About this file

This record drawing file contains instructions for revising engineering drawings related to a federal construction project. It outlines procedures for noting revisions to drawings through amendments, modifications, and change orders. Revisions are denoted through symbols and descriptions in the drawing title block and body. The file also provides an example drawing showing revisions.

The related federal contract opportunity is a pre-solicitation notice for a competitive 8(a) set-aside seeking a contractor to replace a transfer line and hydrant at Edwards Air Force Base in Kern County, California. The solicitation number is W9128F24R0053 and is open to all 8(a) firms. The contracting agency is the Department of the Army Corps of Engineers Omaha District. A response is required by the date specified in the solicitation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R E

C O

R D

D R

A W

IN

G

PROJECT/CONTRACT DESCRIPTION 2

PROJECT/CONTRACT LOCATION 1

XXXXXX-XX-X-XXXX

MMMMMMMMM YYYY

XXXXXX-XX-X-XXXX

FILE NUMBER:

FILE NAME:

ANSI D

J. SUBMITTER

SHEET TITLE 3

SHEET TITLE 2

SHEET TITLE 1

J. DRAWER

J. DESIGNER

J. CHECKER

10-18-2023 - REVISED TO SHOW AS-BUILT CONDITIONS

AM. #0002 GENERAL REVISIONS

AM. #0003 GENERAL REVISIONS

R-1

R-4

02-09-2023

02-17-2023

03-17-2023

05-12-2023

06-17-2023

09-20-2023

10-02-2023

REVISED IN ACCORDANCE WITH AM. #0004

MOD. #0001 - NEW DRAWING ADDED

MOD. #0004 - GENERAL REVISIONS

CHG. ORDER #0001 GENERAL REVISIONS

OMAHA DISTRICT

1616 CAPITOL AVE.

OMAHA, NE 68102

\nwofpcadd01\wrkcadd\oddg\OddgAmendMod-2023.dgn

NWO CAD MANAGER 01/27/2023 MICROSTATION

--- (DASH) REVISED TO SHOW AS-BUILT CONDITIONS

TO THE DRAWINGS AS IT BECOMES A CONTRACT SET)

DRAWING IS NOT RE-ISSUED - AND THE CHANGES ARE THEN LATER POSTED

REVISED IN ACCORDANCE WITH AM. #000X (THIS IS FOR DESCRIPTIVE CHANGES THAT WENT OUT IN THE AMENDMENT -

AM. #000X - NEW DRAWING ADDED (DRAWING THAT WAS NOT ORIGINALLY INCLUDED IN THE ADVERTISED SET)

AM. #000X - REVISED AND REDRAWN (MAJOR OVERHAUL OF THE DRAWING, TOO MANY CHANGES TO INDICATE INDIVIDUALLY)

AM. #000X - GENERAL REVISIONS (THIS WOULD BE FOR ANY RE-ISSUED DRAWINGS, TYPICAL CHANGES OR CORRECTIONS)

AM. #000X - REISSUED FOR CLARITY (DRAWING IS HARD TO READ - BLURRY)

AM. #000X - CHANGE ORDER (DESCRIPTION & REASON FOR CHANGE ARE THE SAME AS AMENDMENTS LISTED BELOW)

REVISION DESCRIPTIONS - FOR AMENDMENTS AND/OR MODIFICATIONS:

NOTE: DELTA NUMBER MATCHES AM. NUMBER

METHOD OF ADDING NEW DRAWING BY AMENDMENT.6.

REVISIONS BY AMENDMENT WHEN DRAWING IS TO BE RE-ISSUED.5.

THE ISSUE DATE.

IS ISSUED AND DRAWINGS ARE POSTED FROM WRITTEN DESCRIPTIONS AFTER

REVISIONS BY AMENDMENT WHEN WRITTEN "WORD DESCRIPTIVE" AMENDMENT4.

METHOD OF ADDING NEW DRAWING BY MODIFICATION.3.

REVISIONS BY MODIFICATION. (AFTER AWARD OF CONSTRUCTION CONTRACT).2.

LAST ENTRY IN DESCRIPTION BOX SHALL APPLY TO AS-BUILT CONDITIONS1.

DEFINITIONS OF REVISIONS:

SOLICITATION NO.:

DESIGNED BY:

DESCRIPTIONMARK

SIZE:

SUBMITTED BY:

DATE

CONTRACT NO.:CHECKED BY:

DRAWN BY:

ISSUE DATE:

S H

E E

T

ID

o f E n g in e e r s

U S

A rm y C o rp s

U.S. ARMY CORPS OF ENGINEERS

R

INSTRUCTIONS FOR NOTING REVISIONS:

DRAWINGS IN ITS PROPER PLACE ACCORDING TO THE SHEET NUMBER.

SUFFIX TO THE SHEET NO. THIS DRAWING SHOULD BE ADDED TO THE INDEX OF

NUMBERS AS DRAWING WITH SIMILAR SUBJECT MATTER AND ADD AN ALPHABETICAL

WHEN ADDING A NEW DRAWING TO SHOW SUPPLEMENTAL DATA, USE SAME DRAWING4.

IN THE BODY OF THE DRAWING.

ADD THE PROPER AMENDMENT OR MOD. SYMBOL NEAR EACH REVISED ITEM3.

ADD THE PROPER REVISION SYMBOL TO THE LEFT OF THE REVISION NOTATION.2.

AMENDMENT OR MODIFICATION DESCRIPTION AS APPLICABLE).

ADD THE REVISION DESCRIPTION (EITHER CHANGE ORDER,1.

2 X

R

ALSO USE THIS NEAR EACH REVISED ITEM IN THE BODY OF THE DRAWING.

INCH ENCIRCLED INSIDE OF TITLE BLOCK SHOWING THE LAST MOD NUMBER COMPLETED.

5. FOR MODIFICATION ONLY:

ADD A

SHEET 1 of 2

AM. #0001 NEW DRAWING ADDED1

PROJECT/CONTRACT DESCRIPTION 2

PROJECT/CONTRACT LOCATION 1

XXXXXX-XX-X-XXXX

MMMMMMMMM YYYY

XXXXXX-XX-X-XXXX

FILE NUMBER:

FILE NAME:

ANSI D

J. SUBMITTER

SHEET TITLE 3

SHEET TITLE 2

SHEET TITLE 1

J. DRAWER

J. DESIGNER

J. CHECKER

OMAHA DISTRICT

1616 CAPITOL AVE.

OMAHA, NE 68102

R E

C O

R D

D R

A W

IN

G

\nwofpcadd01\wrkcadd\oddg\OddgAmendMod-2023.dgn

FILE NUMBER:

FILE NAME:

10-18-2023 - REVISED TO SHOW AS-BUILT CONDITIONS

AM. #0002 GENERAL REVISIONS

AM. #0003 GENERAL REVISIONS

R-1

R-4

02-09-2023

02-17-2023

03-17-2023

05-12-2023

06-17-2023

09-20-2023

10-02-2023

REVISED IN ACCORDANCE WITH AM. #0004

MOD. #0001 - NEW DRAWING ADDED

MOD. #0004 - GENERAL REVISIONS

CHG. ORDER #0001 GENERAL REVISIONS

SHEET SEQUENCE NUMBER

w/ Level 2 Designator

DISCIPLINE DESIGNATOR

M - 2 0 1

SHEET TYPE DESIGNATOR

for Level 2 Designator)

(see A/E/C CADD STANDARD

DRAWING TITLE

TITLE BLOCK INFORMATION KEY

IF NEEDED

ADDITIONAL PROJECT INFORMATION

PLOTTING ADVERTISEMENT DRAWINGS

AND ADDED TO TITLE BLOCK AT THE TIME OF

THIS NUMBER IS ASSIGNED BY CONTRACTING

DO NOT EDIT

AUTO GENERATED INFORMATION

DESIGNER

FIRST INITIAL. LAST NAME OF CAD TECH OR

AMENDMENT/MOD EXAMPLE DRAWING FOR CLARIFICATION

SEE EXAMPLE ABOVE AND/OR

INDICATES REVISION TYPE AND DESCRIPTION:

DATE OF REVISION

SHEET IDENTIFICATION NUMBER:

IN THE SCOPE OF WORK

FOR A/E DESIGN PROJECTS THIS NUMBER IS FOUND

FILE NUMBER:

FOUND IN THE R.F.P.

FOR DESIGN BUILD PROJECTS THIS NUMBER IS

FILE NUMBER:

IN THE SCOPE OF WORK

THIS DESIGNATION IS FOUND

FOR A/E DESIGN PROJECTS

PROJECT CODE:

THIS DESIGNATION IS FOUND IN THE R.F.P.

FOR DESIGN BUILD PROJECTS

PROJECT CODE:

SHEET 2 of 2

SOLICITATION NO.:

DESIGNED BY:

DESCRIPTIONMARK

SIZE:

SUBMITTED BY:

DATE

CONTRACT NO.:CHECKED BY:

DRAWN BY:

ISSUE DATE:

S H

E E

T

ID

o f E n g in e e r s

U S

A rm y C o rp s

U.S. ARMY CORPS OF ENGINEERS

X

X

Y

Y

X

X

X

INFORMATION

A/E NAME AND LOCATION EXAMPLE DRAWING FOR CLARIFICATION

SEE EXAMPLE ABOVE AND/OR AMENDMENT/MOD

REVISION SYMBOL AND/OR NUMBER:

X

SOLICITATION NO.:

DESIGNED BY:

SIZE:

SUBMITTED BY:

CONTRACT NO.:CHECKED BY:

DRAWN BY:

ISSUE DATE:

FIRST INITIAL. LAST NAME OF DESIGNER

OF REVIEWER

FIRST INITIAL. LAST NAME

REVIEWER/DESCIPLINE SECTION CHIEF

FIRST INITIAL. LAST NAME OF

INFO. DO NOT EDIT

AUTO GENERATED

CONVENTION

THE CAD MANAGER. SEE A/E/C CADD STANDARDS FOR SHEET FILE NAMING

FILE NAMES SHOULD BEGIN WITH THE PROJECT CODE ASSIGNED BY

NAME OF CADD FILE:

PLOTTING CONTRACT AWARD DRAWINGS

AND ADDED TO TITLE BLOCK AT THE TIME OF

THIS NUMBER IS ASSIGNED BY CONTRACTING

AT THE BEGINNING OF THE PROJECT

COORDINATOR AND ADDED TO TITLE BLOCK

THIS NUMBER IS ASSIGNED BY PROJECT

DESCRIPTIONMARK DATE

AM. #0001 NEW DRAWING ADDED1

oddgAmendMod-2023 - 1 OF 2
oddgAmendMod-2023 - 2 OF 2

File details come from the government source that posted it. Updated .