00014835 Bid Results.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
ER OR138E-MP 49. 1 Emergency Landslide Repair REBID
Solicitation number
S-73000-00014835
Issued by
Douglas County, Oregon

About this file

This document is a bid tabulation sheet for Invitation to Bid (ITB) No. S-73000-00014835, issued by the Oregon Department of Transportation (ODOT) for an emergency landslide repair project on Highway 138E at Milepost 49.1 in Douglas County. The project involves comprehensive roadway and infrastructure repair, with bid submissions received from four contractors: LTM Incorporated, JRT Construction LLC, Moore Excavation Inc., and LaDuke Construction, LLC. The bid closing date was September 25, 2025, at 2:00 PM, with a substantial completion date of November 14, 2025, and a final completion date of November 21, 2025. The scope of work includes temporary traffic protection, erosion control, striping, barricades, portable traffic signals, structure removal, clearing, channel construction, culvert installation, paving, and permanent seeding.

The bid tabulation reveals significant price variation among contractors, with total bid prices ranging from $796,323.98 (LTM Incorporated) to $1,083,233.30 (LaDuke Construction). The project is eligible for Federal Highway Administration (FHWA) Emergency Relief Program reimbursement, subject to both state and federal requirements. Key technical components include stone embankment (3,260 tons), general excavation (2,100 cubic yards), and asphalt pavement work, with detailed unit pricing for 48 distinct line items. Contractors must comply with prevailing wage rates, domestic preference requirements for materials, and adhere to 2024 Oregon Standard Specifications for Construction, indicating a complex infrastructure rehabilitation project with strict regulatory compliance mandates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date Issued:9/25/25
ITB No.S-73000-00014835BIDDER
NAME:LTM, Incorporated dba Knife River MaterialsJRT CONSTRUCTION LLCMoore Excavation Inc.LaDuke Construction, LLC
Bid Closing:9/25/2025 at 2:00 PMCITY/STATE:Roseburg, OROakland, ORFairview, ORCentral Point, OR
Description:ER OR138E-MP 49.1 Emergency Landslide Repair REBIDCCB#5660320516128397193168
This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration.
Bid Item #DescriptionEst
QTYUNITUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL
PRICEUNIT
PRICETOTAL

PRICE

1MOBILIZATION1LS$69,265.00$69,265.00$94,000.00$94,000.00$95,000.00$95,000.00$120,000.00$120,000.00
2TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC1LS$19,500.00$19,500.00$20,000.00$20,000.00$115,000.00$115,000.00$24,000.00$24,000.00
3TEMPORARY SIGNS250SQFT$30.00$7,500.00$40.00$10,000.00$38.00$9,500.00$38.00$9,500.00
4FLAGGERS150HOUR$88.00$13,200.00$74.00$11,100.00$90.00$13,500.00$79.00$11,850.00
5TEMPORARY BARRICADES, TYPE III2EACH$200.00$400.00$175.00$350.00$250.00$500.00$180.00$360.00
6TEMPORARY PLASTIC DRUMS12EACH$50.00$600.00$50.00$600.00$75.00$900.00$80.00$960.00
7TEMPORARY STRIPING2600FOOT$0.65$1,690.00$0.60$1,560.00$1.30$3,380.00$2.00$5,200.00
8TEMPORARY PAVEMENT BARS48SQFT$8.50$408.00$8.50$408.00$8.50$408.00$14.00$672.00
9STRIPE REMOVAL1290FOOT$1.20$1,548.00$1.15$1,483.50$1.85$2,386.50$3.00$3,870.00
10BAR REMOVAL48SQFT$9.00$432.00$8.50$408.00$8.50$408.00$12.00$576.00
11TEMPARARY BARRIER1300FOOT$35.00$45,500.00$30.00$39,000.00$24.00$31,200.00$36.00$46,800.00
12TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM2EACH$4000.00$8,000.00$4,000.00$8,000.00$3,450.00$6,900.00$3,900.00$7,800.00
13MOVING TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM2EACH$700.00$1,400.00$700.00$1,400.00$1,750.00$3,500.00$100.00$200.00
14REFLECTIVE BARRIER PANELS115EACH$41.00$4,715.00$40.00$4,600.00$35.00$4,025.00$20.00$2,300.00
15REPAIR TEMPORARY IMPACT ATTENUATOR, NARROW SITE SYSTEM4EACH$1,250.00$5,000.00$1,250.00$5,000.00$1,250.00$5,000.00$150.00$600.00
16PORTABLE TRAFFIC SIGNAL1EACH$19,500.00$19,500.00$20,000.00$20,000.00$25,000.00$25,000.00$24,000.00$24,000.00
17CONSTRUCT AND REMOVE TEMPORARY ROADBED AND SURFACING1LS$3,000.00$3,000.00$1,500.00$1,500.00$1,000.00$1,000.00$38,000.00$38,000.00
18EROSION CONTROL1LS$2,500.00$2,500.00$5,000.00$5,000.00$15,000.00$15,000.00$5,400.00$5,400.00
19PLASTIC SHEETING500SQYD$0.70$350.00$5.00$2,500.00$2.80$1,400.00$2.40$1,200.00
20MATTING, TYPE D1600SQYD$8.50$13,600.00$8.50$13,600.00$8.50$13,600.00$8.50$13,600.00
21COMPOST EROSION BLANKET1600SQYD$7.00$11,200.00$7.00$11,200.00$7.00$11,200.00$16.00$25,600.00
22CHECK DAM, TYPE 12EACH$250.00$500.00$300.00$600.00$200.00$400.00$160.00$320.00
23SEDIMENT BARRIER, TYPE 8650FOOT$8.00$5,200.00$8.00$5,200.00$8.50$5,525.00$6.00$3,900.00
24STRAW BALE30EACH$18.00$540.00$60.00$1,800.00$45.00$1,350.00$24.00$720.00
25POLLUTION CONTROL PLAN1LS$500.00$500.00$500.00$500.00$2,500.00$2,500.00$1,200.00$1,200.00
26CONSTRUCTION SURVEY WORK1LS$8,000.00$8,000.00$10,000.00$10,000.00$15,000.00$15,000.00$36,000.00$36,000.00
27REMOVAL OF STRUCTURES AND OBSTRUCTIONS1LS$500.00$500.00$20,000.00$20,000.00$30,000.00$30,000.00$10,000.00$10,000.00
28ASPHALT PAVEMENT SAW CUTTING (8 INCHES)80FOOT$20.00$1,600.00$15.00$1,200.00$25.00$2,000.00$24.00$1,920.00
29CLEARING AND GRUBBING1LS$19,500.00$19,500.00$35,000.00$35,000.00$40,000.00$40,000.00$19,000.00$19,000.00
30DITCH EXCAVATION75CUYD$80.00$6,000.00$80.00$6,000.00$65.00$4,875.00$38.00$2,850.00
31GENERAL EXCAVATION2100CUYD$33.00$69,300.00$35.00$73,500.00$60.00$126,000.00$29.50$61,950.00
32STONE EMBANKMENT3260TON$46.00$149,960.00$65.00$211,900.00$40.00$130,400.00$78.00$254,280.00
3318" SUBGRADE STABILIZATION50SQYD$85.00$4,250.00$50.00$2,500.00$70.00$3,500.00$48.00$2,400.00
34PVC LINER225SQYD$25.00$5,625.00$17.00$3,825.00$11.00$2,475.00$13.00$2,925.00
35RIPRAP GEOTEXTILE, TYPE 2225SQYD$7.00$1,575.00$6.00$1,350.00$5.00$1,125.00$4.50$1,012.50
36SUBGRADE REINFORCEMENT GEORID7250SQYD$7.00$50,750.00$3.00$21,750.00$2.00$14,500.00$6.00$43,500.00
37FILTER BLANKET225SQYD$30.00$6,750.00$25.00$5,625.00$20.00$4,500.00$60.00$13,500.00
38LOOSE RIPRAP, CLASS 200150CUYD$110.00$16,500.00$150.00$22,500.00$135.00$20,250.00$160.00$24,000.00
3918 INCH CULVERT PIPE, 5FT DEPTH4FOOT$225.00$900.00$350.00$1,400.00$450.00$1,800.00$120.00$480.00
40SLOPED END SECTIONS, 18 INCH1EACH$550.00$550.00$250.00$250.00$1,500.00$1,500.00$300.00$300.00
41CONCRETE CLOSURE COLLARS1EACH$1,000.00$1,000.00$1,500.00$1,500.00$3,500.00$3,500.00$1,980.00$1,980.00
42PAVED CULVERT END SLOPES98SQFT$0.01$0.98$35.00$3,430.00$55.00$5,390.00$58.60$5,742.80
43AGGREGATE BASE AND SHOULDERS1150TON$56.00$64,400.00$55.00$63,250.00$52.00$59,800.00$42.90$49,335.00
44LEVEL 3, 1/2 INCH ACP MIXTURE (64-22ER oil)550TON$160.00$88,000.00$245.00$134,750.00$190.00$104,500.00$225.00$123,750.00
45DELINEATORES, TYPE 18EACH$125.00$1,000.00$125.00$1,000.00$275.00$2,200.00$110.00$880.00
46THERMOPLASTIC, SPRAYED, SURFACE, NON-PROFILED2500FOOT$3.75$9,375.00$3.75$9,375.00$4.50$11,250.00$6.00$15,000.00
47PERMANANENT SEEDING0.4ACRE$5,600.00$2,240.00$5,600.00$2,240.00$6,000.00$2,400.00$22,000.00$8,800.00
48TOPSOIL500CUYD$105.00$52,500.00$105.00$52,500.00$75.00$37,500.00$110.00$55,000.00
TOTAL$ 796,323.98$ 944,654.50$ 993,047.50$ 1,083,233.30