E Burnside & NE Couch Corridor Lighting Project - Bid Tabulation Summary

This is a bid tabulation document for the E Burnside & NE Couch Corridor Lighting project in Oregon, a roadway illumination improvement construction project. The project involves twelve line items spanning site preparation, traffic management, environmental controls, and electrical lighting infrastructure. Work items include mobilization, temporary traffic protection and direction, erosion control, inlet protection, pollution control planning, structure removal, tree preservation and pruning, pole foundations, lighting poles, pole arms, luminaires, and switching/conduit/wiring systems. The bid was opened on December 18, 2025, with project management by Stefan Bussey. All bidders submitted bid surety bonds and maintained valid Contractor Board licenses.

Five contractors submitted competitive bids for the project, with total bid amounts ranging from $393,650.00 to $1,016,500.00. Brown Contracting, Inc. submitted the lowest bid at $393,650.00 (License No. 90454), followed by Just Bucket Excavating Inc. at $643,250.00 (License No. 156838), Kodiak Pacific Construction Co. at $829,888.00 (License No. 114260), NorthStar Electrical Contractors at $874,699.00 (License No. 144945), and Global Electric Inc. at $1,016,500.00 (License No. 53583). The Engineers Estimate was $384,868.70, making the lowest bid slightly higher than the estimate at approximately 2.3 percent above the engineering projection.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid No: 00002651

Item Est. Spec No Description Quant Units Reference Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount Unit Price Total Amount 1 MOBILIZATION 1 LS 0210 $17,400.00 $17,400.00 $60,000.00 $60,000.00 $93,188.00 $93,188.00 $84,000.00 $84,000.00 $140,000.00 $140,000.00

TEMPORARY PROTECTION AND

DIRECTION OF TRAFFIC 1 LS 0221 $28,000.00 $28,000.00 $86,000.00 $86,000.00 $180,000.00 $180,000.00 $205,555.00 $205,555.00 $258,000.00 $258,000.00

3 EROSION CONTROL 1 LS 0280 $1,200.00 $1,200.00 $3,500.00 $3,500.00 $9,000.00 $9,000.00 $3,169.00 $3,169.00 $15,000.00 $15,000.00 4 INLET PROTECTION, TYPE 3 10 EACH 0280 $175.00 $1,750.00 $575.00 $5,750.00 $180.00 $1,800.00 $186.00 $1,860.00 $170.00 $1,700.00 5 POLLUTION CONTROL PLAN 1 LS 0290 $1,000.00 $1,000.00 $1,500.00 $1,500.00 $900.00 $900.00 $3,169.00 $3,169.00 $900.00 $900.00

REMOVAL OF STRUCTURES AND

OBSTRUCTIONS 1 LS 0310 $2,000.00 $2,000.00 $8,500.00 $8,500.00 $78,000.00 $78,000.00 $12,575.00 $12,575.00 $64,500.00 $64,500.00

7 TREE PRESERVATION AND PRUNING 1 LS 0325 $41,000.00 $41,000.00 $24,000.00 $24,000.00 $22,000.00 $22,000.00 $38,000.00 $38,000.00 $83,800.00 $83,800.00 8 POLE FOUNDATIONS 1 LS 0970 $32,500.00 $32,500.00 $32,000.00 $32,000.00 $38,000.00 $38,000.00 $65,900.00 $65,900.00 $62,700.00 $62,700.00 9 LIGHTING POLES 1 LS 0970 $66,000.00 $66,000.00 $88,000.00 $88,000.00 $109,000.00 $109,000.00 $125,308.00 $125,308.00 $105,900.00 $105,900.00

10 LIGHTING POLE ARMS 1 LS 0970 $6,800.00 $6,800.00 $12,000.00 $12,000.00 $12,000.00 $12,000.00 $11,431.00 $11,431.00 $9,700.00 $9,700.00 11 LUMINAIRES 1 LS 0970 $171,000.00 $171,000.00 $186,000.00 $186,000.00 $265,000.00 $265,000.00 $303,580.00 $303,580.00 $257,200.00 $257,200.00 12 SWITCHING, CONDUIT AND WIRING 1 LS 0970 $25,000.00 $25,000.00 $136,000.00 $136,000.00 $21,000.00 $21,000.00 $20,152.00 $20,152.00 $17,100.00 $17,100.00

Total $393,650.00 $643,250.00 $829,888.00 $874,699.00 $1,016,500.00

Bid Surety Yes BB Yes BB Yes BB Yes BB Yes BB

Contractor Board License No. 90454 156838 114260 144945 53583

Brown Contracting, Inc. Just Bucket Excavating Inc. Kodiak Pacific Construction Co

Project Name: E Burnside & NE Couch Corridor Lighting Date Bid Opened: December 18, 2025 Project Manager: Stefan Bussey Engineers Estimate: $384,868.70

NorthStar Electrical Contractors Global Electric Inc.