01-Att E-CS Engineer Drawing Requirements -Attachment E CoverSheet-fillable-add CS drawings.pdf

PDF 80 KB Posted

Attached to
F30001 Workstation Expansion MAX Out 2026TP096
Solicitation number
FA860126Q0111
Issued by

About this file

This document is an Engineer Drawing Requirements specification for a communications and structured cabling project at Wright Patterson Air Force Base, Ohio. The project, designated F30001 Workstation Expansion MAX Out 2026TP096, requires the contractor to develop detailed engineering drawings for cable plant installation supporting new furniture requirements.

The contractor must meet communications cable installation standards per 88 CS/SCXI supplied COMM engineered drawings (CS2026-TBD, Attachment E). Cable installation must comply with 88 CS Telecommunication Requirements (Attachment B), IFS appendix G11 Telecommunications for Wright Patterson AFB, and Telecommunications Industry Association (TIA)/Electronic Industries Association (EIA) standards. The project requires pulling back 124 existing CAT6 cables from surface mount boxes and installing 140 CAT6A cables (seven QNC units) from a 48-Port QUICKPORT patch panel in CER to drop locations in Project Room 1. Existing cables must be removed and discarded, raceway/surface mount boxes removed, and existing J-hooks raised to prevent newly installed cables from laying on ceiling tiles. Seven CAT6A cables must run from CER closest to Project Room 1 and 2 to designated drop locations. The contractor must conduct pre-testing, installation cabling per specifications, post testing, and quality inspections coordinated with 88 CS. Testing results must be submitted to CE Interior Design and 88 CS three days prior to quality assurance inspection. The cabling installer must be present during quality assurance inspection, and red-line drawing updates for any approved deviations must be provided post-inspection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01-Att E-CS.SCXI Engineer Requirements -Furniture Package Wright Patterson AFB, OH

Updated 31MAR2026

CS.SCXI Engineer Drawing Requirements For

CE Project Name:_________________________________________________________________

CS#: ______________________________________

Drawing Sheets Qty _______________________________________________________________

Project Cable Plant Requirements per Drawing Specification:

CE Project Name: F30001 Workstation Expansion MAX Out 2026TP096
CS: TBD
Drawing Sheets Qty: TBD
fill_4: CS Drawing Package in Process

COMM1- Meet the requirements stated in the 88 CS/SCXI supplied COMM engineered drawings CS2026-TBD - Attachment E.

The Contractor shall provide communications cable installation support for new furniture requirements listed in this attachment E . A certified data cabling installer must meet the Installation Facility Standard (IFS) (attachment C) requirements in appendix G11 Telecommunications for Wright Patterson AFB and 88 Communication Squadron (CS) Telecommunication Requirements for Furniture Packages (attachment B). See additional detail requirements for COMM cabling below.

The contractor shall comply with 88 CS Telecommunication Requirements (attachment B), the IFS appendix G11 Telecommunications for Wright Patterson AFB (attachment C), and Telecommunications Industry Association (TIA)/Electronic Industries Association (EIA Standards if any COMM/Data Line requirements are requested.

a) The Government 88 CS group will provide detailed drawings for installation as part of the furniture package.

b) Installation must meet 88 CS requirements of pre-testing, installation cabling requirements, labeling of ports, post testing, and pass quality inspection from 88 CS.

c) No abandon in place cables are acceptable on Wright Patterson AFB.

d) Testing results must be sent to CE Interior Design and 88 CS and installation drawings 3 days prior to quality inspection with 88 CS.

e) Cabling Installer shall be present during the quality assurance inspection.

f) Provide red-line drawing updates for any approved deviations to the drawings provided by 88 CS. Deviations must be approved by 88 CEN and 88 CS.

CS2026-TBD PROJECT Cable Plant Requirements:

The structured cable plant design will pull back the existing 124 CAT6 cables (two Dual Network Connections (two Dual Network Connections (DNCs) and two Quad Network Connections (QNCs)) running from CER to Project Room 1 in Facility 30001, coil in ceiling for reinstall after new furniture. A total of 140 CAT6A cables (seven QNCs) will be ran from a 48-Port QUICKPORT patch panel in CER to the drop locations in Project Room and terminated into 4-port faceplates that will be installed in the new systems furniture.

CABLE INSTALLER REQUIREMENTS

· Pull back the 124 existing CAT6 cables from the surface mount boxes in project room to the patch panels in CER and discard these cables at base recycling

· Remove and discard the associated raceway/surface mount boxes

· Raise the existing J-hooks in Project Room 1 so that the newly installed cables will not lay on the ceiling tiles

· Run 16 CAT6A cables (seven QNCs) from CER closest to Project Room 1 and 2 to the drop locations using the existing cable pathways

· Install 140 4-port surface mount boxes in the beltway at the bottom of the furniture for each drop locations

· Terminate these CAT6A cables into the surface mount boxes

· Install a new 2U 48-port QUICKPORT Patch Panel into RUs 25-26 of Rack A6 and label each port

· Terminate the 140 CAT6A cables into this patch panel