This is an Appendix A Capability Form template for vendors responding to the FAA's Market Survey regarding Alternative Energy Systems Equipment (AESE) procurement and life cycle support services. The form requires interested vendors to demonstrate past performance and current capability across multiple structured sections.

Vendors must provide detailed information on three previous contracts (Section A) and three current contracts (Section B) demonstrating similar size, scope, and complexity to the Draft SOW requirements, including program title, customer name, contract value, period of performance, place of performance, customer point of contact, and project dates within the past ten years. Section C requires vendors to confirm their ability to provide all required services and equipment—including personnel, program management, hardware, software, logistics, and training—by cross-referencing which contracts demonstrate these capabilities. Section D addresses AESE-specific equipment capabilities across multiple product categories: solar panels (200W to 600W+), solar charge controllers, microgrid controllers with switchboards/switchgear, inverters (RV/mobile and string-based PV systems ranging from 1kW to 1MW), energy storage systems (LFP batteries, BESS indoor/outdoor, hybrid supercapacitors), solar combiner boxes, and fixed ground mount/racking systems. Vendors must also provide manufacturing lead times (minimum and maximum, in months) for each equipment category and include mitigation strategies for any lead times exceeding 12 months along with communication plans for delay notification. Sections E through H address subcontracting arrangements, geographic service delivery capability (CONUS and OCONUS) with regional selection across nine U.S. regions and international locations, equipment refresh/obsolescence management approaches, and vendor feedback on the Draft SOW requirements and specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

In order to make the best determination, the FAA requires interested vendors to fill out Appendix A addressing the following and per the instructions below:

· Capability Questions start in Block A.

· Interested vendors may reference the same contract (A1, A2, A3, B1, B2, B3) for multiple citations.

· Supporting document attachments are permitted, provided they reference the specific contract (A1, A2, A3, B1, B2, B3) citation.

· If work was performed on a specific Task Order, cite both the Task Order number and the Base/Parent Contract number.

This form can be completed on Government and/or commercial sector projects. Scope may be represented on one contract/project or be represented on separate contract(s)/ project(s) providing same or similar services; within ten (10) years of the issuance of the Market Survey.

APPENDIX A

CAPABILITY FORM

Vendor Name: ____________________ A. Describe previous contracts similar in size, scope and complexity to the requirements outlined in the Draft Statement of Work (SOW). You must provide detailed information and past performance information for three (3) previous contracts including program title, customer name, project dates, customer point of contact (POC), and description of work performed.

Table 1: Previous Contract(s) Reference

Contract A1
Contract A2
Contract A3

Contract Name

Issuing Office

Total Estimated Value of the Contract/Projects(s):

Period of Performance(s):

Place of Performance(s):

Program Title

Customer Name

Customer POC

Project Dates (MM/DD/YY – MM/DD/YY)

A.1 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A1:

A.2 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A2:

A.3 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for previous contract A3:

B. Describe current contracts similar in size, scope and complexity to the requirements outlined in the Draft SOW. You must provide detailed information for three (3) current contracts including program title, customer name, project dates, project value, customer point of contact, and description of work performed.

Table 2: Current Contract(s) Reference

Contract B1
Contract B2
Contract B3

Contract Name

Issuing Office

Total Estimated Value of the Contract/Projects (s):

Period of Performance(s):

Place of Performance(s):

Program Title

Customer Name

Customer POC

Project Dates (MM/DD/YY – MM/DD/YY)

B.1 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B1:

B.2 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B2:

B.3 Provide a description of services provided similar in size, scope and complexity to the requirements outlined in the Draft SOW for current contract B3:

C. Please confirm whether your company has the ability to provide all required services and equipment to meet the FAA’s requirements as outlined in the Statement of Work, (Draft Section C).

Using the table provided below, indicate with an “X” or check mark the Contract(s) under which your company has provided or is currently providing services, as outlined in the respective sections of the Draft SOW.

Table 3: Services and Equipment

Contract A1
Contract A2
Contract A3
Contract B1
Contract B2
Contract B3

Personnel (C.3)

Program Management (C.4.1)

Hardware (C.4.2)

Software (C.4.3)

Logistics (C.4.4)

Training (C.4.5)

C.1 Provide a supporting narrative detailing how your company meets these requirements

D. Does your company have the capability to provide Alternative Energy Systems Equipment (AESE)?

Using the table provided below, indicate with an “X” or check mark the AESE which your company has provided or is currently providing.

Table 4: AESE Solar Panel

· 200W-400W

· 400W-600W

· 600W+

Solar Charge Controller

Microgrid Controller/w Switchboards or Switchgear

Inverter

· RV/Mobile: 1kW-3kW PV Systems

· String: 5kW-100kW PV Systems

· String or Central: 100kW-1MW PV Systems

Energy Storage

· LFP Batteries

· LFP BESS indoor/outdoor

· Hybrid Supercapacitor ESS

Solar Combiner Box

Fixed Ground Mount/ Racking Systems

D.1 Equipment Delivery Lead Time. Please identify estimated manufacturing lead times (in months) for each of the following equipment categories. For any lead times in excess of 12 months, please provide any suggested mitigation strategies to reduce the lead times in the space provided below the table. In addition, please provide an explanation of your communication plan to keep Customer informed of any delays.

Min
Max

Solar Panel

· 200W-400W

· 400W-600W

· 600W+

Solar Charge Controller

Microgrid Controller/w Switchboards or Switchgear

Inverter

· RV/Mobile:1kW-3kW PV Systems

· String: 5kW-100kW PV Systems

· String or Central: 100kW-1MW PV systems

Energy Storage

· LFP Batteries

· LFP BESS

· Hybrid Supercapacitor ESS

Solar Combiner Box

Fixed Ground Mount/ Racking Systems

Narrative:

E. If your company will require services of additional subcontractors to successfully meet the requirements of this contract, please identify any subcontracts, teaming agreements or partnerships and the estimated percentage of work each third party would perform against the total effort of the contract.

F. Describe your ability to deliver requirements of the SOW both within the continental United States (CONUS) and outside the continental United States (OCONUS). Include details describing your ability to provide on-site technical support CONUS and OCONUS in the narrative section below.

F.1 Using the table provided below, indicate with an “X” or check mark which region(s) your company is capable and/or interested in providing services in:

Table 4: Capable/Interested Region

Region
Insert “X”
1
Alaskan (AK)
2
Central (IA, KS, MO, NE)
3
Eastern (DC, DE, MD, NJ, NY, PA, VA, WV)
4
Great Lakes (IL, IN, MI, MN, ND, OH, SD, WI)
5
New England (CT, MA, ME, NH, RI, VT)
6
Northwest Mountain (CO, ID, MT, OR, UT, WA, WY)
7
Southern (AL, FL, GA, KY, MS, NC, PR, SC, TN, VI)
8
Southwest (AR, LA, NM, OK, TX)
9
Western-Pacific (AZ, CA, HI, NV, AS, GU, MH)
10
Turks and Caicos, Bahamas, Grand Bahama, Bimini, Andros Island, Cuba (Guantanamo Bay), Bermuda, Sint Maarten.

Note: A visual map of the regions can be found at https://www.faa.gov/airports Narrative:

G. Please discuss your approach to managing “equipment refresh/obsolescence” as it pertains to contract administration. Specifically, explain how the updating and revision of Section B should be accomplished during the contract period of performance to ensure the FAA continues to receive equipment that meets system requirements in a timely manner at a fair and reasonable cost without being overly administratively burdensome?

H. Please provide any relevant feedback, suggestions, or comments on the Section C DRAFT SOW and associated J Attachments included in this Market Survey to assist in the FAA’s procurement process. If your company is unable to meet the requirements described in the SOW or believes there are more suitable solutions available, please indicate this in your response below.

Response:

File details come from the government source that posted it. Updated .