRACTOR and approved by OWNER’s representative.

Item 3 – Surveying

This lump sum item shall include furnishing of all labor, materials, tools, supervision, transportation, and equipment necessary to perform project surveying work as specified in the

Contract Drawings including establishing survey control points, providing survey control during construction, preconstruction survey, partial and final as-built Drawings, and obtaining all survey information required to compile Record (As-Built) Drawings as required by the Contract

Documents. Unless ENGINEER has directed in writing that surveying shall vary from that indicated on the Construction Drawings, the payment quantity shall not exceed the price in the Bid Schedule.

The lump sum price proposed shall be full compensation for performing the surveying work required. Payment for this item shall be made on a lump sum basis, wherein no measurement will be made. Payments for this lump sum item will be made based on the CONTRACTOR submitted schedule and approved by ENGINEER for sub-survey items. Full payment for each milestone will be made upon full completion of the item. Surveys shall only be submitted by CONTRACTOR after previous surveys have been approved by OWNER’s representative.

Item 4 – Demolition

The lump sum price shall include all materials, equipment, labor, transportation, and all else required to demolish existing infrastructure including: excavate and dispose sand infiltration layer and gravel, remove and dispose existing underdrain pipe network and remove and stockpile existing outlet protection. The lump sum price proposed shall be full compensation for performing all relevant demolition and disposal within the Class I landfill or stockpile for OWNER use as requested by the

OWNER.

Item 5 – Pond Grading

The lump sum price shall include furnishing all necessary materials, equipment, transportation, labor, and appurtenances necessary to prepare subgrade of the NE Pond to the lines and grades shown on the plans. The work includes, but is not limited to, grubbing vegetation, remove and stockpile topsoil and fine grading, remove excess soil material and stockpile at landfill working face for OWNER use and backfilling from onsite borrow sources if needed and compaction. The lump sum price proposed shall be the full compensation for performing all relevant requirements to achieve construction of subgrade to the lines and grades as shown in the Drawings.

Item 6 – Sand Infiltration Layer

This lump sum item is to include, but not be limited to, equipment, transportation, and labor necessary to prepare and install sand infiltration layer using off-site materials. The work will include

01200-3 but not be limited to testing, loading, hauling and placement as shown on the Drawings and in accordance. The lump sum price proposed shall be full compensation for performing all relevant requirements to achieve successful installation of sand infiltration layer to the lines and grades as shown in the Drawings.

Item 7 – Underdrain Pipe Network_

The lump sum price shall include, but not be limited to, all costs associated with supply and installation of the underdrain pipe to the required minimum slopes including perforated/solid wall

HDPE piping, blind flanges, pipe fittings, pipe welding, gravel (around the pipe and above the infiltration layer), geotextile separation layer, connection to existing outlet structure and surveying.

The lump sum price proposed shall be full compensation for performing all relevant requirements to achieve successful installation of underdrain pipe network to the lines and grades and details shown in the Drawings.

Item 8 – Topsoil Placement and Sod

The lump sum price for this item includes all costs required for installation of the topsoil layer followed by sod on the pond sideslopes. The work shall include, but not limited to, installation of 6-inch topsoil layer from on-site stockpile, supply and install sod, watering and maintaining sod until fully established.

Item 9 – Reestablish Outlet Protection

The lump sum price for this item includes all costs required for supply and installation of the rip-rap outlet protection underlain by geotextile separation layer to the dimensions shown in the plans at existing stormwater inflow locations.

END OF SECTION

No. Item Quantity Unit Unit Cost Total Cost

1 Mobilization, Demobilization and General Conditions 1 LS -$

2 Erosion and Sediment Control 1 LS -$

3 Surveying 1 LS -$

4 Demolition 1 LS -$

5 Pond Grading 1 LS -$

6 Sand Infiltration Layer 1 LS -$

7 Underdrain Pipe Network 1 LS -$

8 Topsoil Placement and Sod 1 LS -$

9 Reestablish Outlet Protection 1 LS -$

TOTAL BID