This is a specifications document for exterior athletic lighting at East Georgia State College's Tennis Complex, establishing performance and design standards for an LED lighting system installation. The project encompasses lighting for three tennis courts, with the primary objectives of guaranteeing minimum light levels for 25 years, minimizing environmental light spill and glare, reducing operational costs through energy efficiency, and implementing remote monitoring and control capabilities. The specifications require lighting at an average target illumination of 30 foot-candles with a maximum-to-minimum uniformity ratio of 3.0:1.0 across all three courts, with varying grid point measurements (30 points for Tennis Court 1, 15 for Tennis Court 2, and 45 for Tennis Court 3). The contractor must deliver equipment within 8-10 weeks of receiving approved submittals and complete order information, with field illumination measurements conducted upon substantial completion in accordance with IESNA standards.
The lighting system must operate on 480/277 volts, single phase power, with total energy consumption not exceeding 14.96 kilowatts, and include instant on/off capabilities with three-stage dimming controlled remotely via website, phone, fax, or email with 24/7 manufacturer support. The specifications mandate a 10-year warranty guaranteeing specified light levels, with the manufacturer responsible for all maintenance, parts, labor, and monitoring costs during the warranty period, including detection and repair of individual luminaire outages. The approved basis of design product is Musco's Light-Structure System with TLC for LED, with no substitutions permitted. All system components must meet rigorous durability, corrosion resistance, and safety standards, including UL listing, lightning grounding per NFPA 780, and wind load calculations based on the 2018 International Building Code with ultimate design wind speeds of 120 miles per hour.
Text of this file
SECTION 26 56 68 – EXTERIOR ATHLETIC LIGHTING
Lighting System with LED Light Source
PART 1 – GENERAL
1.1 SUMMARY
A. Work covered by this section of the specifications shall conform to the contract documents, engineering plans as well as state and local codes.
B. The purpose of these specifications is to define the lighting system performance and design standards for East Georgia College and State University Tennis Complex using an LED Lighting source. The manufacturer / contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications.
C. The sports lighting will be for the following venues:
1. Tennis Court 1
2. Tennis Court 2 (includes Batting Cage lighting)
3. Tennis Court 3
D. The primary goals of this sports lighting project are:
1. Guaranteed Light Levels: Selection of appropriate light levels impact the safety of the players and the enjoyment of spectators. Therefore, light levels are guaranteed to not drop below specified target values for a period of 25 years.
2. Environmental Light Control: It is the primary goal of this project to minimize spill light to adjoining properties and glare to the players, spectators and neighbors.
3. Cost of Ownership: In order to reduce the operating budget, the preferred lighting system shall be energy efficient and cost effective to operate. All maintenance costs shall be eliminated for the duration of the warranty.
4. Control and Monitoring: To allow for optimized use of labor resources and avoid unneeded operation of the facility, customer requires a remote on/off control system for the lighting system. Fields should be proactively monitored to detect luminaire outages over a 10-year life cycle. All communication and monitoring costs for 10-year period shall be included in the bid.
1.2 LIGHTING PERFORMANCE
A. Illumination Levels and Design Factors: Playing surfaces shall be lit to an average target illumination level and uniformity as specified in the chart below. Lighting calculations shall be developed and field measurements taken on the grid spacing with the minimum number of grid points specified below. Appropriate light loss factors shall be applied and submitted for the basis of design. Average illumination level shall be measured in accordance with the IESNA LM-5-04 (IESNA Guide for Photometric Measurements of Area and Sports Lighting Installations). Illumination levels shall not to drop below desired target values in accordance to IES RP-6-15, Page 2, Maintained Average Illuminance and shall be guaranteed for the full warranty period.
| Area of Lighting |
| Average Target Illumination Levels |
| Maximum to Minimum Uniformity Ratio |
| Grid Points |
| Grid Spacing |
| Tennis 1 |
| 30FC |
| 3.0:1.0 |
| 30 |
| 20’ x 20’ |
| Tennis 2 |
| 30FC |
| 3.0:1.0 |
| 15 |
| 20’ x 20’ |
| Tennis 3 |
| 30FC |
| 3.0:1.0 |
| 45 |
| 20’ x 20’ |
B. Color: The lighting system shall have a minimum color temperature of 5700K and a CRI of 75.
C. Mounting Heights: Existing steel poles shall remain.
1.3 ENVIRONMENTAL LIGHT CONTROL
A. Light Control Luminaires: All luminaires shall utilize spill light and glare control devices including, but not limited to, internal shields, louvers and external shields. No symmetrical beam patterns are accepted.
B. A technical document addressing the issue of lighting in the vertical plane above the playing surface for aerial sports while achieving desired glare control requirements will be required for approval.
C. Spill Light and Glare Control: To minimize impact on adjacent properties, spill light and candela values must not exceed the following levels taken at 3 feet above grade.
| All Courts |
| Average |
| Maximum |
| 150’ Specified Spill Line Horizontal Footcandles |
| 0.00 |
| 0.01 |
| 150’ Specified Spill Line Max Vertical Footcandles |
| 0.04 |
| 0.18 |
| 150’ Specified Spill Line Max Candela |
| 2957 |
| 8929 |
C. Spill Scans: Spill scans must be submitted indicating the amount of horizontal and vertical footcandles along the specified lines. Light levels shall be taken at 30-foot intervals along the boundary line. Readings shall be taken with the meter orientation at both horizontal and aimed towards the most intense bank of lights. Illumination level shall be measured in accordance with the IESNA LM-5-04 after 1 hour warm up.
D. The efficacy for field aimed fixtures must meet DLC requirement of 105 lumens per watt E. The first page of a photometric report for all luminaire types proposed showing horizontal and vertical axial candle power shall be provided to demonstrate the capability of achieving the specified performance. Reports shall be certified by a qualified testing laboratory with a minimum of five years experience or by a manufacturer’s laboratory with a current accreditation under the National Voluntary Laboratory Accreditation Program for Energy Efficient Lighting Products. A summary of the horizontal and vertical aiming angles for each luminaire shall be included with the photometric report.
PART 2 – PRODUCT
2.1 SPORTS LIGHTING SYSTEM CONSTRUCTION
A. Manufacturing Requirements: All components shall be designed and manufactured as a system. All luminaires, wire harnesses, drivers and other enclosures shall be factory assembled, aimed, wired and tested.
B. Durability: All exposed components shall be constructed of corrosion resistant material and/or coated to help prevent corrosion. All exposed carbon steel shall be hot dip galvanized per ASTM A123. All exposed aluminum shall be powder coated with high performance polyester or anodized. All exterior reflective inserts shall be anodized, coated, and protected from direct environmental exposure to prevent reflective degradation or corrosion. All exposed hardware and fasteners shall be stainless steel, passivated and coated with aluminum-based thermosetting epoxy resin for protection against corrosion and stress corrosion cracking. Structural fasteners may be carbon steel and galvanized meeting ASTM A153 and ISO/EN 1461 (for hot dipped galvanizing), or ASTM B695 (for mechanical galvanizing). All wiring shall be enclosed within the cross-arms, pole, or electrical components enclosure.
C. System Description: Lighting system shall consist of the following:
1. Existing poles will be used
2. Manufacturer will supply all drivers and supporting electrical equipment
a. Remote drivers and supporting electrical equipment shall be mounted approximately 10 feet above grade in aluminum enclosures. The enclosures shall be touch-safe and include drivers and fusing with indicator lights on fuses to notify when a fuse is to be replaced for each luminaire. Disconnect per circuit for each pole structure will be located in the enclosure. Integral drivers are not allowed.
b. If active cooling fans are utilized they are required to be wired for the control system to self-monitor and automatically report any failure or issue to the manufacturer. Technical cutsheets (not illustrative) detailing this function are a required inclusion in the mandatory submittal.
c. Manufacturer shall provide surge protection at the pole equal to or greater than 40 kA for each line to ground (Common Mode) as recommended by IEEE C62.41.2_2002.
4. Wire harness complete with an abrasion protection sleeve, strain relief and plug-in connections for fast, trouble-free installation.
5. All luminaires, visors, and cross-arm assemblies shall withstand 150 mi/h winds and maintain luminaire aiming alignment.
6. Control cabinet to provide remote on-off control, monitoring, of the lighting system. See Section 2.3 for further details.
8. Manufacturer shall provide lightning grounding as defined by NFPA 780 and be UL Listed per UL 96 and UL 96A.
a. Integrated grounding via concrete encased electrode grounding system.
b. If grounding is not integrated into the structure, the manufacturer shall supply grounding electrodes, copper down conductors, and exothermic weld kits. Electrodes and conductors shall be sized as required by NFPA 780.The grounding electrode shall be minimum size of 5/8 inch diameter and 8 feet long, with a minimum of 10 feet embedment. Grounding electrode shall be connected to the structure by a grounding electrode conductor with a minimum size of 2 AWG for poles with 75 feet mounting height or less, and 2/0 AWG for poles with more than 75 feet mounting height.
D. Safety: All system components shall be UL listed for the appropriate application.
2.2 ELECTRICAL
A. Electric Power Requirements for the Sports Lighting Equipment:
1. Electric power: 480/277 Volts, Single Phase
2. Maximum total voltage drop: Voltage drop to the disconnect switch located on the poles shall not exceed three (3) percent of the rated voltage.
B. Energy Consumption: The kW consumption for the tennis court lighting system shall be 14.96 or less.
2.3 CONTROL
A. Instant On/Off Capabilities: System shall provide for instant on/off of luminaires.
B. Lighting contactor cabinet(s) constructed of NEMA Type 4 aluminum, designed for easy installation with contactors, labeled to match field diagrams and electrical design. Manual off-on-auto selector switches shall be provided. Contactors shall be rated 60amp minimum. Each court has a separate feeder. Connect panel control voltage to Court 1 circuit.
C. Dimming: System shall provide for 3-stage dimming (high-medium-low). Dimming will be set via scheduling options (Website, app, phone, fax, email) D. Remote Lighting Control System: System shall allow owner and users with a security code to schedule on/off system operation via a web site, phone, fax or email up to ten years in advance. Manufacturer shall provide and maintain a two-way TCP/IP communication link. Trained staff shall be available 24/7 to provide scheduling support and assist with reporting needs.
The owner may assign various security levels to schedulers by function and/or fields. This function must be flexible to allow a range of privileges such as full scheduling capabilities for all fields to only having permission to execute “early off” commands by phone. Scheduling tool shall be capable of setting curfew limits.
Controller shall accept and store 7-day schedules, be protected against memory loss during power outages, and shall reboot once power is regained and execute any commands that would have occurred during outage.
E. Remote Monitoring System: System shall monitor lighting performance and notify manufacturer if individual luminaire outage is detected so that appropriate maintenance can be scheduled. The controller shall determine switch position (manual or auto) and contactor status (open or closed).
F. Management Tools: Manufacturer shall provide a web-based database and dashboard tool of actual field usage and provide reports by facility and user group. Dashboard shall also show current status of luminaire outages, control operation and service. Mobile application will be provided suitable for IOS, Android and Blackberry devices.
Hours of Usage: Manufacturer shall provide a means of tracking actual hours of usage for the field lighting system that is readily accessible to the owner.
1. Cumulative hours: shall be tracked to show the total hours used by the facility
2. Report hours saved by using early off and push buttons by users.
G. Communication Costs: Manufacturer shall include communication costs for operating the control and monitoring system for a period of 25 years.
H. Communication with luminaire drivers: Control system shall interface with drivers in electrical components enclosures by means of powerline communication.
I. Player Activated Control: Manufacturer shall provide and contractor shall install a push-button control for each set of courts allowing users to press button for operation of the lighting system during the owner specified time period. Lights shall extinguish after preset time set by the owner.
2.4 STRUCTURAL PARAMETERS
A. Wind Loads: Wind loads shall be based on the 2018 International Building Code. Wind loads to be calculated using ASCE 7-16, an ultimate design wind speed of 120 and exposure category C.
PART 3 – EXECUTION
3.1 SOIL QUALITY CONTROL
1. Not applicable
3.2 DELIVERY TIMING
A. Delivery Timing Equipment On-Site: The equipment must be on-site 8 - 10 weeks from receipt of approved submittals and receipt of complete order information.
3.3 FIELD QUALITY CONTROL
A. Illumination Measurements: Upon substantial completion of the project and in the presence of the Contractor, Project Engineer, Owner's Representative, and Manufacturer's Representative, illumination measurements shall be taken and verified. The illumination measurements shall be conducted in accordance with IESNA LM-5-04.
B. Field Light Level Accountability
1. Light levels are guaranteed not to fall below the target maintained light levels for the entire warranty period of 10 years. These levels will be specifically stated as “guaranteed” on the illumination summary provided by the manufacturer.
2. The contractor/manufacturer shall be responsible for conducting initial light level testing and an additional inspection of the system, in the presence of the owner, one year from the date of commissioning of the lighting.
3. The contractor/manufacturer will be held responsible for any and all changes needed to bring these fields back to compliance for light levels and uniformities. Contractor/Manufacturer will be held responsible for any damage to the fields during these repairs.
C. Correcting Non-Conformance: If, in the opinion of the Owner or his appointed Representative, the actual performance levels including footcandles and uniformity ratios are not in conformance with the requirements of the performance specifications and submitted information, the Manufacturer shall be required to make adjustments to meet specifications and satisfy Owner.
3.4 WARRANTY AND GUARANTEE
A. 10-Year Warranty: Each manufacturer shall supply a signed warranty covering the entire system for 10 years from the date of shipment. Warranty shall guarantee specified light levels. Manufacturer shall maintain specifically-funded financial reserves to assure fulfillment of the warranty for the full term. Warranty does not cover weather conditions events such as lightning or hail damage, improper installation, vandalism or abuse, unauthorized repairs or alterations, or product made by other manufacturers.
B. Maintenance: Manufacturer shall monitor the performance of the lighting system, including on/off status, hours of usage and luminaire outage for 10 years from the date of equipment shipment. Parts and labor shall be covered such that individual luminaire outages will be repaired when the usage of any field is materially impacted. Manufacturer is responsible for removal and replacement of failed luminaires, including all parts, labor, shipping, and equipment rental associated with maintenance. Owner agrees to check fuses in the event of a luminaire outage.
PART 4 – DESIGN APPROVAL
4.0 PRE-BID SUBMITTAL REQUIREMENTS
B. Basis of Design Product: Musco’s Light-Structure SystemTM with TLC for LEDTM is the approved product. No substitutions will be allowed.
Page 6 of 8 M-1995-enUS-5
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .