00014726 Bid Results.xlsx
XLSX spreadsheet 27 KB Posted
- Solicitation number
- S-73000-00014726
- Issued by
- Crook County, Oregon
About this file
The document is a bid tabulation sheet for Invitation to Bid (ITB) No. S-73000-00014726 issued by the Oregon Department of Transportation (ODOT) for an emergency repair project on US101 between mile posts 314.7 and 344.5. The project involves roadway reconstruction with four bidders submitting proposals: Tidewater Contractors, Inc., LTM Incorporated, LaDuke Construction, LLC, and Granite Construction Company. The bid was scheduled to close on September 8, 2025, at 11:00 AM, with the project involving comprehensive infrastructure repairs including mobilization, traffic management, erosion control, excavation, stone embankment, storm sewer pipe installation, guardrail replacement, and asphalt concrete pavement work.
The bid tabulation reveals significant price variations among contractors, with total bid prices ranging from $1,753,948.00 to $3,604,492.50. The lowest bidder, Tidewater Contractors, Inc., submitted unit prices that were consistently lower than competitors across most line items, particularly in areas like contaminated soil disposal, erosion control, and construction survey work. The project appears to be federally funded, potentially through the Federal Highway Administration Emergency Relief Program, and requires compliance with various regulatory standards including Buy America provisions, prevailing wage requirements, and potential diversity and inclusion considerations. The project scope indicates a complex infrastructure rehabilitation effort with multiple technical and environmental components.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATT B PLANS R1.pdf | ||
| ATT C Bid Pricing Form~15.xlsx | XLSX spreadsheet | |
| 00014726 Questions and Answers 082625.docx | DOCX document | |
| ATT C Bid Pricing Form Revised~4.xlsx | XLSX spreadsheet | |
| ATT I FHWA Form 1273~3.pdf | ||
| ATT C Bid Pricing Form_R3.xlsx | XLSX spreadsheet | |
| 00014726 Invitation to Bid.docx | DOCX document | |
| Attachment A Special Provisions and Specifications~8.pdf | ||
| 00014726 Addendum 2~1.docx | DOCX document | |
| CSR 270-25 Sole Source Determination_8-20-2025_Redacted.pdf | ||
| ATT A SPECIAL PROVISIONS AND SPECIFICATIONS R1.pdf | ||
| Attachment B Plans~7.pdf | ||
| ATT I FHWA Form 1273~2.pdf | ||
| ATT G Project Wage Rates~1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date Issued: | 9/8/25 | |||||||
| ITB No. | S-73000-00014726 | BIDDER | ||||||
| NAME: | Tidewater Contractors, Inc. | LTM, Incorporated dba Knife River Materials | LaDuke Construction, LLC | Granite Construction Company | ||||
| Bid Closing: | 9/8/2025 at 11:00 AM | CITY/STATE: | Brookings, OR | Coos Bay, OR | Central Point, OR | Vancouver, WA | ||
| Description: | ER US101: MP314.7 and MP344.5 Emergency Repair Project REBID | CCB# | 29995 | 56603 | 193168 | 101195 | ||
| This bid tabulation is not an indicator of award. It is only a tabulation of the bids submitted for consideration. |
| Bid Item # | Description | Est | |
| QTY | UNIT | UNIT | |
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL | ||
| PRICE | UNIT | ||
| PRICE | TOTAL |
PRICE
| 1 | Mobilization | 1 | LS | $175,000.00 | $175,000.00 | $99,879.00 | $99,879.00 | $400,000.00 | $400,000.00 | $ 350,000.00 | $350,000.00 |
| 2 | Temporary Protection & Direction of Traffic | 1 | LS | $65,000.00 | $65,000.00 | $207,000.00 | $207,000.00 | $45,000.00 | $45,000.00 | $ 155,000.00 | $155,000.00 |
| 3 | Temporary Signs | 325 | SQFT | $35.00 | $11,375.00 | $30.00 | $9,750.00 | $42.00 | $13,650.00 | $ 12.50 | $4,062.50 |
| 4 | Portable Changeable Message Signs | 2 | EA | $6,000.00 | $12,000.00 | $1,500.00 | $3,000.00 | $9,000.00 | $18,000.00 | $ 2,500.00 | $5,000.00 |
| 5 | Flagger | 2020 | HR | $88.00 | $177,760.00 | $88.50 | $178,770.00 | $83.00 | $167,660.00 | $ 100.00 | $202,000.00 |
| 6 | Flagger Station Lighting | 2 | EA | $5,000.00 | $10,000.00 | $1,600.00 | $3,200.00 | $5,500.00 | $11,000.00 | $ 1,500.00 | $3,000.00 |
| 7 | Pilot Cars | 1000 | HR | $97.00 | $97,000.00 | $100.50 | $100,500.00 | $125.00 | $125,000.00 | $ 100.00 | $100,000.00 |
| 8 | Automated Flagger Assistance Device | 2 | EA | $4,000.00 | $8,000.00 | $2500.00 | $5,000.00 | $9,000.00 | $18,000.00 | $ 5,000.00 | $10,000.00 |
| 9 | Temporary Barricades, Type II | 4 | EA | $75.00 | $300.00 | $125.00 | $500.00 | $125.00 | $500.00 | $ 40.00 | $160.00 |
| 10 | Temporary Barricades, Type III | 2 | EA | $200.00 | $400.00 | $150.00 | $300.00 | $210.00 | $420.00 | $ 200.00 | $400.00 |
| 11 | Temporary Plastic Drums | 157 | EA | $40.00 | $6,280.00 | $100.00 | $15,700.00 | $130.00 | $20,410.00 | $ 20.00 | $3,140.00 |
| 12 | Temporary Pavement Bars | 24 | SQFT | $12.00 | $288.00 | $35.00 | $840.00 | $24.00 | $576.00 | $ 75.00 | $1,800.00 |
| 13 | Erosion Control | 1 | LS | $500.00 | $500.00 | $100.00 | $100.00 | $14,000.00 | $14,000.00 | $ 39,000.00 | $39,000.00 |
| 14 | Plastic Sheeting | 500 | SQYD | $2.00 | $1,000.00 | $2.00 | $1,000.00 | $8.00 | $4,000.00 | $ 6.00 | $3,000.00 |
| 15 | Check Dam, Type 1 | 7 | EA | $250.00 | $1,750.00 | $750.00 | $5,250.00 | $185.00 | $1,295.00 | $ 350.00 | $2,450.00 |
| 16 | Inlet Protection, Type 3 | 2 | EA | $50.00 | $100.00 | $50.00 | $100.00 | $240.00 | $480.00 | $ 250.00 | $500.00 |
| 17 | Inlet Protection, Type 4 | 2 | EA | $200.00 | $400.00 | $80.00 | $160.00 | $240.00 | $480.00 | $ 250.00 | $500.00 |
| 18 | Straw Bale | 30 | EA | $35.00 | $1,050.00 | $31.00 | $930.00 | $21.00 | $630.00 | $ 125.00 | $3,750.00 |
| 19 | Pollution Control Plan | 1 | LS | $100.00 | $100.00 | $100.00 | $100.00 | $1,200.00 | $1,200.00 | $ 2,000.00 | $2,000.00 |
| 20 | Contaminated Soil Disposal | 455 | TONS | $1.00 | $455.00 | $1.00 | $455.00 | $280.00 | $127,400.00 | $ 300.00 | $136,500.00 |
| 21 | Lead Compliance Plan | 1 | LS | $2,000.00 | $2,000.00 | $100.00 | $100.00 | $8,000.00 | $8,000.00 | $ 5,000.00 | $5,000.00 |
| 22 | Segregate and Stockpile Contaminated Soil | 1 | LS | $10,000.00 | $10,000.00 | $100.00 | $100.00 | $60,000.00 | $60,000.00 | $ 25,000.00 | $25,000.00 |
| 23 | Soil Sample Collection and Analytical Testing | 4 | EA | $400.00 | $1,600.00 | $1.00 | $4.00 | $2,000.00 | $8,000.00 | $ 700.00 | $2,800.00 |
| 24 | Remove Asbestos Material, Non-Friable | 20 | FT | $450.00 | $9,000.00 | $112.00 | $2,240.00 | $200.00 | $4,000.00 | $ 125.00 | $2,500.00 |
| 25 | Construction Survey Work | 1 | LS | $25,000.00 | $25,000.00 | $20000.00 | $20,000.00 | $65,000.00 | $65,000.00 | $ 10,000.00 | $10,000.00 |
| 26 | Removal of Structures and Obstructions | 1 | LS | $12,000.00 | $12,000.00 | $20,000.00 | $20,000.00 | $60,000.00 | $60,000.00 | $ 17,000.00 | $17,000.00 |
| 27 | Clearing and Grubbing | 1 | LS | $10,000.00 | $10,000.00 | $1,500.00 | $1,500.00 | $190,000.00 | $190,000.00 | $ 10,000.00 | $10,000.00 |
| 28 | General Excavation | 6700 | CUYD | $32.50 | $217,750.00 | $42.00 | $281,400.00 | $32.00 | $214,400.00 | $ 75.00 | $502,500.00 |
| 29 | Stone Embankment | 7300 | TONS | $38.00 | $277,400.00 | $55.00 | $401,500.00 | $148.00 | $1,080,400.00 | $ 140.00 | $1,022,000.00 |
| 30 | 24 Inch Subgrade Stabilization | 150 | SQYD | $70.00 | $10,500.00 | $125.00 | $18,750.00 | $38.00 | $5,700.00 | $ 165.00 | $24,750.00 |
| 31 | Subgrade Geotextile | 9500 | SQYD | $1.20 | $11,400.00 | $1.50 | $14,250.00 | $3.00 | $28,500.00 | $ 3.00 | $28,500.00 |
| 32 | Riprap Basins | 1 | EA | $5,000.00 | $5,000.00 | $4,000.00 | $4,000.00 | $1,400.00 | $1,400.00 | $ 8,000.00 | $8,000.00 |
| 33 | 24 Inch Storm Sewer Pipe, 10 ft Depth | 76 | FT | $440.00 | $33,440.00 | $860.00 | $65,360.00 | $280.00 | $21,280.00 | $ 400.00 | $30,400.00 |
| 34 | 24 Inch Storm Sewer Pipe, 20 ft Depth | 126 | FT | $545.00 | $68,670.00 | $1,000.00 | $126,000.00 | $410.00 | $51,660.00 | $ 450.00 | $56,700.00 |
| 35 | Concrete Inlets, Type G-2MA | 2 | EA | $6,100.00 | $12,200.00 | $8,500.00 | $17,000.00 | $3,800.00 | $7,600.00 | $ 16,000.00 | $32,000.00 |
| 36 | Adjusting Catch Basins | 1 | EA | $750.00 | $750.00 | $3400.00 | $3,400.00 | $1,400.00 | $1,400.00 | $ 2,000.00 | $2,000.00 |
| 37 | Filling Abandon Structure | 2 | EA | $3,000.00 | $6,000.00 | $7500.00 | $15,000.00 | $6,000.00 | $12,000.00 | $ 1,500.00 | $3,000.00 |
| 38 | Aggregate Base and Shoulders | 2400 | TONS | $44.00 | $105,600.00 | $103.00 | $247,200.00 | $38.00 | $91,200.00 | $ 125.00 | $300,000.00 |
| 39 | Level 3, 1/2 Inch ACP Mixture (64-22 oil) | 2400 | TONS | $130.00 | $312,000.00 | $172.00 | $412,800.00 | $203.00 | $487,200.00 | $ 185.00 | $444,000.00 |
| 40 | Guardrail, Type 2A | 875 | FT | $26.00 | $22,750.00 | $25.00 | $21,875.00 | $65.00 | $56,875.00 | $ 40.00 | $35,000.00 |
| 41 | Guardrail Terminals, Flared | 3 | EA | $6,000.00 | $18,000.00 | $5,200.00 | $15,600.00 | $4,000.00 | $12,000.00 | $ 4,000.00 | $12,000.00 |
| 42 | Delineators, Type 1 | 10 | EA | $105.00 | $1,050.00 | $100.00 | $1,000.00 | $40.00 | $400.00 | $ 10.00 | $100.00 |
| 43 | Bi-Directional Yellow Type IAR Markers | 26 | EA | $30.00 | $780.00 | $25.00 | $650.00 | $24.00 | $624.00 | $ 30.00 | $780.00 |
| 44 | Thermoplastic, Sprayed, Surface, Non-Profiled | 4100 | FT | $3.00 | $12,300.00 | $2.70 | $11,070.00 | $6.00 | $24,600.00 | $ 2.00 | $8,200.00 |
| TOTAL | $ 1,753,948.00 | $ 2,333,333.00 | $ 3,461,940.00 | $ 3,604,492.50 |
File details come from the government source that posted it. Updated .