This is a Site As-Built Plans document for the Middle Mountain Communications Site located in Hood River County, Oregon (T1N, R10E, SEC 8, TL 100), prepared for informational purposes and associated with an ice canopies installation project. The project encompasses significant infrastructure upgrades including installation of one 140-foot three-legged self-supporting tower with a 26-foot by 26-foot buried foundation pad, two omnidirectional antennas (14.5 feet and 10.9 feet) mounted on the tower at specified heights with 20-foot separation, one 6-foot microwave dish at 86 feet above ground level, equipment racks for trunked radio station operations and microwave connections, and two 1,000-gallon propane tanks on a new concrete pad. Additional compound improvements include expansion of fence area at the southeast corner, installation of a 12-foot double-leaf access gate with new signage, installation of ice bridges to the tower and to propane regulator protection, conversion of propane tanks from liquid to vapor feed, and migration of nine Hood River County antennas and two ODOT/SRP antennas to the new tower. The project also requires removal of existing equipment including two 500-gallon propane tanks, existing battery piles, and hood covers, with installation of new generator air intake and exhaust snorkels and an 18-hole entry panel for coax connections.

The plans specify comprehensive grounding system installation and upgrades to conform to project specifications with a projected system ground resistance dependent on accurate data submission, proper installation, and three-point fall of potential testing. Site access requires a 3ZXY/1COM key, and the location is marked with multiple radio frequency hazard warnings indicating that RF fields at the site exceed FCC rules for human exposure, requiring compliance with posted safety guidelines. Emergency contact information is provided for the Oregon Department of Transportation Wireless Communications Section at (503) 986-2911. The document includes detailed construction notes, site information sheets, and specifications for concrete washouts, ice bridge layouts, antenna mount attachments, microwave attachments, propane tank foundations, anti-climb ladder protection, and grounding system components.

View the file

Other files

File Type Posted
00017940 Sample PI Contract.docx DOCX document
00017940 Exhibit 6 Plans.pdf PDF
00017940 Exhibit 5 Specifcations.docx DOCX document
00017940 Exhibit 8 Site Photos.pdf PDF
00017940 PI_ITB.docx DOCX document
00017940 Exhibit 7 Google Earth Location.pdf PDF
00017940 Addendum1.docx DOCX document
00017940 Preliminary Results.xlsx XLSX spreadsheet
00017940 Geotech_Report For Informational Purposes Only.pdf PDF
00017940 Intent To Award.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION MAP

SITE ACCESS REQUIREMENTS

1-800-424-5555

LOCATION CENTER

CALL TOLL FREE

UTILITIES UNDERGROUND

PROJECT DESCRIPTION

DRIVING DIRECTIONS

SHEET INDEX

DO NOT SCALE DRAWINGS

ATTENTION:

ACCESS TO COMPOUND AND SHELTER REQUIRE 3ZXY/1COM KEY.

SITE INFORMATION

MIDDLE MOUNTAIN #F71403

45.579287 N

-121.59722 W

DESIGN CRITERIA

ASITE DETAIL

T1N, R10E, SEC 8, TL 100

HOOD RIVER COUNTY, OREGON

CONSTRUCTION NOTES: Install one (1) 14.5' & one (1) 10.9' Omni antennas on the same Tower leg with 20'-0" separation between the center lines of antennas. Install M/W Dish. Install the antenna mounts, coax, connectors, and grounding for each antenna. Install two (2) equipment racks in shelter for the Trunked Radio Station. Install one (1) equipment rack in the shelter for the M/W connection. Install one

(1) (N) 140' 3-Leg SST. Items listed will correspond to drawing label as shown numerically.

Compound

1. Return disturbed areas to original condition, including removal of spoils and any additional fill, fabric or rock.

2. Install 12' double leaf access gate and install new signage on fence. See sheets C-8 & C-8A.

3. Expand fence area at SE corner of compound approx. 11'-10"x35'-0".

4. Install (N) 24"x21' ice bridge to (N) tower.

5. Install (N) 12'-0" x 12'-0" Concrete Pad with ice shield for (2) 1000 gallon Propane Tanks with

Bollards in (N) location.

6. Remove two (2) 500 Gallon Propane Tanks and Concrete Pad.

7. Install (N) 4'x12' Ice-shield to Protect Propane Regulators and Splitter.

Shelter/Communications Building

8. Install TRS racks in Bays 1 & 2. Install M/W radio rack in Bay 4, (by others).

9. Remove existing hood covers Acquire and Install (N) generator air intake and exhaust snorkels see detail sheet C-3.

10. Provide and Install (N) 18 hole entry panel, See entry port detail on sheet D-4 for coax port assignment.

11. Remove (E) Battery Pile and return to ODOT Salem. Install two (2) (N) 1560 AHR AT-23 battery piles (by others).

12. Re-use (E) battery charger, by others.

Tower

13. Install 6'Ø MW dish at 86' AGL on tower leg A to shoot to Augspurger Mountain. Install the antenna mount, coax, connectors and grounding for the antenna, to be performed by others.

14. Install one (1) 14.5' Omni antenna required for TRS at 133'-0" CL AGL & one (1) 10.9' Omni antenna required for TRS @ 113'-0" CL AGL on tower leg C. Install the antenna mounts, coax, connectors and grounding for each antenna, (by others).

15. Install (N) 140' 3-legged SST with 26'-0"x26'-0" buried foundation pad & pier. Relocate antennas as per sheet S-1. Migrate Hood River County Antennas per TLDS, (9 Antennas) to (N) Tower.

Migrate ODOT/SRP Antennas(2 Antennas) to (N) Tower.

Power

16. Convert LP tanks from liquid feed to vapor feed.

Provide and Install (N) Generator Feed Line and 2" Telemetry Conduit.

Grounding

17. As required, Install (N) or Upgrade (E) grounding, to conform to Plans (G sheets) and

Statement of Work, Section 9.

10 8

11 12

DTYP. CONCRETE WASH OUT

ATYPICAL CONSTRUCTION ENTRANCE

B BENCHING DETAIL - NOT USED C

EGRADING AND DRAINAGE CONTROL DETAIL - NOT USED

NOT USED B

NOT USED

CTYPICAL FENCE SECTION

ATYPICAL FENCE AND GATE ELEVATION

IN CASE OF AN EMERGENCY

CALL

Site Name:

Site #:

DICEBRIDGE LAYOUT DETAIL

ANOT USED

BICEBRIDGE-TOWER TRANSITION DETAIL

CSTOOP DETAIL - NOT USED

Beyond this point:

Radio frequency fields at this site may exceed

FCC rules for human exposure.

For your safety, obey all posted signs and site guidelines for working in radio frequency environments.

NO TRESPASSING

CAUTION

Beyond this point:

Radio frequency fields at this site exceed FCC rules for human exposure.

For your safety, obey all posted signs and site guidelines for working in radio frequency environments.

WARNING

FCC# XXXX

Radio Frequency Transmitters in use beyond this point

Obey all posted signs and information for working in radio frequency environments.

GUIDELINES FOR WORKING IN

RADIOFREQUENCY ENVIRONMENTS

INFORMATION

Contact the owner(s) of the antenna(s) before working closer then 3 feet from the antenna(s)

This is site#

Contact the management office if this door/hatch/gate is found unlocked.

FOR EMERGENCIES

CONTACT

OREGON DEPT. OF

TRANPORTATION

WIRELESS

COMMUNICATIONS SECTION

(503) 986-2911

SITE NAME:______________________________

SITE NUMBER:___________________________

EANTENNA MOUNT ATTACHMENT

FMICROWAVE ATTACHMENTDANTENNA ICE SHIELD DETAIL

G

H

BUNIVERSAL 23" RACKAUNIVERSAL 19" RACK CHARRIS 24.5" RACK

B CNOT USED DNOT USED ENOT USED

APROPANE TANK AND FOUNDATION ELEVATION

AANTI CLIMB PROTECTION FOR LADDERS BANTI CLIMB PROTECTION FOR LADDERS

APOLYPHASER FOR LIGHTNING SUPPRESSION

SECTION 1

C

BLPG EXHAUST FAN - NOT USED

E CGENERATOR EXHAUST - NOT USED

EXISTING COAX ENTRY PORT

ASSIGNMENT SECTION

NEW COAX ENTRY PORT

EXISTING COAX ENTRY PORT

NEW COAX ENTRY PORT

D

DYNAMIC VIEW OF ENGRAVED TAG C

ANTENNA/TOWER FEEDLINE

B

DYNAMIC VIEW OF FEEDLINE A

COAX PORT FEEDLINE

EFEEDLINE TAPE COLOR CHART

DISCLAIMER: "THE PROJECTED OHM VALUE OF THIS PROPOSED GROUNDING

SYSTEM IS DEPENDENT UPON THE ACCURACY OF THE DATA SUBMITTED TO

THE STATE RADIO PROJECT, THE GROUNDING INSTALLATION AS SHOWN

ON THIS DOCUMENT & THE ACCURACY OF THE 3-POINT FALL OF POTENTIAL TEST

PERFORMED AS PER MANUFACTURERS GUIDELINES".

"PROJECTED SYSTEM GROUND RESISTANCE: <5 OHMS BASED ON SOIL

RESISTIVITY TEST TAKEN WITHIN SITE COMPOUND BY OTHERS".

B

SOIL ENHANCEMENT DETAIL D

C

EQUIPMENT SHELTER FOUNDATION

GROUNDING SECTION

ON-SITE UTILITIES TRENCH E ON-SITE UTILITY CONDUIT CROSSING F

A

A

E

B D

F

H J K

C

Finished Grade

Bedrock

Min.

10'ft

Min.

6'ft

Max 20'ft or 2X

Length of Rod

Min.

10'ft

Min.

2'-6"

Min.

2'-6"

Min.

10'ft

D E F

CB

RF Surge

Suppressor

Shelter Wall

To Tower

Shelter Ground Ring

PVC conduit (Through

Wall at 45° Downward

Angle) Seal ends from the weather

Interior

Ground Buss Bar

Multiple #2

AWG or larger

Copper Conductors

RF Entry Port

Exterior

Ground Buss Bar

Exothermic Weld

PVC Conduit if copper straps are not used

Multiple copper straps are preferred (#2

AWG or larger conductors may be used)

RF Transmission

Line Ground Kit

FTWO HOLE LUG

STANDOFF INSULATORS

GROUND BAR WITH

E

CTYPICAL CONNECTIONS

AEXTERIOR GROUND BAR (EGB)

B

D TOWER GROUND (TGB) G

NATIONAL CODES & SPECIFICATIONS

x x x x x x x x x x x x x x x x

File details come from the government source that posted it. Updated .