00010179_CDM_Smith_Intent_to_Award.pdf
PDF 313 KB Posted
- Attached to
- Heavy Truck Tax Comparison Study
- Solicitation number
- S-73000-00010179
- Issued by
- Marion County, Oregon
About this file
This document is an Intent to Award notice from the Oregon Department of Transportation (ODOT) for an RFP/OregonBuys Bid Solicitation No. S-73000-00010179 for a Heavy Truck Tax Comparison Study. ODOT has selected CDM Smith Inc. as the top-ranked firm for negotiations of a contract to provide personal services as specified in the RFP. The notice includes the scoring and rankings of all proposers, a schedule for completing the statement of work, preparing a breakdown of costs, and securing approvals. It also outlines the protest period for competing proposers to submit a written selection protest.
The intent to award is for a Heavy Truck Tax Comparison Study to be conducted in the state of Oregon, specifically in Marion County. The notice provides details on the award submittal requirements, including certificates of insurance, W-9 form, responsibility inquiry, breakdown of costs, and ACH direct deposit for ongoing monthly payments. The notice does not provide specifics on pricing terms, set asides, incumbents, funding requirements, or sources.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BID 2024-31 Clarifying Questions 1.pdf | ||
| 00010179-RFP-Attachment_C.doc | DOC document | |
| 00010179_Q&A_Vol1~4.pdf | ||
| BID 2024-31 Lake Road Health Center Drywall.pdf | ||
| 00010179_Addendum_1.pdf | ||
| 00010179-RFP-Attachment_B.doc | DOC document | |
| 00010179-RFP-Attachment_H.pdf | ||
| 00010179-Full_RFP-Heavy_Truck_Tax_Comparison_Study.pdf | ||
| 00010179-RFP-Attachment_A.pdf | ||
| 00010179-RFP-Attachment_G.docx | DOCX document | |
| 00010179-RFP-Attachment_E.docx | DOCX document | |
| 00010179_Addendum_2.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Intent to Award Page 1 of 3
Level 3 - Restricted Level 3 - Restricted
OREGON DEPARTMENT OF TRANSPORTATION
Notice of Intent to Award
DATE: September 23, 2024 TO: Proposers and ODOT Project Manager SUBJECT: RFP/ OregonBuys Bid Solicitation No.: S-73000-00010179
Heavy Truck Tax Comparison Study
CDM Smith is the top ranked firm selected for negotiations of a Contract to provide Personal Services as specified in the above referenced RFP. The scores and rankings of all Proposers are shown in the table below. The award submittal requirements stated in the RFP are summarized on Attachment 1 of this notice.
Firm Total Rank CDM Smith Inc. 128 1 Economic Consultants Oregon, Ltd. (ECOnorthwest) 113 2 Level 4 Ventures, Inc. 97 3 Kernutt Stokes, LLP 63 4
Allen Molina will be the ODOT Project Manager (PM) for this Project. ODOT’s PM will initiate contact with Consultant and will be the primary contact for negotiation of the statement of work (SOW), schedule of performance and costs under the Contract. Following discussion and agreement on the SOW, a Breakdown of Costs (BOC) must be completed (using the BOC or BOC-NBR as applicable) and submitted to ODOT’s PM.
To set expectations for the contracting phase, listed below is a schedule for completing the SOW, preparing a BOC, completing negotiations, and securing approvals for both the Consultant and ODOT to follow:
Activity Responsible Party Business Days
N eg ot ia tio ns
Establish work session to discuss the SOW with
Consultant
ODOT PM Within 10-14 days of this notice (days depend on size and complexity of the project) Respond to work session with comments/edits to
SOW
Consultant Within 5 days of work session
Respond to SOW comments/edits
ODOT PM Within 3 days of receipt of Consultant comments/edits
Submission of BOC Consultant Within 5-10 days of final ODOT scope (days depend on size and complexity of the project) Respond to BOC, negotiate, and submit to
OPO
ODOT PM Within 5-10 days of Consultant submission of the BOC (days depend on the size and complexity of the project)
RFP/ OregonBuys Bid Solicitation No.: S-73000-00010179 Heavy Truck Tax Comparison Study
Intent to Award Page 2 of 3
Level 3 - Restricted
Activity Responsible Party Business Days Draft final documents OPO and ODOT PM Up to 20 business days of submission of the negotiated SOW and BOC from ODOT PM Signature routing and execution OPO, Consultant, and
ODOT Expenditure Authority (if required)
Within 6-8 days from initial routing
Issue Notice to Proceed (NTP) ODOT PM 1 day after execution
Negotiations are anticipated to be completed within the schedule set forth in this notice.
If the schedule for negotiations cannot be met and the Consultant and ODOT are negotiating in good faith, additional time may be mutually agreed upon.
If agreement on costs, tasks, or other Contract requirements cannot be reached within this time frame, ODOT may terminate the negotiations and begin negotiations with the next highest ranked firm as provided in the solicitation and governing Oregon Administrative Rules (OARs).
Note that no work is authorized until the Contract is executed and Consultant has received a written NTP from the ODOT PM.
Because this notice is being emailed, the date of this notice will start the protest period for competing proposers to submit a written selection protest (reference Section 5.2 of the RFP). Any proposer who claims to have been adversely affected or aggrieved by the selection of a higher ranked proposer must deliver a written selection protest to my attention and received at the email address below no later than 5:00 p.m. on September 30, 2024. ODOT shall not consider a selection protest submitted after the deadline established herein. To be adversely affected or aggrieved, a protestor must demonstrate that the protester was ranked higher than other selected proposers and that higher ranked proposers are ineligible for selection.
ODOT would like to thank each Proposer for your time and efforts in preparing a response to this solicitation.
Sincerely, Summer Anne Guthrie Contract Specialist | ODOT Procurement Office 355 Capitol St. NE, MS 33, Salem, OR 97301 Phone 503.983.4214 Summer.Guthrie@ODOT.Oregon.gov mailto:Summer.Guthrie@ODOT.Oregon
RFP/ OregonBuys Bid Solicitation No.: S-73000-00010179 Heavy Truck Tax Comparison Study
Intent to Award Page 3 of 3
Level 3 - Restricted
Attachment 1 – Award Submittal Requirements
Please email the following items required by the RFP (see detailed requirements and due date for each item in Section 5.3 of the RFP).
• Certificates of Insurance (to me, OPO Contract Coordinator)
• W-9 Form (if any changes since last submitted send directly to ODOT Financial Services at
Table.Maintenance.ODOT.TEAMS@ODOT.Oregon.gov)
• Responsibility Inquiry (RFP Attachment G – to me, OPO Contract Coordinator)
• Breakdown of Costs (when developed send to APM with cc to me, OPO Contract Coordinator)
Direct Deposit via Automated Clearing House (ACH). For Consultants that receive ongoing monthly payments from Agency on one or more contracts or work orders, Agency prefers making Consultant payments via ACH direct deposit. While not required, if Consultant has not previously authorized ACH direct deposit and would prefer ACH to expedite transfer of payments after invoices are approved, Consultant must complete a Vendor ACH Authorization form and submit to Agency per the instructions on the form. To expedite Consultant’s payments to its subcontractors, if applicable, Consultant should make reasonable efforts to offer ACH direct deposit payments.
mailto:Table.Maintenance.ODOT.TEAMS@ODOT.Oregon.gov https://www.oregon.gov/ODOT/Forms/2ODOT/7310781.pdf
OREGON DEPARTMENT OF TRANSPORTATION
File details come from the government source that posted it. Updated .