About this file
This is a Statement of Work specification document for the Oregon Department of Transportation (ODOT) and Hood River County regarding the Middle Mountain Communications Site ice canopies installation project located near Dee, Oregon. The project scope encompasses installing ice canopies over two shelters, pouring concrete footings, grounding the ice canopies to an existing grounding ring, and disassembling and reassembling fencing. The contractor is responsible for supplying all required materials, tooling, test equipment, and transportation equipment necessary for project completion. Work is to commence upon issuance of the Notice to Proceed, with substantial completion targeted for August 15, 2027, and final completion by September 1, 2027.
The contractor must comply with all applicable fire restrictions and regulations, particularly during fire season (late April through October), which requires each work vehicle to be equipped with specific fire protection equipment including a round-pointed shovel, axe or Pulaski, and ABC fire extinguisher. Site access is restricted and controlled, requiring the presence of an ODOT Wireless Area Radio Specialist for entry authorization. Four-wheel drive vehicles may be required to access the site for both bidding and construction purposes. The contractor must coordinate with the local ODOT Wireless Area Radio Specialist to establish additional work requirements and controls based on fire restrictions in effect at the time of construction and must comply with all local, state, federal, and property owner fire regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017940 Exhibit 6 Plans.pdf | ||
| 00017940 Exhibit 8 Site Photos.pdf | ||
| 00017940 Site As Built Plans For Informational Purposes Only.pdf | ||
| 00017940 PI_ITB.docx | DOCX document | |
| 00017940 Sample PI Contract.docx | DOCX document | |
| 00017940 Exhibit 7 Google Earth Location.pdf | ||
| 00017940 Addendum1.docx | DOCX document | |
| 00017940 Preliminary Results.xlsx | XLSX spreadsheet | |
| 00017940 Geotech_Report For Informational Purposes Only.pdf | ||
| 00017940 Intent To Award.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT 5 – SPECIFICATIONS
Statement of Work
Site Name: Middle Mtn.
Site Location: Near Dee, OR – Latitude 45.57931 : Longitude -121.597183 Shelter Owner: Oregon Dept. of Transportation (ODOT) Land Owner: Hood River County
Summary of Work:
This proposal is for installing ice canopies over two shelters at the Middle Mtn. Communications Site. This includes pouring concrete footings, grounding the ice canopies to the existing grounding ring, and disassembly and assembly of fencing.
Work Start Date:
Upon issuance of Notice To Proceed. Desired start date is as soon as possible after issuance of ODOT’s Notice To Proceed and to be agreed upon by contractor and ODOT.
Work Completion Date:
| SUBSTANTIAL COMPLETION: | 08/15/2027 |
| FINAL COMPLETION: | 09/01/2027 |
Desired completion date is as soon as possible and to be agreed upon by contractor and ODOT.
Site-Specific Work:
· Installation of ice canopies per stamped construction drawings (Exhibit 6 Plans).
· Installation of concrete footings per stamped construction drawings.
· Attach ice canopies to existing grounding ring.
· Disassemble and Assemble Fencing.
Materials and Transportation:
· Contractor shall supply any required materials, tooling, test equipment, and transportation equipment necessary to complete this project.
Seasonal Restrictions and Site Access:
Contractor shall work with the local ODOT Wireless Area Radio Specialist to determine and establish additional Work requirements and controls that are a result of the fire restrictions in place at the time of construction. Contractor shall comply with all fire restrictions. The ODOT Wireless Area Radio Specialist for this project will be provided upon contract execution.
During fire season (typically late April through October) in forest areas the following minimum fire protection conditions must be followed:
· Each truck must have:
· 1 round pointed shovel at least 8 inches wide, with a handle at least 26 inches long
· 1 axe or Pulaski with 26 inch handle or longer
· 1 fire extinguisher rated not less than 2 ½ pound ABC (OR-OSHA requires a 5 lb. extinguisher for all commercial work)
· Adequate muffler and exhaust system to prevent sparks
· No Smoking is allowed while working or traveling in the operation area
· Full commercial Fire Equipment Requirements can be obtained on the ODF website.
· Contractor shall comply with all local, state, federal, and property owner fire regulations.
The following conditions apply to site access, work, and usage. Four-wheel drive vehicles may be required to access the site for bidding and construction purposes.
· All communications sites are considered to be controlled access sites and require the presence of an ODOT Wireless Area Radio Specialist to be granted site access.
Exhibits:
· Exhibit 5 – Specifications
· Exhibit 6 – Plans
· Exhibit 7 – Google Earth Location
· Exhibit 8 – Site Photos
File details come from the government source that posted it. Updated .