01 YTPM 24-0005 SOW_30JAN2025.pdf

PDF 1 MB Posted

Attached to
Repair Fire Detection System Bldg. 1850 Federal contract opportunity
Solicitation number
FA660625R0001
Issued by
Department of the Air Force Reserve Command

View the file

Other files for this federal contract opportunity

Other files attached to Repair Fire Detection System Bldg. 1850, newest first.
File Type Posted
Solicitation Amendment FA660625R00010003 SF 30.pdf PDF
Fire Detection System Hazardous Material Survey_12022016.pdf PDF
Fire Detection System Wage Determination_03212025.pdf PDF
RFI 003-YTPM 24-0005 Fire Detection System Govt Response 03242025.pdf PDF
RFI 002-YTPM 24-0005 Fire Detection System Govt Response Signed 03172025.pdf PDF
RFI 001-YTPM 24-0005 Fire Detection System Govt Response 03142025.pdf PDF
Solicitation Amendment FA660625R00010002 SF 30.pdf PDF
02-YTPM 24-0005 Site Visit Sign-In Sheet.pdf PDF
Solicitation Amendment FA660625R00010001 SF 30.pdf PDF
08 YTPM 24-0005 REDACTED JA Other Than Full and Open_Brand Name - COCO Signed.pdf PDF
08 YTPM 24-0005 JA Other Than Full and Open_Brand Name - COCO Signed.pdf PDF
07 YTPM 24-0005 Sole Brand Gamewell Sigcom FAP 09MAY2024.pdf PDF
06 YTPM 24-0005 Bid Schedule (blank) 28JAN2025.pdf PDF
09 YTPM 24-0005 Wage Determination MA20250003_20250207.pdf PDF
03 YTPM 24-0005 Appendix B Specs 28JAN2025.pdf PDF
Solicitation - FA660625R0001_CO Issued.pdf PDF
10 YTPM 24-0005 439AW FORM 1_Blank.pdf PDF
02 YTPM 24-0005 Appendix A Drawings 08JAN2025.pdf PDF
04 YTPM 24-0005 Appendix C Fire Alarm Inspection Report 08JAN2025.pdf PDF
05 YTPM 24-0005 Appendix D Register and Deliverables Table.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

PROJECT YTPM 24-0005

REPAIR FIRE DETECTION SYSTEM, BUILDING 1850

AIR FORCE RESERVE

439TH CIVIL ENGINEERING

WESTOVER AIR RESERVE BASE

CHICOPEE MASSACHUSETTS 01022

January 30, 2025

STATEMENT OF WORK COVER SHEET 1

SECTION TITLE PAGE

DIVISION 1- GENERAL REQUIREMENTS 3-10

DIVISION 1- WESTOVER GENERAL CONDITIONS 11-18

ATTACHMENTS (FORMS)-

- Construction Waste Management Plan

- Quarterly Solid Waste Disposal Form-updated 1 Oct 2020 19-24

- 439 AWF 20 439 AW Form 20, Contractor Information sheet

APPENDIX A AS-BUILT DRAWINGS

APPENDIX B TECHNICAL SPECIFICATIONS

DIVISION 00 15 LIST OF DRAWINGS

DIVISION 25 05 11 CYBER SECURITY

DIVISION 26 05 19.10 10 INSULATED WIRE

DIVISION 26 20 00 INTERIOR DISTRIBUTION

DIVISION 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION

APPENDIX C INSPECTION REPORT 2024 WESTOVER ARB BUILDING 1850

APPENDIX D REGISTER AND DELIVERABLES TABLE

DIVISION 1 GENERAL REQUIREMENTS

1.0 General Information

1.1 General: Project is located at Westover Air Reserve Base, Chicopee, Massachusetts. The work shall be conducted in an occupied building and the Contractor shall conduct all work to cause the least interference possible with the normal activities inside the facility.

1.2 Purpose: The purpose of this project is to repair the existing Fire Alarm System at building 1850 with a new system as described in this SOW.

1.3 Period of Performance: The performance period for this Statement of Work is 180 calendar days from Notice to Proceed. The Contractor shall begin work as described in the Scope of Work within 10 days of Notice to Proceed (NTP). No construction shall begin prior to government approval of the Plans & Submittals. All on site work must be completed within 120 calendar days.

2.0 Existing Conditions.

2.1 Building 1850 currently has an outdated and obsolete Fire Alarm System (FAS) and a relatively new Mass Notification System (MNS). The two systems currently operate independently. A general description of each system is as follows:

2.2 Fire Alarm System (FAS) Edwards model#5721B

2.2.1 Mechanical/Electrical room

- One (1) wall mounted Fire Alarm Control Panel - Edwards#5721B

- fed from Main Lugs Only LPE electrical panel 120/208 volt, 3 phase 4 wire

- One (1) wall mounted Booster Power supply

- One (1) wall mounted Transmitter with two Communicator model Sigcom 129

- Three (3) batteries model# SLA1105 Sealed Lead Acid

- Two (2) ceiling mounted smoke detectors and one (1) duct detectors

- One (1) pull station

2.2.2 HVAC room

- Two (2) ceiling mounted smoke detectors and three (3) duct detectors.

- One (1) pull station

2.2.3 Offices, Bathrooms and Hallway areas

- Thirteen (13) wall mounted Horn/strobes

- Ten (10) wall mounted pull stations

- Seventy (70) ceiling mounted Smoke detectors

- Seven (7) Heat detectors

2.3 Mass Notification System (MNS) was installed in 2014.

2.4 Office, Bathrooms and Hallway areas

- Forty- two (42) Wall mounted strobes and speakers

- Thirty-three (33) Ceiling Mounted strobes and speakers

- One (1) wall mounted Control Panel- SigCom

- One (1) Annunciator- Edwards -Two (2) batteries model# SLA1105 Sealed Lead Acid

3.0 Scope of Work

3.1 The intent of this project is to repair the existing Fire Alarm System (FAS) by replacing it with a new system.

It is also the intent to locate the new Fire Alarm (FA) Panel next to the existing Mass Notification System (MNS) panel near the main entrance and to combine the two systems to share alarm devices, horns and strobes, wherever possible.

3.2 Many locations have suspended ceilings but there are some locations where wire mold or other surface-mounted conduit systems will need to be utilized for the installation of the new system

3.3 The new Fire Alarm System (FAS) will be completely installed, tested and operational prior to the demolition and removal of the old system. Allowances will be made for certain components, like the manual pull stations, so that duplicate devices are not installed in proximity.

3.4 Major items of work include:

3.4.1 Demolition:

a. Mechanical/Electrical room:

i. Completely demolish the existing Fire Alarm Control panel, Booster power supply, transmitter, remove wires and connectors.

ii. Remove smoke detectors, pull stations, duct detectors, wiring, connectors and all components associated to the fire alarm system. Empty conduits and boxes can remain in this area.

b. HVAC room:

Remove smoke detectors, pull station, duct detectors, wiring, connectors and all components associated to the fire alarm system. Empty conduits and boxes can remain in this area.

c. Offices, Bathrooms and Hallway areas:

i. Remove all ceiling smoke detectors, horn/strobes, pull stations, heat detectors, wiring, and connectors. All wall and ceiling boxes need to have blank plates installed after removal of deactivated devices.

ii. See attached drawing for location of suspended ceilings versus hard ceilings.

3.4.2 New work:

a. Office, Bathrooms and Hallway areas:

i. The new Fire Alarm Control panel, Booster power supply, and Transmitter, shall be wall surface mounted with new wiring, fed from LPE electrical panel, all home-run installations will be in accordance with NFPA 70.

ii. All new heat detectors, smoke detectors shall be surface mounted on ceiling tiles or hard ceilings, connect and run new wires above ceiling in a professional manner in accordance with

NFPA 70.

iii. All new horn strobes will be wall or ceiling mounted, connect and run new wires above ceiling in accordance with NFPA 70. Use existing Mass Notification System devices where possible.

iv. All new pull stations will be surface wall mounted, contractor shall match height with existing, connect and run new wires above ceiling in accordance with NFPA 70.

b. Mechanical/Electrical and HVAC areas:

i. All new heat detectors will be surface mounted on hard ceilings exposed new wiring will be run in accordance with NFPA 70 to the Fire Alarm Control Panel.

ii. All new duct detectors will be mounted accordingly connect and run new wiring in accordance with NFPA 70 to the Fire Alarm Control Panel.

3.5 Project Requirements

3.5.1 This Statement of Work (SOW) defines the general requirements for the completion of this work.

3.5.2 Other Applicable Codes. The Contractor shall identify and comply with any other applicable codes such as the National Fire Protection (NFPA), the National Fire Alarm Signaling Code, the National Electrical Code (NEC), and the International Building Code (IBC), including all changes and amendments in effect of the date of issuance of this SOW. When questions arise between applicable codes from different regulatory agencies, the most stringent shall prevail.

3.5.3 The Contractor shall consider energy conservation, pollution prevention, and waste reduction to the maximum extent practicable. The Contractor shall incorporate recycled materials required by the U.S.

Environmental Protection Agency. The Contractor shall follow the Air Force Affirmative Action Procurement Program guidelines for Design and Construction Services. Products specified as part of this project and delivered under this contract shall comply with these guidelines. The Contractor shall complete and submit the Construction Waste Management Plan and Waste Management Summary Form for the construction activities of this project. These forms are provided at the end of Attachment.

3.5.4 The Contractor shall perform site preparation, erect safety barricades, construction, restoration, repair, enhancement, maintenance, demolition, site clean-up, and demobilization of facilities and sites as required accomplishing this SOW. Fall protection systems shall be installed and utilized in accordance with the US Army Corps of Engineers Safety & Health Requirements Manual (EM385-1-1) and OSHA standards as applicable.

3.5.5 Construction Schedule. The contractor shall provide a detailed construction schedule. The construction schedule estimate shall show all work tasks, demolition dates, material and equipment delivery time frames, timelines, and expected completion date.

3.6 Preconstruction Site Investigative Requirements

3.6.1 The Contractor shall perform all site visits, surveys, and investigations necessary to satisfy himself/herself of all project conditions and requirements, existing conditions of the facility and material quantities necessary to accomplish the general intent of this SOW. The Contractor’s services shall include any field investigations or surveying required for the accurate preparation and inclusiveness of the cost proposal and ultimate completion of the construction plan. The Contractor shall also furnish all temporary materials and equipment such as scaffolds, staging, lifts, etc., to safely access and accomplish this investigation work.

3.6.2 The Contractor shall investigate the accuracy of all drawings and other as-built records applicable to the project scope and update them as necessary. The Contractor shall be responsible for physically investigating all accessible areas, including spaces above existing suspended ceilings as required. Non-accessible areas can be opened by Base personnel with prior coordination if the Contractor determines that the inspection is necessary to properly define the construction plan. The Contractor shall provide the Contracting Officer fourteen (14) calendar day advance written notice prior to any scheduled inspection of concealed spaces which require government assistance.

3.6.3 Copies of all Record drawings that are available for the existing building construction can be obtained by the Contractor at the Civil Engineering facility located in Building 2450 at Westover Air Reserve Base. AutoCAD files may not be available for all facilities. These drawings shall be used for reference only. Contractor shall conduct on-site investigation to determine their accuracy.

3.7 Preconstruction Submittals per Specification 28 31 76 Interior Fire Alarm and Mass Notification Paragraph 1.9.1

3.7.1 System Design Documents. The text for delivered documents shall be prepared at standard letter size (8.5" x 11"). Edited specifications shall be double sided (head-to-head). Attachments shall be fully identified, referenced in the text. All documents will be produced electronically only, unless otherwise specified, and will become property of the U.S. Air Force upon completion of the design.

The Contractor shall deliver copies of any specifications, reports, etc. using Microsoft Office on compatible program media to the base Point of Contact (POC). The Contractor shall deliver copies of drawings using the latest AutoCAD (with X-References bound). The Contractor will be required to deliver copies of the reports and documents on CDs to the Base POC’s.

3.7.2 Drawings. Drawings may consist of floor plans, installation details, controls schematics or any views that clearly show the extent of the work, the method(s) of installation, and the expected results.

3.7.3 All contract drawings to be furnished shall be well prepared, complete, and accomplished in accordance with the best professional practice to show clearly and concisely the type and extent of work to be performed. The drawings will be prepared utilizing the latest AutoCAD software and dimensioned completely and accurately. Each sheet or drawing will include a border and a graphic scale bar to indicate the appropriate scale for the work shown. Drawing dimensions shall be in English units. Standard fonts, material indications and symbols for fire alarm and electrical equipment shall be used. Project title sheets shall have an index that lists the drawing number, drawing name, sheet number of total sheet number, i.e. Sheet X of Y, and CAD file name.

3.7.4 Drawings shall be prepared such that they are legible when printed on 11" x 17" paper.

3.7.5 Technical Construction Specifications are included in the Attachment section of this SOW and shall be utilized for this project. Any additional specifications required by the final design shall be prepared utilizing the most current UFGS to meet Air Force requirements.

3.7.5.1 It is essential that all specifications be completely edited and tailored to suit the work requirements of the individual items contained in this SOW. Extraneous material, which does not apply to the project, must be deleted. The Contractor must specify all items in full to assure quality construction and compliance. The electronic specification files shall be provided in Microsoft WORD and Adobe PDF.

3.7.6 The new system shall be programed and commissioned. The system designer will design the system in such a way to tie-in with the existing Mass Notification devices, ensuring that these devices will act as alarm devices. The Fire Alarm system install must meet certain proprietary requirements due to the existing transceivers, that includes the following:

a. Gamewell-FCI FAP model S3 (addressable) connected through an RS-232 port for reporting the exact device location to the fire dispatch center.

b. Install the new Fire Alarm panel and the SigCom Transmitter model DTX with 4 zones (RS-232/RS-

485) close to the MNS system at the entrance of the building.

3.8 Construction Phase

3.8.1 Upon the approval of the submitted plans and specifications, the Contractor may commence onsite construction activities. During the Construction Phase, construction and the delivery and warranting of the project/facility take place. The Contractor shall provide all labor, materials, and equipment to install, construct and complete the work designed in accordance with this Statement of Work.

3.8.2 On-Site Field Oversight. The Contractor shall provide the manpower, equipment, material, services, and transportation necessary to ensure oversight services throughout accomplishment of this SOW. The Government will provide on-going surveillance and submittal approval recommendations. The designated representative of the Government will report all findings to the Contracting Officer.

3.8.3 Pre-Final Inspection

The Contractor shall conduct a pre-final walk-through inspection and publish the pre-final inspection findings in a pre-final inspection report. CE and CO should be present at pre-final inspection. The

Contractor shall include all O&M manuals, operating instructions, and test reports for review. The Contractor shall provide training to base personnel by manufacturer’s representatives, as required.

3.8.4 Final Inspection

The Contractor shall conduct a final inspection and publish the findings in a Final Inspection Report. The inspection shall concentrate on the items identified at the pre-final inspection and recorded in the pre-final report. The final inspection report shall also certify that all items of the design have been implemented and that the construction is complete. The final inspection report shall also include as-built drawings with specifications verifying that all development standards have been met. As built drawings must be accepted by the Contracting Officer and BCE representative before final payments is completed.

3.8.5 Delivery/Warranty

The Contractor shall complete all inspection and demonstration requirements prior to final inspection. Following final inspection, the Contractor shall deliver to the Government the as-built drawings in the format and media as required by the SOW. The warranty shall be issued in accordance with FAR 52.246-21. Extended warranties offered by the Contractor and its subcontractors or suppliers may be accepted by the Government at its discretion.

3.8.6 Closeout Documents

Provide final construction As-built drawings stamped by a Certified Fire Protection Engineer. These documents are due five (5) calendar days after final inspection.

4.0 DELIVERABLES SCHEDULES

4.1 Construction Deliverables. The Contractor shall provide technical plans, designs and reports as detailed below and submit two copies each or electronically as permitted to the Contracting Officer (CO) for review and approval. Hard copies for all submittals as noted are required. Day means, unless otherwise specified, a calendar day.

4.2 Construction Schedule. The contractor shall provide a construction schedule to CE at or before the final design review.

4.3 Contract Progress Schedule. Within ten (10) calendar days after award or at the pre-construction conference, whichever is later, the Contractor shall submit a signed Contract Progress Schedule, depicting an overall contract progress schedule for the main elements of work for the period of performance. The Contractor shall also provide a line graph depicting scheduled construction progress throughout the period of performance. The progress schedule shall be signed by the CE representative recommending approval and approved by the Contracting Officer (CO). Once submitted, the approved contract progress schedule may only be changed by the CO.

4.4 Contract Progress Report. At least biweekly, the Contractor shall submit a Contract Progress

Report, signed by the Contractor’s on-site representative. The work elements and percentages stated on the Progress Report shall be identical to the work elements and percentages on the Contract Progress Schedule. To expedite Contractor payment approval, Contractors are encouraged to coordinate biweekly Progress Reports, obtain Government signature, and then attach a PDF file of the signed Progress Report to the Wide Area Workflow (WAWF) invoice submission.

4.5 Project Planning Chart and/or Construction Planning Chart. The Contractor shall prepare and submit a Project Planning Chart (PPC) for approval. The PPC shall detail the project schedule and status using Gantt charts, which shall indicate appropriately the percentage of work scheduled for completion by any given date during the period of this SOW. The PPC shall show both serial and parallel sub-tasks leading to deliverable products/reports, including early and late start and completion date with float.

4.6 The Contractor shall show the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the salient elements of the work and critical sub-tasks of each element. The PPC shall be in the form of a progressive bar chart indicating a logical sequence of work in each work phase and work area and shall indicate the percentage of work scheduled for completion by any given weekend date during the contracting period.

The Contractor shall revise the PPC as necessary to gain initial acceptance by the COR. In addition, the Contractor shall update the PPC by revising the original schedule by entering the actual start and completion dates of each work element and associated sub-tasks on the chart.

4.7 The Contractor shall submit one (1) full size hard copy of the final, corrected, and approved record drawings along with an electronic copy. The electronic copy of the drawings shall have one (1) set in AutoCAD latest version, with all X-References bound and one set with engineer’s stamp in PDF format.

4.8 The Contractor shall submit product submittals as indicated in the attached Submittal Register.

Also attached is a list of Deliverables that must be submitted to the Government for approval.

5.0 GOVERNMENT SUPPORT

5.1 In conjunction with the project, Westover ARB will provide the following support to the Contractor as detailed below.

A. Aid the Contractor in obtaining existing engineering plans, drawings, etc., to facilitate work required in the Statement of Work.

B. Arrange for a staging area(s) for storing equipment and supplies. The security of equipment and supplies shall be the Contractor’s responsibility.

C. Arrange for personnel identification badges, vehicle passes and/or entry permits with fourteen (14) calendar days or more of advance written notification. Request must be on a 439AW SF 1 Badge Form.

D. Arrange for access to the work areas.

E. All reasonably required amounts of water and electricity essential to contract performance will be made available at no cost to the Contractor from existing systems, outlets and supplies.

Any temporary connections shall be in strict accordance with applicable OSHA standards and in compliance with all Health and Safety Codes and Regulations. The Contractor shall carefully conserve any utilities furnished without charge. Abuse of this service will result in denial of free use and will be subject to charges at market rates.

F. Assist in arranging outages. Interruption of service for HVAC, Power, Lighting, Telephone, Fire Protection, Fire Detection, Water, Sewer, Gas, Roads, and Parking Lots are considered outages. Outages shall be scheduled at least two weeks prior to the desired time.

6.0 Execution

6.1 Post Award: After Notice to Proceed has been issued, The Contractor shall survey the existing system and layout to confirm the conditions spelled out in this SOW. The Contractor shall then provide a recommended solution that meets the requirements spelled out in this SOW. The proposed solution needs to include adequate detail on the fire alarm system and all the peripheral components. Once the system is approved, the Contractor shall purchase and install the system.

6.2 Additional Restrictions: Note that this building houses two (2) commander’s suites. These areas will have somewhat restricted access and advance scheduling of work will be required.

WESTOVER GENERAL CONDITIONS

INDEX

ARTICLE Page

1. TEMPORARY PROTECTION 12

2. SECURITY 12

3. UNDERGROUND UTILITIES, UTILITY INTERRUPTIONS 12-13

AND SHUTDOWNS

4. QUALITY ASSURANCE 13-14

5. CONCEALED WORK 14

6. SUBMITTALS 14

7. SUPERINTENDENCE BY THE CONTRACTOR 14

8. NOTIFICATION PRIOR TO CONSTRUCTION OR DEMOLITION 15

9. STORAGE AND HANDLING 15

10. SCHEDULING 15

11. DAMAGED PROPERTY 16

12. CLEANING UP 16

13. SAFETY PRECAUTIONS 16

14. ENVIRONMENTAL PROTECTION 16

15. HAZARDOUS MATERIAL REPORTING 16-17

16. HAUL ROUTES 17

17. TEMPORARY STAGING AND CONSTRUCTION AIDS 17

18. DELIVERY/WARRANTY 17-18

19. CONSTRUCTION/DEMOLITION WASTE MANAGEMENT

P LAN & REPORTING 18

20. FORMS 19-24

1. TEMPORARY PROTECTION

A. The Contractor shall protect all workmen, civilian and military personnel, and the public from injury. The Contractor shall coordinate and schedule all work with the Contracting Officer.

B. The Contractor shall conduct all work to cause the least interference possible with the normal activities of the operations of the airfield and surrounding areas.

2. SECURITY

A. All project work and conduct of construction activity must comply with all Base security regulations and policies.

B. Prior to any workers arriving at the site, the Contractor shall arrange for personnel identification badges, vehicle passes and/or entry permits with fourteen (14) days or more of advance written notification. Request must be on a 439AW SF 1 Badge Form. Badges shall be always worn and be visible while on the Base.

C. The Contractor shall be responsible for the return of all Identification Badges to the Contracting

Officer after completion of the project. Final payment will not be made until all badges are returned.

D. The Contractor shall enter the project site only at a location approved by the Contracting Officer.

Restrict all activities and movement of workers, supplies, and equipment to the designated project area and haul routes.

E. Site Security: The interior of the building shall be secured each day. Access to and from Building 1850 must be always maintained in some form, meaning that Government employees need to be able to always walk into and out of the area.

F. The Contractor will abide by local Westover ARB regulations and policy regarding base access, security, and other issues as directed by the Contracting Officer’s Representative (COR). The Contractor should notify the COR and the base POC immediately of all issues which may result in a delay of the project and/or impact quality of the work.

3. UNDERGROUND UTILITIES, UTILITY INTERRUPTIONS AND SHUTDOWNS

A. The Contractor shall submit a notification prior to excavation or any ground disturbing activity. The notification shall be Form 103, BCE Work Request (Dig Permit) and shall be submitted to the Contracting Officer at least (30) calendar days prior to the planned excavation. The Contractor shall obtain approval prior to excavation.

B. Report damage to underground utilities or subsurface construction immediately to the

Contracting Officer. Damage to marked utilities will be satisfactorily repaired or replaced by the Contractor at no additional cost to the government. Damage to unmarked utilities will be repaired or replaced at the government’s expense. Should the government engage the Contractor to perform the repairs or replacement; an equitable adjustment in the contract amount will be negotiated prior to the repair or replacement being made. Repair is defined as permanent, code compliant measures as approved by the Contracting Officer.

C. Interruptions shall be defined as any Contractor operation that interferes with access through, or use of facilities or areas including utilities, Energy Monitoring and Control Systems (EMCS), parking lots, generators, roads, or airfields.

D. Request for an interruption shall be submitted in writing at least fifteen (15) calendar days in advance of the date desired and includes at least one alternate date. Include the following information: Location(s) of interruption(s), hours and dates of interruption(s), which services are affected, and which facilities are affected. Contractor is cautioned that outages may not be granted on the date(s) requested. Contractor shall notify the Contracting Officer at least seven (7) calendar days in advance of any cancellation of any scheduled interruption. Services shall not be interrupted until receipt of approval of proposed hours and dates are received from the Contracting Officer.

4. QUALITY ASSURANCE

A. All items of work not addressed in these General Conditions shall be completed in strict accordance with the manufacturers’ specifications.

B. The quality assurance procedures of this section are a minimum. Provide additional quality control as required by the Contracting Officer. Any additional quality control, which may be required, shall not constitute a change in the contract.

C. The government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of his work. Government inspection is a general examination of the Contractor’s conduct and workmanship and is solely for the purpose of the government. Government inspectors do not have the authority to accept work, nor is government inspection to be construed as conclusive.

D. Government agents including inspectors, engineers and quality assurance evaluators are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in which the action of these agents could be construed as constituting a change.

E. The quality of workmanship is subject to audit by government or government-designated inspectors at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit.

F. The Contractor shall institute immediate action to correct all variances from the contract or General Conditions and employ all procedures necessary to ensure future work shall conform to the requirements of the contract.

G. The Contractor shall submit all requests for changes in writing to the Contracting Officer. Do not proceed with changes without possession of written authorization of the Contracting Officer.

5. CONCEALED WORK

The Contracting Officer must approve all items of work including those which are to be concealed.

The Contractor shall notify the Contracting Officer of his intention to conceal work 24 hours in advance of concealment.

6. SUBMITTALS

A. Approval must be obtained from the Contracting Officer for the material and equipment proposed to be incorporated into the work. Submittals shall be made no later than 30 working days after receipt of the Notice to Proceed or as specified by the Contracting Officer. The Contractor is to complete Air Force Form 3000, provided by the Contracting Officer, and if physical samples are necessary then contractor needs to submit.

The Contracting Officer will return the submittals approved or disapproved within 10 working days after receipt, by AF Form 3000. If submittals cannot be made within 30 days after Notice to Proceed or as specified by the Contracting Officer, the Contracting Officer shall be advised of the difficulty, at this time considerations will be taken in case there are project delays or any other reasons for the delay, then Contractor shall request an extension of time for this task. Approval of submittals does not relieve the Contractor from performance in strict accordance with the contract or Statement of Work, nor does such approval constitute “acceptance” under other conditions of this contract.

B. All “or equal” items or materials proposed by the Contractor to be used in the project shall be submitted for approval.

C. Items required to be submitted for approval are listed in the Statement of Work and are a minimum.

7. SUPERINTENDENCE BY THE CONTRACTOR

A. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent Superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor.

B. The Superintendent is to oversee and coordinate all project related work and is required to always be on site physical work is being performed. The Superintendent shall be able to read, write, speak and understand the English language.

C. Failure to comply with this requirement may be deemed as cause for a non-compensatory stoppage and suspension of work until the deficiency is remedied.

8. NOTIFICATION PRIOR TO CONSTRUCTION OR DEMOLITION

A. In accordance with the requirements of the Massachusetts Department of Environmental Protection (MADEP), the Contractor shall prepare and submit form BWP AQ 06, Notification Prior to Construction or Demolition, to the Department on behalf of the government. The Contractor is also responsible for the remittance of the $85.00 notification fee. Complete information is available from the Department or on the DEP Web site at mass.gov/dep.

B. The Contractor shall not begin any construction or perform any other physical work at the construction site until all material submittals and methods of installation are received and approved by the Contracting Officer and all approved materials have been delivered to the Base or are immediately available for delivery as the work progresses. The Contractor must coordinate all materials, equipment, and Subcontractors to minimize the duration of the work.

9. STORAGE AND HANDLING

A. All new materials shall be transported, stored, and handled according to the manufacturers’ written recommendations or as otherwise directed by the Contracting Officer. The Contractor shall conduct its operations in accordance with FAR Part 52.236-10.

B. A storage area(s) will be designated in the project’s vicinity as mutually agreed with the

Contracting Officer, Facility Manager and Chief of Construction. At the end of each workday, the Contractor shall remove all materials and equipment from the work site and store all materials and equipment within the assigned storage area(s).

10. SCHEDULING

A. All work shall be carefully scheduled to prevent any excessive shutdown time of utilities or services. The Contractor shall make written request to the Contracting Officer for approval of all work requiring shutdown 48 hours prior to commencement of such work.

B. The work sites will be available for contract work from Monday through Friday from the hours of 7:00 AM (0700 hours) to 4:15 PM (1615 hours), except federal holidays. If the Contractor desires or needs to perform work to maintain schedule during hours or days other than that stated, a written request, which is to include the number of work hours, starting times, dates of the proposed work and a statement that this after hour work is to be performed at no additional cost to the government, shall be submitted to the Contracting Officer seven (7) calendar days in advance. The Contracting Officer will review each such request and respond with written approval, approval with qualifications or restrictions if and as necessary, or disapproval.

C. The work at this facility shall be commenced as soon as possible and be diligently prosecuted through its completion, inspection, and acceptance.

11. DAMAGED PROPERTY

Work shall proceed in a manner which will minimize disturbance or risk of damage to surrounding structures, interior finishes, room furnishings, personal belongings, equipment or base infrastructure. The Contractor shall repair such items damaged by the Contractor while carrying out the work at no additional cost to the government. All repairs shall match adjacent similar existing items in all aspects. All replacements will be in kind.

12. CLEANING UP

The Contractor shall always, keep the premises free from accumulation of waste materials or rubbish caused by work under this contract. All parts and equipment removed for replacement become the property of the Contractor and shall be removed from the premises. At the end of each workday and upon the completion of all work, the Contractor shall leave interior and exterior property in the condition in which it was found at the beginning of work.

13. SAFETY PRECAUTIONS

The Contractor shall take all necessary precautions in observing safety regulations in accordance with all Federal OSHA regulations and shall assume the responsibility to guard against causing of fires and/or explosions and to protect government property. The Contractor shall perform the work in a manner consistent with security and with fire safety regulations especially regarding exits and exit way access. Temporary closures shall not compromise security or fire safety.

14. ENVIROMENTAL PROTECTION

There is no known or anticipated asbestos, lead nor any type of regulated hazardous material involved with the work of this project. However, to provide for control of all environmental pollution arising from construction activities, the Contractor and his subcontractors, in the performance of this contract, shall comply with all applicable federal state and local laws and regulations concerning environmental protection pollution control and abatement.

15. HAZARDOUS MATERIAL REPORTING

A. The Contractor shall maintain hazardous material inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR’s 355, 370, & 372) to be stored and used on this installation. Hazardous materials must be inventoried when received and at project completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).

B. Hazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval utilizing 439 AW Form 20, CONTRACTOR INFORMATION SHEET, at the end of this Section.

C. In the event of a spill, Contractor shall immediately notify the Base Fire Department at extension

911 as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.

D. Hazardous Material and Hazardous Waste Activities. The Contractor shall handle all hazardous materials and waste in accordance with all applicable federal, state, and local requirements. All hazardous materials shall be manifested, and prior to any hazardous materials leaving Westover ARB, the manifest shall be signed by Base Environmental Engineering, (413)557-2434 (not the Contracting Officer). The Contractor shall, within five (5) calendar days of the commencement of work, provide the Base Environmental Engineer with the name, address and EPA Number of all Treatment, Storage and Disposal Facilities that will be used to process Hazardous Waste generated at Westover ARB. The Contractor shall schedule (minimum of five (5) calendar days) all manifests with the Contracting Officer and Base Environmental Engineer for proper coordination to ensure appropriate and efficient tracking of the Contractor’s hazardous material purchases, inventories, use, and releases such as required by the Emergency Planning and Community Right-to-Know Act (EPCRA), EOs, or any installation reporting requirements.

E. The Contractor shall also comply with federal, state, and local requirements for any task involving the transportation of hazardous wastes and/or contaminated materials to off-site treatment, storage and/or disposal facilities. This includes 40 CFR 260, 49 CFR 172, 173, 178, 179 and all other applicable local, state, and federal transportation regulations.

16. HAUL ROUTES

The established haul access routes shall be the only routes used by the Contractor. The Contractor shall ensure that all vehicle operators associated with the project, or those of suppliers, are properly instructed before entering the Base.

17. TEMPORARY STAGING AND CONSTRUCTION AIDS

A. The Contractor shall provide, erect, maintain, and remove all necessary construction aids that are required for the performance of the work.

B. The Contractor shall provide all necessary personnel, facilities, equipment, and materials to complete the tasks identified in the SOW.

18. DELIVERY/WARRANTY

The Contractor shall complete all inspection and demonstration requirements prior to final inspection. The warranty shall be issued in accordance with FAR 52.246-21. Extended warranties offered by the Contractor and its subcontractors or suppliers may be accepted by the Government at its discretion. Contractor shall demonstrate capacity to provide local warranty support, within 8 hours for non-emergency issues or within 4 hours for an emergency issue and without the need for escort.

19. CONSTRUCTION/DEMOLITION WASTE MANAGEMENT PLAN AND REPORTING

A. Prior to the start of the work, the Contractor shall prepare and submit for approval the Construction Waste Management Plan utilizing the form provided at the end of this section.

B. The Contractor shall record, document and report the total amount of construction/demolition debris and other solid waste that is generated and disposed of under this contract. The Contractor shall also record the total amount of debris and waste that has been diverted through sale, reuse, or recycling and the quantity of waste disposed by landfill or incineration. The waste shall be recorded by weight, but volume in cubic yards will also be acceptable.

C. Contractor will salvage and reuse the construction/demolition debris to the greatest extent possible.

Waste materials that cannot be salvaged and/or reused and have value as being recyclable, shall be recycled. Only materials unable to be economically salvaged or recycled shall be transported to a landfill or incinerator. Revenues or other savings obtained for recycling or returns shall accrue to the Contractor, except revenues generated from Base recycling activities.

D. The records shall be made available to the Contracting Officer during construction and shall be submitted to the Contracting Officer prior to project closeout utilizing the Waste Management Summary Form also attached at the end of this section.

E. In accordance with the requirements of the Massachusetts Department of Environmental Protection (MADEP), the Contractor shall prepare and submit form BWP AQ 06, Notification Prior to Construction or Demolition, to the Department on behalf of the government. The Contractor is also responsible for the remittance of the notification fee of $85.00 as of this writing, or prevailing applicable at the time per MADEP. Complete information is available from the Department or on the DEP Web site at mass.gov/dep.

439 AW FORM 20, JUN 00 (EF-V1)

CONSTRUCTION WASTE MANAGEMENT PLAN SUBMITTED BY:

PROJECT NO: YTPM 24-0005 DATE:

I. PROJECT WASTE ANALYSIS

A. Types of Construction waste anticipated Quantities & Options Available (tons)

Resale Reuse Recycle Dispose 1.

2.

3.

4.

B. Projected Cost of Disposal Total Quantity (Tons)

Total Disposal Cost

(All trash with no salvage or recycling)

II. LANDFILLS AND INCINERATORS TO BE USED

Name Tipping Fee

Address Telephone

1.

2.

III. SALVAGE PLAN (FOR RESALE, REUSE, OR RECYCLE)

A. List of Materials & Method of Reuse Recycling Facility & Means of Transport

B. Cost to Salvage Savings Resulting from Salvage Net Cost/Savings

Cost to Separate and Recycle Reuse of Demo

Materials Revenues from

Sale Avoidance of Tipping Fees (Savings – Costs)

1.

2.

3.

IV. RECYCLING MANAGEMENT PLAN TO PROTECT RECYCLED MATERIALS FROMCONTAMINATION: Provide containers and bins that are clearly and appropriately marked.

1. Prevent contamination of recyclable materials from incompatible products and materials.

2. Separate construction waste at the project site by one of the following methods: (check appropriate boxes)

Source Separated Method: Waste products and materials, that are recyclable, are separated from trash and sorted into appropriately marked separate containers and then transported to the respective recycling facility for further processing. Trash is transported to a landfill or incinerator.

Co-Mingled Method: All construction waste is placed into a single container and then transported to a recycling facility where the recyclable materials are sorted and processed, and the remaining trash is transported to a landfill or incinerator.

Other methods proposed by the Contractor and approved by the Contracting Officer.

WASTE MANAGEMENT

SUMMARY FORM

I. PROJECT WASTE FROM (COMPANY):

QUANTITY

(TONS)

LANDFILL SITE

(# from Sect.

II of Waste Mgt. Plan above)

TIP

FEE/TON

TOTAL COST

OF DISPOSAL,

INCLUDING

HAULING,

CONTAINER

RENTAL, TIP

FEES

TOTAL

COST/TON

PROJECT NO: YTPM 24-0005

SUBMITTAL DATE:

TIME PERIOD

(Month/year or Total Project start date to end date):

II. ALTERNATIVES TO LAND FILLING

TYPE OF

MATERIAL

QUANTIT

Y

(TONS)

DESTINATION AND

MEANS OF

TRANSPORTATION

(# from Section IV of Waste

Management. Plan above)

COST TO

HANDLE

AND

TRANSPOR

T

REVENUE

& TIP FEE

EARNINGS

NET

COST

COST IF

LANDFILLED

COMPARISON

COST (+) OR

SAVINGS (-)

Cardboard

Wood

Beverage containers

Soil

Concrete

CMU

Asphalt

Metals

Gypsum board

Paint

Carpet

Insulation

Glass

Cast stone

Electric cable

PVC piping

Rubber flooring

Raised flooring

Copper

Plastics

III. TOTAL NET COST (+) OR SAVINGS (-) from all alternatives to land filling all project waste

TOTAL

20. FORMS

439 AW FORM 0-15

CONTRACTOR INFORMATION SHEET

PROJECT NAME: R e p a i r F i r e A l a r m S y s t e m , B l d g 1 8 5 0

PROJECT NUMBER: Y T P M 2 4 - 0 0 0 5

COMPANY NAME:

DATES OF CONTRACT:

LOCATION ON BASE: Building 1850

TELEPHONE NUMBER (On base, if available):

NAME OF CONTACT:

SHOP CODE (Assigned by HAZMART):

MATERIAL INFORMATION

MATERIAL NAME/

PART NUMBER

MFR

CONTAINER

TYPE

QTY

SIZE

TOTAL QTY

TO BE USED

(Estimated)

NSN/LSN

TO BE FILLED

IN BY

PHARMACY

PERSONNEL

QUARTERLY REPORT

WESTOVER CONSTRUCTION/DEMO DEBRIS DISPOSAL & RECYCLING

Form Created By: 439 MSG/CEV Environmental Office

To meet the Air Force goal of diverting 60% of Construction and Demolition (C&D) Debris from the Waste Stream and the Massachusetts landfill‐banned items law, Contractors shall recycle C&D debris to the maximum extent possible. This form should include data for the previous three-month period for the ENTIRE duration of the project. Drop‐off this Form at Westover Environmental Office, 250 Patriot Avenue or email to Environmental Office: champanine.saviengvong@us.af.mil (phone 607-237-5133)

ACCEPTABLE TO FILL OUT THIS FORM EITHER ELECTRONICALLY OR PEN & INK.

PROJECT TITLE:

CONTRACTOR COMPANY NAME:

WHICH QUARTER (Jan-Mar, Apr-Jun, Jul-Sept, or Oct-Dec):

TYPE ITEMS RECYCLED or RE-USED:

Concrete without rebar Concrete with rebar Asphalt Roofing Materials

Scrap Metals Wood Concrete Block / Cinder Block /

Brick Clay

Furniture (Salvaged)

General Construction Debris (Sorting facility accepts a comingled/mixed‐waste load.)

Other: Specify Other: Specify

TONNAGE OF ITEMS RECYCLED: TONS

{Be Comprehensive, Report Anything That Didn’t Go to The Landfill.}

DISPOSED OF BY LANDFILL: TONS

DISPOSED OF THROUGH REGULAR INCINERATION: TONS DISPOSED OF

BY WASTE-TO-ENERGY INCINERATION: TONS

YTPM 24-0005

QUARTERLY REPORT

WESTOVER CONSTRUCTION/DEMO DEBRIS DISPOSAL & RECYCLING

Form Created By: 439 MSG/CEV Environmental Office

TOTAL COST FOR CONSTRUCTION/DEMO DEBRIS LANDFILLED THIS QUARTER:

ACTUAL COST OF DEBRIS DIVERTED (from landfill) THIS QUARTER: $

*** If answer (cost to perform recycling/salvage/reuse/donation associated with the effort to minimize landfilling) is ZERO, then answer the following question.

POTENTIAL COST OF DEBRIS DIVERTED (from landfill) THIS QUARTER:

When cost (to salvage/recycle) is offset by proceeds/rebates/savings to the point of there being zero dollars paid out, then contractor still must provide an estimated “cost avoidance” value. This means contractor must at least roughly estimate the POTENTIAL cost of recycling (i.e., transportation, handling, collection, manpower, fees, taxes, permits, tariffs, collection containers lease/purchase, etc.).

CONTRACTOR SIGNATURE & DATE ( NOTE: Electronic Signature Acceptable)

-- End of Division 1 –