00014835 Questions and Answers 09_22_2025.docx

DOCX document 20 KB Posted

Attached to
ER OR138E-MP 49. 1 Emergency Landslide Repair REBID
Solicitation number
S-73000-00014835
Issued by
Douglas County, Oregon

About this file

This document is a Questions and Answers file for the Oregon Department of Transportation's (ODOT) Emergency Landslide Repair project on Highway 138E at Milepost 49.1 in Douglas County. The file addresses specific contractor inquiries about the project, including work scope confirmation for the D-Line section, concrete barrier quantities (1,300 linear feet), stockpile locations, and availability of cross-section data. The document notes that surfaces, cross-section, and 3D electronic data will be provided to the successful bidder, and explicitly states that this document does not constitute an addendum to the Invitation to Bid (ITB).

The project is federally eligible for reimbursement through the FHWA Emergency Relief Program, requiring compliance with state and federal regulations. Bidders must submit electronic proposals through OregonBuys by September 25, 2025, with a bid security of 10% of the total bid amount. The project has a Substantial Completion date of 11/14/2025 and a Final Completion date of 11/21/2025. Key requirements include adhering to 2024 Oregon Standard Specifications for Construction, complying with prevailing wage rates from BOLI and U.S. Department of Labor, and meeting domestic preference requirements for steel, iron, and manufactured products. Contractors must also comply with federal contract provisions, including non-discrimination standards and labor regulations.

View the file

Other files

File Type Posted
00014835 Invitation to Bid REBID.docx DOCX document
Attachment B Plans~10.pdf PDF
ATT E FHWA Form 1273~3.pdf PDF
ATT C Bid Pricing Form~16.xlsx XLSX spreadsheet
00014835 Bid Results.xlsx XLSX spreadsheet
NOTICE OF INTENT TO ADVERTISE_Caterpillar Inc_040924-CAT.pdf PDF
Attachment A Special Provisions and Specifications~9.pdf PDF
ATT D Project Wage Rates~6.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ER OR 138E-MP49.1 Emergency Landslide Repair 09/22/2205 Questions and Answers (in Red):

1. D-Line - the only work being performed on D-Line is from 2+20 to 3+30? Nothing needs to be done from 0+00 to 2+20 correct? Yes

1. The plans show 650 LF of concrete barrier. The bid schedule shows 1300 LF. Just wanted to make sure this was correct. Yes, the bid schedule quantity is correct.

1. I'm assuming it will be acceptable to stockpile in the turnout just North of the project? Yes.

1. Are there any cross sections available? The typical section on BA01 makes it seem the slope benching is not very far down the slope. But the Sediment Barrier & Compost Blanket Limits make it seem like it carries much farther down the slope. Surfaces, cross-section and other 3D electronic data will be made available to the successful bidder.

End of Questions and Answers.