005 - Production Report Form.pdf

PDF 174 KB Posted

Attached to
Removal and Disposal of Marine Attachments to Raw Water Intake
Solicitation number
N4008524R2666
Issued by

About this file

This document appears to be a Contractor Production Report form used to document daily construction activities on a federal contract. It includes sections to record work performed, contractor and subcontractor personnel, equipment used, safety incidents, and materials received. The related federal contract opportunity is for the removal and disposal of Zebra Mussels and marine deposits from a raw water intake structure to ensure unrestricted water flow to a Great Lakes water treatment plant. The solicitation number is N4008524R2666, and the contracting agency is the Department of the Navy Naval Facilities Engineering Command. The report form is used to provide detailed daily updates on the progress of the construction work required under this contract.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

To view the full contents of this document, you need a later version of the PDF viewer. You can upgrade to the latest version of Adobe Reader from www.adobe.com/products/acrobat/readstep2.html

For further support, go to www.adobe.com/support/products/acrreader.html

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

TITLE AND LOCATION

CONTRACT NO

REPORT NO

4296/2C (9/98)

CONTRACTOR

SUPERINTENDENT

MAX TEMP (F)

AM WEATHER

PM WEATHER

MIN TEMP (F)

WORK PERFORMED TODAY

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number of this work; one number per line.

WORK LOCATION AND DESCRIPTION

Work location and general description of work being done associated with this Schedule Activity No.

EMPLOYER

Contractor or Subcontractor name.

NUMBER

Number of employees doing this work.

TRADE

Construction trade doing this work.

HRS

Total hours spent this day doing this work.

WAS A JOB SAFETY MEETING HELD THIS DATE?

(If YES attach copy of the meeting minutes)

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

JOB

SAFETY

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed)

TOTAL WORK HOURS ON JOB

SITE.

THIS DATE, INCL CON'T SHEETS

CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS

REPORT

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed actions.)

Schedule Activity No Critical Path Method (CPM) Activity Number that pertains to the safety issue being discussed; one number per line.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED

Description of all Safety Actions Taken Today or Safety Inspections Held.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER) Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the equipment/material being received; one number per line.

Submittal # Submittal Number for equipment/material.

Description of Equipment/Material Received Description of Equipment Material Received, e.g., drywall.

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Construction Equipment that is on the job site today; one number per line.

Owner Owner of Equipment that is on the job site today.

Description of Construction Equipment Used Today (incl Make and Model) Description of construction equipment on the job site today (include Make and Model).

Hours Used Enter total number of hours this equipment was used on site today.

Schedule Activity No Critical Path Method (CPM) Schedule Activity Number that pertains to the Remarks; one number per line.

REMARKS

Use to document discussions, instructions provided.

DATE

CONTRACTOR/SUPERINTENDENT

8.0.1291.1.339988.308172

This is the date work was accomplished for this report; typically today's date.:
Shall be sequential to previous report.:
Use Contract Title and Location.:
Construction Contract Number and Task Order (TO) Number, if any.:
Prime Contractor's Name.:
Enter Superintendent's Name.:
High temperature during the work day.:
General description of morning (AM) weather conditions (sunny, cloudy, rain, etc.).:
General description of afternoon (PM) weather conditions (sunny, cloudy, rain, etc.).:
Low temperature during the work day.:
Button3:
Button4:
Use to document discussions, instructions provided.:
:
Total of all Hours Worked Today.:
Get this number from previous Production Report, Total Work Hours from "Start of Production" box.:
Add above totals.:
CheckBox1: 0
DateTimeField1:
SignatureField1:

File details come from the government source that posted it. Updated .