This is a pre-solicitation notice for a construction project solicitation to upgrade the Senator Wash Pump Generating Plant. The Bureau of Reclamation intends to issue solicitation number 140R3022R0001 on or around January 10, 2022 for upgrading motor protective relays, furnishing and installing a permanent engine-generator set, furnishing and installing distribution panelboards, and interfacing pump-generation unit control with a contractor designed, furnished, and installed SCADA system. The project location is Senator Wash approximately 22 miles northwest of Yuma, Arizona. The period of performance will begin on or about April 1, 2022 with 365 days to complete the work. The estimated price range for this project is between $1 million to $5 million. A pre-proposal site visit will be scheduled and information will be included in the solicitation. This will be a full and open competition set aside under NAICS code 238210 with a size standard of $16.5 million. The solicitation will be issued electronically on sam.gov and offerors should register on SAM to receive notifications. Proposals will be due 30 days after solicitation issuance. Bonds will be required.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140R3022R0001_Amendment_No__0002_Package_0002.pdf | ||
| Sol_140R3022R0001_Amd_0002.pdf | ||
| Sol_140R3022R0001_Amd_0001.pdf | ||
| 140R3022R0001_Amendment_No__0001_0001.pdf | ||
| Attachment_10_-_Directions.pdf | ||
| Attachment_7_-_Certification_Vaccination_PRAv7_Contractors_(2).pdf | ||
| Attachment_8_-_DI-137.pdf | ||
| Attachment_4_-_Construction_Invoice_Requirement.pdf | ||
| Attachment_1_Specifications_06222021.pdf | ||
| Attachment_9_Past_Performance_Questionnaire.pdf | ||
| Attachment_6_-_Form_E_Waste_Diversion_Table.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_11_-_Subcontracting_Plan_Template.pdf | ||
| Attachment_5_-_Bond_Forms.pdf | ||
| Attachment_2_-_Drawings.pdf | ||
| Sol_140R3022R0001.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. 140R3022R0001 Contract No. TBD Full and Open Competition Request for Proposal
Senator Wash Pump/ Generating Plant
U.S. Department of the Interior Bureau of Reclamation Interior Region 8: Lower Colorado Basin
This page intentionally left blank.
FOREWORD
Solicitation No.
140R3022R0001
Project Title Senator Wash Pump/Generating Plant
The Bureau of Reclamation, Lower Colorado Basin, Yuma Area Office, has a requirement to upgrade the Senator Wash Pump/Generating Plant.
Senator Wash Dam forms an off stream regulatory reservoir west of the Colorado River 22-miles northeast of Yuma, Arizona, in Imperial County, California as shown on Location Map, drawing 423-D- 187.
Project involves the removal and replacement of motor protective relays, furnishing and installing a permanent engine-generator set, furnishing and installing distribution panelboards, and interfacing pump-generation unit control with a contractor designed, furnished, and installed SCADA system.
This acquisition is being procured under Federal Acquisition Regulations Part 15, Contracting by Negotiation. Offeror is cautioned to carefully review the offer submission requirements contained in Section L and the evaluation standards contained in Section M. In order to be considered qualified for this work, offerors must fully address all requirements. Reference Section L, for instructions and Section M, paragraph M.1 for evaluation standards. The Government anticipates making award without discussions.
Solicitation/contract subject to the FAR, current through Federal Acquisition Circulars (FAC) 2022-03, effective date January 1, 2022.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, this construction project is estimated to be between $1,000,000.00 and $5,000,000.00.
In accordance with FAR 19.702(a)(2) If a Large Business submits a proposal it shall submit a subcontracting plan as part of its package. Large Businesses will not be eligible for award if they fail to submit an acceptable Subcontracting Plan.
SITE VISIT: See Section L.8, FAR 52.236-27 Site Visit (Construction) for information regarding the organized site visit. A site visit will be held on February 10, 2022 at 9:00 am, Arizona Time. Attendees will meet at the at Senator Wash Pumping - Generating Plant (See Attached Directions- Attachment 10).
Contact Virginia Toledo at vtoledo@usbr.gov if you intend to attend the site visit. If no notification is received from interested vendors, the site visit will be cancelled.
Vendors are urged and expected to inspect the site where work is to be performed and to satisfy themselves regarding all general and local conditions that may affect the price of the work to be performed, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitutes grounds for a claim after award of purchase order.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this solicitation. Please submit all written questions pertaining to this solicitation to Virginia Toledo, email vtoledo@usbr.gov. no later than February 18, 2022 at COB 4:00 pm. The subject line shall clearly reference the Solicitation Number associated with this solicitation. No questions will be entertained after this date.
For date and place of receipt of proposals see Contract Form -Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442.
Solicitation No.
Project Title Senator Wash Pump/Generating Plant
OTHER NOTES TO VENDORS:
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html ) which is applicable to work to be performed, see clause WBR 1452.223-81 Safety and Health.
Table of Contents Solicitation No.
Project Title Senator Wash Pump/Generating Plant i
TABLE OF CONTENTS
TABLE OF CONTENTS i-ii
PART I – THE SCHEDULE
SECTION A – Solicitation/Contract Form - SF-1442 A-1
SECTION B - Supplies or Services and Prices/Costs
B.1 The Requirement B-1 B.2 Price Schedule B-1
SECTION C – Description/Specifications/Statement of Work C-1
C.1 Description/Specification/Statement of Work C-1
SECTION D - Packaging and Marking – Not applicable. D-1
SECTION E - Inspection and Acceptance E-1
E.1 52.252-2 Clauses Incorporated by Reference E-1
SECTION F - Deliveries or Performance F-1
F.1 52.252-2 Clauses Incorporated by Reference F-1 F.2 52.211-10 Commencement, Prosecution, and Completion of Work F-1
SECTION G - Contract Administration Data G-1
G.1 1452.201-70 Authorities and Delegations G-1 G.2 1452.242-80 Postaward Conference-Bureau of Reclamation G-2 G.3 Electronic Invoicing and Payment Requirements – Internet Payment
Platform (IPP) G-2
G.4 Contractor’s Administration Personnel G-2
SECTION H - Special Contract Requirements H-1
H.1 Notice of Contractor-Contractor Performance Assessment Reporting System
H-1
PART II - CONTRACT CLAUSES
SECTION I - Contract Clauses I-1 I.1 52.252-2 Clauses Incorporated by Reference I-1 I.2 52.204-25 Prohibition on Contracting for Certain Telecommunications and
Video Surveillance Services or Equipment I-4
I.3 52.222-35 Equal Opportunity for Veterans I-6 I.4 52.222-36 Equal Opportunity for Workers with Disabilities I-7 I.5 52.225-09 Buy American Act – Construction Materials I-7 I.6 52.228-01 Bid Guarantee I-10 I.7 52.244-6 Subcontracts for Commercial Items I-11 I.8 52.262-6 Authorized Deviations in Clauses I-13 I.9 1452.203-70 Restriction on Endorsements – DOI I-13
I.10 1452.204-70 Release of Claims – DOI I-13 I.11 1452.228-70 Liability Insurance – DOI I-13 I.12 WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and I-14
Table of Contents Solicitation No.
Project Title
Limitations – BOR
I.13 WBR 1452.223-81 Safety and Health – BOR I-15 I.14 WBR 1452.231-81 Equipment Ownership and Operating Expense – BOR I-16 I.15 WBR 1452.232-81 Payment for Mobilization and Preparatory Work – BOR I-18 I.16 WBR 1452.236-08 Other Contracts (Deviations) I-19 I.17 WBR 1452.236-84 Preservations of Cultural Resources – BOR I-20 I.18 WBR 1452.237-80 Security Requirements – BOR I-21 I.19 WBR 1452.243-80 Modifications Proposals – BOR I-31
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J - List of Attachments J-1 J.1 Applicability of Documents J-1 J.2 List of Contract Documents J-1
PART IV-REPRESENTATIONS AND INSTRUCTIONS
(This part will be removed after award.)
SECTION K - Representations, Certifications and Other Statements of Offerors K-1 K.1 Solicitation Provisions Incorporated by Reference K-1 K.2 52.204-08 Annual Representations and Certificates K-1 K.3 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment K-5
K.4 52.209-07 Information Regarding Responsibility Matters K-7 K.5 52.209-13 Violation of Arms Control Treaties or Agreements Certifications K-8
SECTION L - Instructions, Conditions and Notices to Offerors L-1
L.1 Solicitation Provisions Incorporated by Reference L-1 L.2 52.211-03 Availability of Specifications not Listed in the GSA Index of
Federal Specifications, Standards and Commercial Item Descriptions L-1
L.3 52.216-01 Type of Contract L-4 L.4 52.222-05 Construction Wage Rate Requirements – Secondary Site of the
Work L-4
L.5 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
L-4
L.6 52.225-10 Notice of Buy American Requirement – Construction Materials L-5 L.7 1452.233-02 Service of Protest – DOI L-6 L.8 52.236-27 Site Visit L-7 L.9 52.252-5 Authorized Deviations in Provisions L-7
L.10 WBR 1452.236-85 Preparatory Work Schedule Line Item – BOR L-7 L.11 WBR 1452.215-80 Source Selection Evaluation Procedures – BOR L-7 L.12 WBR 1452.215-81 Proposal Instructions – BOR L-8
SECTION M - Evaluation Factors for Award M-1
M.1 WBR 1452.215-82 Evaluation Factors for Award – Quality Predominance –
BOR
M-1
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040562118
Bureau of Reclamation
Lower Colorado Region
Yuma Area Office 7301 Calle Agua Salada
R34
Yuma AZ 85364
Bureau of Reclamation - Yuma Area Office
Attn: Virginia Toledo 7301 Calle Agua Salada Yuma, AZ 85364
Virginia Toledo 9283438136
1x 01/31/2022
140R3022R0001
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Senator Wash Pump/Generating Pumping Plant
FULL AND OPEN COMPETITION
NAICS CODE: The North American Industry Classification System (NAICS) code for this acquisition is 238210 and the small business size standard is $16.5 million.
Magnitude of Construction Project: This construction project is estimated to be between $1,000,000.00 and $5,000,000.00.
This solicitation is issued as Request for Proposal in accordance with FAR Part 15
-Contracting by Negotiation.
Proposal Submission/Mailing/Express Mail: Contractor's proposal shall be received by the Bureau of Reclamation, Yuma Area Office, Attn: Virginia Toledo (LC-10304), 7301
Calle Agua Salada, Yuma, AZ 85364.
OFFEROR SHALL CLEARLY MARK ON THE PACKAGE THE SOLICITATION NO. 140R3022R0001
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
14 365 calendar days and complete it within ________________ ________________ calendar days after receiving
SECTION F.2 Clause 52.211-10
03/03/2022
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Bureau of Reclamation Lower Colorado Region
Yuma Area Office 7301 Calle Agua Salada
R34
Yuma AZ 85364
Virginia Toledo
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R3022R0001
00010 SECTION B SUPPLIES OR SERVICES AND PRICES
SENATOR WASH PUMP GENERTING PLANT (PRICE SCHEDULE
CLINs 1-12, EXCEPT CLIN 11 AND 13)
00020 SECTION B SUPPLIES OR SERVICES AND PRICES
SENATOR WASH SCADA SYSTEM/COMMUNICATION SYSTEM
(Price Schedule CLINs 11 and 13)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section A – Solicitation, Offer and Award
Solicitation No.
140R3022R0001
Project Title
This Page Intentionally Left Blank
Section B – Supplies or Services and Prices/Costs
Solicitation No.
140R3022R0001
Project Title
Page B-1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Vendors are cautioned to carefully review the quote submission requirements contained in Section L.11. Failure to comply with these requirements may result in a quote being determined unacceptable.
(c) Proposals will be considered for award on the schedule in Paragraph B.2, but no proposal will be considered for award for only a part of the schedules or a part of any single schedule. Proposals for only a part of the schedules or parts of a single schedule may be determined unacceptable.
(d) Vendors shall complete the schedule(s) in Section B and Solicitation, Offer, and Award (Construction, Alteration or Repair) SF-1442, etc.
(e) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”
(f) IMPORTANT NOTE: The requirement for submission of performance and payment bonds is applicable for construction in excess of $150,000.00.
(g) Definitions:
(1) CLIN – Contract Line Item Number
B.2 PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the lump sum $
2 52.228-15 Bonds For the lump sum $
3 01 51 01 Temporary Station Service System
For the lump sum $
4 01 78 30 Final As-built Drawings and Manuals
For the lump sum $
5 01 79 20 Training For the lump sum $
6 01 91 13 Commissioning For the lump sum $
Section B – Supplies or Services and Prices/Costs
Solicitation No.
140R3022R0001
Project Title
Page B-2
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
7 26 05 02 Complete Electrical System
For the lump sum $
8 26 05 10 Conductors and Cables For the lump sum $
9 26 05 20 Grounding and Bonding For the lump sum $
10 26 05 30 Electrical Conduit For the lump sum $
11 26 09 15 SCADA System For the lump sum $
12 26 32 13 Diesel Engine-generator Set
For the lump sum $
13 27 20 01 Communication System For the lump sum $
Total $
Section C – Description Specification/ Statement of Work
Solicitation No.
140R3022R0001
Project Title
Page C-1
SECTION C – DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
C.1 DESCRIPTION/SPECIFICATIONS/ STATEMENT OF WORK
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Specifications and Drawings contained in Attachment No. 1 and 2 of this solicitation.
Section C – Description and Specifications
Solicitation No.
140R3022R0001
Project Title
Page C-2
Section D – Packaging and Marking
Solicitation No.
140R3022R0001
Project Title
Page D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
Section D – Packaging and Marking
Solicitation No.
140R3022R0001
Project Title
Page D-2
Section E – Inspection and Acceptance
Solicitation No.
140R3022R0001
Project Title
Page E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.246-12 Inspection of Construction August 1996
Section E – Inspection and Acceptance
Solicitation No.
140R3022R0001
Project Title
Page E-2
Section F – Deliveries or Performance
Solicitation No.
140R3022R0001
Project Title
Page F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.242-14 Suspension of Work April 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION
OF WORK
APRIL 1984
The Contractor shall be required to (a) commence work under this contract within 14 calendar days after notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 days after the date the Contractor receives the notice to proceed. The time stated for completion shall include option items (if awarded) and final cleanup of the premises.
Section F – Deliveries or Performance
Solicitation No.
140R3022R0001
Project Title
Page F-2
This page left intentionally blank.
Section G – Contract Administration Data
Solicitation No.
140R3022R0001
Project Title Senator Wash Pump/Generating Plant
Page G-1
SECTION G – CONTRACT ADMINSTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
Section G – Contract Administration Data
Solicitation No.
140R3022R0001
Project Title Senator Wash Pump/Generating Plant
Page G-2
G.2 WBR
1452.242-80
POSTAWARD CONFERENCE - BUREAU OF
RECLAMATION
JULY 1993
(a) Prior to the Contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
G.3 ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS – INTERNET PAYMENT PLATFORM
(IPP)
APRIL 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Invoice Processing Platform (IPP). “Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted to the Contract Specialist/Contracting Officer (vtoledo@usbr.gov) prior to entering the payment request in IPP:
1) Invoice (Construction)
2) Subcontractor/Supplier Payment Summary; and
3) Any additional documentation to substantiate each progress payment request and as required by the Contracting Officer’s Representative or Contracting Officer.
The forms identified above are included in Attachment 4.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 CONTRACTOR’S ADMINISTRATION PERSONNEL
Name: ________________________________________________ Title: _________________________________________________ Address: ______________________________________________
City/State/Zip: _________________________________________ Telephone No: _________________________________________ Fax No.: ______________________________________________ (Complete and submit with Proposal.).
Section H – Special Contract Requirements
Solicitation No.
140R3022R0001
Project Title
Page H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 DOI-AAAP
NOTICE TO CONTRACTOR-- CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING
SYSTEM
DECEMBER 2015
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.
The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
Section H – Special Contract Requirements
Solicitation No.
140R3022R0001
Project Title
Page H-2
b. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7. If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
Section I – Contract Clauses
Solicitation No.
140R3022R0001
Project Title
Page I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEBRUARY 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations (FAR) clauses: https://www.acquisition.gov/browse/index/far and Department of the Interior Acquisition Regulations (DIAR) clauses: https://www.acquisition.gov/diar
In addition, clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-01, etc.; and DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70.
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.202-1 Definitions JUNE 2020 52.203-3 Gratuities APRIL 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government NOVEMBER 2021 52.203-7 Anti-Kickback Procedures JUNE 2020 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
JUNE 2020
52.203-17 Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights
JUNE 2020
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JANUARY 2017
52.204-2 Alt II Security Requirements, Alternate II (Apr 1984) AUGUST 1996 52.204-4 Printed or Copied Double-Sided on Post Consumer Fiber Content
Paper
MAY 2011
52.204-9 Personal Identity Verification of Contractor Personnel JANUARY 2011 52.204-10 Reporting Executive Compensation and First - Tier Subcontract
Awards
JUNE 2020
52.204-13 System for Award Management Maintenance OCTOBER 2018 52.204-14 Service Contract Reporting Requirements OCTOBER 2016 52.204-23 Prohibition on Contracting for Hardware, Software, and Services
Developed or Provided by Kaspersky Lab and Other Covered Entities
NOVEMBER 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOVEMBER 2021
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations NOVEMBER 2015 52.215-2 Audit and Records – Negotiation JUNE 2020 52.215-8 Order of Precedence-Uniform Contract Format OCTOBER 1997 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
JUNE 2020
52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications JUNE 2020 52.215-15 Pension Adjustments and Asset Reversions OCTOBER 2010 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits JULY 2005
Solicitation No.
140R3022R0001
Project Title
Page I-2
(PRB) Other Than Pensions
52.215-19 Notification of Ownership Changes OCTOBER 1997 52.215-21 Alt III Requirements for Certified Cost or Pricing Data and Data other than Certified Cost or Pricing Data--Modifications (Jun 2020)
NOVEMBER 2021
52.216-7 Alt I Allowable Cost and Payment Alt I (August 2018) FEBRUARY 1997 52.219-8 Utilization of Small Business Concerns OCTOBER 2018 52.219-9 Small Business Subcontracting Plan NOVEMBER 2021 52.219-16 Liquidated Damages – Subcontracting Plan SEPTEMBER 2021 52.219-28 Post-Award Small Business Program Rerepresentation SEPTEMBER 2021 52.222-3 Convict Labor JUNE 2003 52.222-4 Contract Work Hours and Safety Standards – Overtime
Compensation
MAR 2018
52.222-6 Construction Wage Rate Requirements AUGUST 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JULY 2021 52.222-9 Apprentices and Trainees JULY 2005 52.222-10 Compliance with Copeland Act Requirements FEBRUARY 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEBRUARY 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APRIL 2015 52.222-26 Equal Opportunity SEPTEMBER 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APRIL 2015 52.222-34 Project Labor Agreement MAY 2010 52.222-37 Employment Reports on Veterans JUNE 2020 52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DECEMBER 2010
52.222-50 Combating Trafficking in Persons NOVEMBER 2021 52.222-54 Employment Eligibility Verification NOVEMBER 2021 52.222-55 Minimum Wages Under Executive Order 13658 JANUARY 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JANUARY 2022 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts
SEPTEMBER 2013
52.223-3 Alt I Hazardous Material Identification and Material Safety Data - Alternate I (July 1995)
FEBRUARY 2021
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug Free Workplace MAY 2001 52.223-11 Ozone-Depleting Substances and High Global Warming Potential
Hydrofluorocarbons
JUNE 2016
52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-16 Acquisition of EPEAT®-Registered Personal Computer Products DECEMBER 2007 52.223-17 Affirmative Procurement of EPA-designated Items in Service and
Construction Contracts (May 2008)
AUGUST 2018
52.223-18 Encouraging Contractor Policies to Ban text Messaging While Driving
JUNE 2020
52.225-13 Restrictions on Certain Foreign Purchases FEBRUARY 2021 52.227-1 Authorization and Consent JUNE 2020 52.227-2 Notice and Assistance Regarding Patent And Copy Infringement JUNE 2020
Solicitation No.
140R3022R0001
Project Title
Page I-3
52.227-4 Patent Indemnity-Construction Contracts DECEMBER 2007 52.228-2 Additional Bond Security OCTOBER 1997 52.228-5 Insurance - Work On A Government Installation JANUARY 1997 52.228-11 Individual Surety - Pledges of Assets FEBRUARY 2021 52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOVEMBER 2014 52.228-15 Performance and Payment Bonds--Construction JUNE 2020 52.229-3 Federal, State And Local Taxes FEBRUARY 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JANUARY 2017 52.232-33 Payment by Electronic Funds Transfer—System for Award
Management
OCTOBER 2018
52.232-39 Unenforceability of Unauthorized Obligations JUNE 2013 52.232-40 Providing Accelerated Payment to Small Business Subcontractor NOVEMBER 2021 52.233-1 Alt I Disputes - Alternate I (December 1991) MAY 2014 52.233-3 Protest After Award AUGUST 1996 52.233-4 Applicable Law for Breach of Contract Claim OCTOBER 2004 52.236-2 Differing Site Conditions APRIL 1984 52.236-3 Site Investigation and Conditions Affecting the Work APRIL 1984 52.236-5 Material and Workmanship APRIL 1984 52.236-6 Superintendence by the Contractor APRIL 1984 52.236-7 Permits and Responsibilities NOVEMBER 1991 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APRIL 1984
52.236-10 Operations and Storage Areas APRIL 1984 52.236-11 Use and Possession Prior to Completion APRIL 1984 52.236-12 Cleaning Up APRIL 1984 52.236-13 Alt I Accident Prevention, Alternate I (Nov 1991) NOBEMBER 1991 52.236-14 Availability and Use of Utility Services APRIL 1984 52.236-15 Schedules for Construction Contracts APRIL 1984 52.236-17 Layout of Work APRIL 1984 52.236-21 Alt I Specifications and Drawings for Construction, Alternate I (Apr
1984).
FEBRUARY 1997
52.236-26 Preconstruction Conference FEBRUARY 1995 52.237-2 Protection of Government Buildings, Equipment, and Vegetation APRIL 1984 52.242-13 Bankruptcy JULY 1995 52.243-4 Changes JUNE 2007 52.244-2 Subcontracts JUNE 2020 52.246-21 Warranty of Construction MARCH 1984 52.248-3 Alt I Value Engineering-Construction, Alternate I (April 1984) OCTOBER 2015 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) -
Alternate I (September 1996)
APR 2012
52.249-10 Default (Fixed-Price Construction) APRIL 1984 52.253-1 Computer Generated Forms JANUARY 1991
Solicitation No.
140R3022R0001
Project Title
Page I-4
I.2 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN
TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT
(a) Definitions. As used in this clause—
Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).
Covered foreign country means The People’s Republic of China.
Covered telecommunications equipment or services means–
(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities);
(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities);
(3) Telecommunications or video surveillance services provided by such entities or using such equipment;
or
(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.
Critical technology means–
(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;
(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-
(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or
(ii) For reasons relating to regional stability or surreptitious listening;
(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);
Solicitation No.
140R3022R0001
Project Title
Page I-5
(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);
(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or
(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50 U.S.C. 4817).
Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.
Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of covered telecommunications equipment or services used by the entity that excludes the need to include an internal or third-party audit.
Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.
Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.
(b) Prohibition. (1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The Contractor is prohibited from providing to the Government any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract.
(c) Exceptions. This clause does not prohibit contractors from providing—
(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
Solicitation No.
140R3022R0001
Project Title
Page I-6
(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(d) Reporting requirement. (1) In the event the Contractor identifies covered telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the Contractor is notified of such by a subcontractor at any tier or by any other source, the Contractor shall report the information in paragraph (d)(2) of this clause to the Contracting Officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the Contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the Contractor shall report to the Contracting Officer for the indefinite delivery contract and the Contracting Officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.
(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause
(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier unique entity identifier (if known);
supplier Commercial and Government Entity (CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description;
and any readily available information about mitigation actions undertaken or recommended.
(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause:
any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of covered telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.
(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.
I.3 52.222-35 EQUAL OPPORTUNITY FOR VETERANS JUNE 2020
(a) Definitions. As used in this clause-
“Active duty wartime or campaign badge veteran,” “Armed Forces service medal veteran,” “disabled veteran,” “protected veteran,” “qualified disabled veteran,” and “recently separated veteran” have the meanings given at Federal Acquisition Regulation (FAR) 22.1301.
(b)Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c)Subcontracts. The Contractor shall insert the terms of this clause in subcontracts valued at or above the threshold specified in FAR 22.1303(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for
Solicitation No.
140R3022R0001
Project Title
Page I-7 noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.4 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH
DISABILITIES
JUNE 2020
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b)Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of the threshold specified in Federal Acquisition Regulation (FAR) 22.1408(a) on the date of subcontract award, unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
I.5 52.225-09 BUY AMERICAN ACT – CONSTRUCTION
MATERIALS
((a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification,…