004 - Quality Control Report Form.pdf

PDF 229 KB Posted

Attached to
Removal and Disposal of Marine Attachments to Raw Water Intake
Solicitation number
N4008524R2666
Issued by

About this file

This document is a Contractor Quality Control Report form. It is used to document the preparatory, initial, and follow-up phases of construction work performed under a federal contract. The form requires the contractor to certify that the work complies with contract requirements and safety standards. It includes sections to report rework items, describe the work performed, and document the government's quality assurance review and any exceptions. This form would be used in conjunction with a federal construction contract, such as the one described in the related federal contract opportunity summary provided.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Facilities Engineering Command for the removal and disposal of Zebra Mussels and marine deposits from a raw water intake and associated timber crib structure. The contractor shall furnish all labor, tools, transportation, supervision, materials, inspections, equipment, and safety compliance necessary to ensure unrestricted water flow to a Great Lakes water treatment plant.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR QUALITY CONTROL REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

REPORT NO

PHASE CONTRACT NO CONTRACT TITLE

4296/2C (9/98)

WAS PREPARATORY PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL PREPARATORY PHASE CHECKLIST.

PREPARATORY NOYES

Schedule Activity No Definable Feature of Work (DFOW) Index #

WAS INITIAL PHASE WORK PREFORMED TODAY?

IF YES, FILL OUT AND ATTACH SUPPLEMENTAL INITIAL PHASE CHECKLIST.

INITIAL YES NO

Schedule Activity No Definable Feature of Work (DFOW) Index #

WORK COMPLIES WITH CONTRACT AS APPROVED DURING INITIAL PHASE?

WORK COMPLIES WITH SAFETY REQUIREMENTS AND INSPECTION COMPLIES WITH EM385-1-1?

FOLLOW-UP NOYES

YES NO

Schedule Activity No

Description of Work, Testing Performed & By Whom, Definable Feature of Work, Specification Section, Location and List of Personnel Present

REWORK ITEMS IDENTIFIED TODAY (NOT CORRECTED BY CLOSE OF BUSINESS) REWORK ITEMS CORRECTED TODAY (FROM REWORK ITEMS LIST)

Schedule Activity No Description Schedule

Activity No Description

REMARKS (Also Explain Any Follow-Up Phase checklist Item From Above That Was Answered "NO"; Work Deficiency, Safety Deficiency.) Manuf. Rep On-Site, etc.

Schedule Activity No Description

On behalf of the contractor, I certify that this report is complete and correct and equipment and material used and work performed during this reporting period is in compliance with the contract drawings and specifications to the best of my knowledge except as noted in this report. AUTHORIZED QC MANAGER AT SITE DATE

GOVERNMENT QUALITY ASSURANCE REPORT DATE

QUALITY ASSURANCE REPRESENTATIVE'S REMARKS AND/OR EXCEPTIONS TO THE REPORT: FOR GOVERNMENT USE ONLY.

Schedule Activity No Description

DATEGOVERNMENT QUALITY ASSURANCE MANAGER

form1[0]:
#pageSet[0]:
Page1[0]:
Cell[0]:
DateTimeField2[0]:
Cell[2]:
reportNumber[0]:
Cell[1]:
#subform[0]:
Cell[2]:
contractNumber[0]:
Cell[4]:
contractTitle[0]:
Subform1[0]:
Subform2[0]:
Button3[0]:
Button4[0]:

RadioButtonList[0]: Off

Table1[0]:
Row1[0]:
TextField[0]:
TextField[1]:
TextField[2]:
Subform1[1]:
Subform2[0]:
Button3[0]:
Button4[0]:

RadioButtonList[0]: Off

Table1[1]:
Row1[0]:
TextField[0]:
TextField[1]:
TextField[2]:
Subform1[2]:
Subform2[0]:
Button3[0]:
Button4[0]:
RadioButtonList[0]: Off
RadioButtonList[1]: Off
Table1[2]:
Row1[0]:
TextField[0]:
TextField[1]:
Subform1[3]:
Subform2[0]:
Button3[0]:
Button4[0]:
Table2[0]:
Row1[0]:
TextField[0]:
TextField[1]:
TextField[2]:
TextField[3]:
Subform1[4]:
Subform2[0]:
Button3[0]:
Button4[0]:
Table3[0]:
Row1[0]:
TextField[0]:
TextField[1]:
Subform1[5]:
DateTimeField1[0]:
Subform1[6]:
DateTimeField3[0]:
Subform1[7]:
Subform2[0]:
Button3[0]:
Button4[0]:
Table4[0]:
Row1[0]:
TextField[0]:
TextField[1]:
Subform1[8]:
DateTimeField1[0]:

File details come from the government source that posted it. Updated .