00014444 EvaluationScoreMatrix for release.xlsx
XLSX spreadsheet 72 KB Posted
- Attached to
- K22706 - OR6 at Wilson River Loop CA/CEI
- Solicitation number
- S-73000-00014444
- Issued by
- Tillamook County, Oregon
About this file
The file is an Evaluation Score Matrix for a procurement process involving two primary firms: Consor North America and David Evans and Associates. The document details a comprehensive scoring evaluation for a proposal with five key assessment areas: Specific Experience of Key Staff, Cost Effectiveness, Project Management, Project Samples, and Clarity of Proposal and Conformity with Requirements. Each firm was evaluated by three separate evaluators, with maximum possible points of 100 per proposal. David Evans and Associates achieved the highest overall score of 88.33, ranking first, while Consor North America scored 86.33 and ranked second.
The scoring methodology demonstrates a rigorous, multi-faceted approach to vendor selection, with evaluators scoring across different performance dimensions. The evaluation considered technical competence, cost efficiency, management capabilities, and proposal quality. While the specific project details are not fully elaborated in this document, the scoring matrix suggests a structured, point-based selection process designed to comprehensively assess vendor capabilities and proposal strengths through a standardized, quantitative evaluation framework.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00014444 Final.docx | DOCX document | |
| Mini RFP Att A Cover Sheet~1.doc | DOC document | |
| Mini RFP Att B References.doc | DOC document | |
| 00014444 ITA.docx | DOCX document | |
| OregonBuys Registration Guide~19.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary Scores
| RFP Number: Project Name: ____________________ | |
| EVALUATION SCORE SUMMARY | |
| Enter data only in gray highlighted fields on Summary, Proposal, Interview and Reference Score worksheets as applicable. |
| SOP Evaluation Summary Scores | Number of Proposal evaluators: | 3 | |||||||||||
| Evaluation Team | |||||||||||||
| Score | |||||||||||||
| Firm | evaluator 1 | evaluator 2 | evaluator 3 | evaluator 4 | evaluator 5 | Total | Average | Rank | |||||
| Consor North America | 98 | 1 | 73 | 2 | 88 | 1 | 0 | 1 | 0 | 1 | 259 | 86 | 2 |
| David Evans and Associates | 95 | 2 | 84 | 1 | 86 | 2 | 0 | 1 | 0 | 1 | 265 | 88 | 1 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Firm Name | 0 | 3 | 0 | 3 | 0 | 3 | 0 | 1 | 0 | 1 | 0 | 0 | 3 |
| Statistics | |||||||||
| High Score | 98 | 84 | 88 | 0 | 0 | ||||
| Low Score | 95 | 1 | 73 | 1 | 86 | 1 | ERROR:#NUM! | 1 | ERROR:#NUM! |
| Range | 3 | 11 | 2 | ERROR:#NUM! | ERROR:#NUM! |
| Interview Evaluation Summary Scores | Number of interview evaluators: | 1 | |||||||||||
| Evaluation Team | |||||||||||||
| Score | |||||||||||||
| Firm | name1 | name2 | name3 | name4 | name5 | Total | Average | Rank | |||||
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Statistics | |||||||||
| High Score | 0 | 0 | 0 | 0 | 0 | ||||
| Low Score | ERROR:#NUM! | 1 | ERROR:#NUM! | 1 | ERROR:#NUM! | 1 | ERROR:#NUM! | 1 | ERROR:#NUM! |
| Range | ERROR:#NUM! | ERROR:#NUM! | ERROR:#NUM! | ERROR:#NUM! | ERROR:#NUM! |
| References Summary Scores | Number of references scored: | 1 | |||||||||||
| References | |||||||||||||
| Score | |||||||||||||
| Firm | reference1 | reference2 | reference3 | reference4 | reference5 | Total | Average | Rank | |||||
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
| Firm Name | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 1 | 0 | 0 | 1 |
FINAL SCORES (with COST SCORES if applicable)
| Proposal | Interview | Enter | References | Final Scores | |||||
| Firm | Average | Average | Cost Scores | Total | Rank | ||||
| firm 1 | 86 | 2 | 0 | 1 | 0 | 0 | 1 | 86 | 2 |
| firm 2 | 88 | 1 | 0 | 1 | 0 | 0 | 1 | 88 | 1 |
| firm 3 | 0 | 3 | 0 | 1 | 0 | 0 | 1 | 0 | 3 |
| firm 4 | 0 | 3 | 0 | 1 | 0 | 0 | 1 | 0 | 3 |
| firm 5 | 0 | 3 | 0 | 1 | 0 | 0 | 1 | 0 | 3 |
| firm 6 | 0 | 3 | 0 | 1 | 0 | 0 | 1 | 0 | 3 |
Ver 10/20/16
Proposal Detail Scores
| RFP Number: Project Name: ____________________ | ||||||||
| SOP SCORE DETAILS | ||||||||
| Proposal Evaluation Detail Scores | Enter actual number of evaluators: | 3 | ||||||
| Evaluation Team | ||||||||
| Maximum | ||||||||
| Score | evaluator 1 | evaluator 2 | evaluator 3 | evaluator 4 | evaluator 5 | |||
| 1 | Consor North America | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | 30 | 22 | 27 | ||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | 15 | 12 | 15 | ||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | 15 | 12 | 14 | ||||
| EVALUATION ITEM 4 – Project Samples | 30 | 28 | 18 | 24 | ||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | 10 | 9 | 8 | ||||
| Enter Eval Criterion 6 | ||||||||
| Enter Eval Criterion 7 | ||||||||
| Enter Eval Criterion 8 | ||||||||
| Enter Eval Criterion 9 | Scoring Deductions | |||||||
| Total | 100 | 98 | 73 | 88 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 98 | 73 | 88 | 0 | 0 | 86.33 |
| 2 | David Evans and Associates | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | 27 | 26 | 25 | ||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | 15 | 12 | 13 | ||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | 13 | 11 | 14 | ||||
| EVALUATION ITEM 4 – Project Samples | 30 | 30 | 27 | 26 | ||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | 10 | 8 | 8 | ||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 95 | 84 | 86 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 95 | 84 | 86 | 0 | 0 | 88.33 |
| 3 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 4 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 5 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 6 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 7 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 8 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 9 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 10 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 11 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 12 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 13 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 14 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 15 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 16 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 17 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
| 18 | Firm Name | |||||||
| EVALUATION ITEM 1 – Specific Experience of Key Staff | 30 | |||||||
| EVALUATION ITEM 2 – Cost Effectiveness | 15 | |||||||
| EVALUATION ITEM 3 – Proposer’s Project Management | 15 | |||||||
| EVALUATION ITEM 4 – Project Samples | 30 | |||||||
| EVALUATION ITEM 5 – Clarity of Proposal and Conformity with Requirements | 10 | |||||||
| Enter Eval Criterion 6 | 0 | |||||||
| Enter Eval Criterion 7 | 0 | |||||||
| Enter Eval Criterion 8 | 0 | |||||||
| Enter Eval Criterion 9 | 0 | Scoring Deductions | ||||||
| TOTAL | 100 | 0 | 0 | 0 | 0 | 0 | 0.00 | |
| Scoring Deduction Points | 0 | 0 | 0 | 0 | 0 | |||
| TOTAL (incl. Scoring Deductions) | 0 | 0 | 0 | 0 | 0 |
Interview Detail Scores
| RFP Number: Project Name: ____________________ | |||||||
| INTERVIEW SCORE DETAILS | |||||||
| Enter actual number of interview evaluators: | 1 | ||||||
| Evaluation Team | |||||||
| Maximum | |||||||
| Score | evaluator 1 | evaluator 2 | evaluator 3 | evaluator 4 | evaluator 5 | ||
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| Firm Name | |||||||
| Eval criterion/question 1 | 0 | ||||||
| Eval criterion/question 2 | 0 | ||||||
| Eval criterion/question 3 | 0 | ||||||
| Eval criterion/question 4 | 0 | ||||||
| Eval criterion/question 5 | 0 | ||||||
| Eval criterion/question 6 | 0 | ||||||
| Eval criterion/question 7 | 0 | ||||||
| Eval criterion/question 8 | 0 | ||||||
| Eval criterion/question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 |
References Detail Scores
| RFP Number: Project Name: ____________________ | |||||||
| References Evaluation Detail Scores | |||||||
| Enter actual number of references scored: | 1 | ||||||
| Reference Scores | |||||||
| Maximum | |||||||
| Score | reference 1 | reference 2 | reference 3 | reference 4 | reference 5 | ||
| 1 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| 2 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| 3 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| 4 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| 5 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 | |
| 6 | Firm Name | ||||||
| Criterion/Question 1 | 0 | ||||||
| Criterion/Question 2 | 0 | ||||||
| Criterion/Question 3 | 0 | ||||||
| Criterion/Question 4 | 0 | ||||||
| Criterion/Question 5 | 0 | ||||||
| Criterion/Question 6 | 0 | ||||||
| Criterion/Question 7 | 0 | ||||||
| Criterion/Question 8 | 0 | ||||||
| Criterion/Question 9 | 0 | ||||||
| TOTAL | 0 | 0 | 0 | 0 | 0 | 0 |
&"Arial,Bold"&12REFERENCES SCORE DETAIL RFP xxx (PCMS xxx) &"Arial,Bold Italic"[insert project name]
File details come from the government source that posted it. Updated .