Addendum No. #2 is issued by Giffels Webster for the City of Ecorse's DWSRF 7892-01 Water Main Replacement project, dated 06/16/25. The addendum provides clarifications and answers to bidder questions regarding a water infrastructure project involving the replacement of approximately 12,684 feet of water mains in various residential neighborhoods, including upsizing from 6-inch to 8-inch ductile iron pipes and replacing 500 lead or galvanized service lines. The document addresses key project logistics such as staging areas (with city-owned properties available), traffic control, right of entry requirements, and material testing, with the contractor responsible for scheduling and most operational aspects.

The project is funded through the Michigan Department of Environment, Great Lakes, and Energy (EGLE) Drinking Water State Revolving Fund (DWSRF), which mandates federal funding requirements be incorporated into contract documents. Permit fees will be reimbursed through a Permit Allowance pay item, and city permit fees will be waived. The addendum clarifies that a licensed plumber is required only for interior piping and connections during lead service replacements, and that quantities shown in bid documents are expected but subject to change based on actual field conditions. The contractor will be compensated for exploratory investigations, such as hydro-vac exploration, under a specific pay item, with the intent of locating stop boxes and identifying pipe materials.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

#20519.00 City of Ecorse Ecorse DWSRF 7892-01 Water Main Replacement

Giffels Webster 00 91 13-1 Addendum No. #2

ADDENDUM NO. #2

ISSUE DATE: 06/16/25

The following changes and/or clarifications shall be incorporated into said Bid Documents, and such changes shall be allowed for in the Bid by the Contractor. The Bid Form shall represent the conditions as set forth in the original Bid Documents, as modified by this Addendum.

1. Revised General Decision Number: MI20250075 06/13/2025.

2. QUESTIONS AND ANSWERS

a. Would the City be able to provide a staging area near or adjacent to the work site(preferably fenced/secure) for the term of the project?

i. There are large city owned properties on Mill Street (both 100 & 205) that are fenced that can be used as a staging area. The city also does own lots throughout the city that can be used for staging but would not be fenced. If the contractor did have certain properties in mind we’d work with you to have an agreement for staging.

b. Are permit fees waived for the project?

i. Permit fees will be reimbursed through Permit Allowance pay item.

ii. Any city permit fee costs will be waived.

c. Is a licensed electrician required?

i. No.

d. Is a licensed plumber required?

i. Per the Private Water Service Replacement Special Provision, a licensed plumber shall be responsible for any interior piping and connections to the existing meter for any lead service replacements.

e. Is the city or the contractor required for no parking?

i. The contractor is responsible for all traffic control measures.

f. Who is responsible for obtaining right of entries?

i. The contractor is responsible to secure the signed consent form. City DPW and

Giffels Webster will provide coordination assistance.

g. Can roads be closed to local traffic only?

i. It is expected that the local roads will be only open to local traffic.

h. Are there any materials testing requirements?

i. The owner will provide material testing of density & pavement, as well as environmental sampling as-needed.

i. Are there any special software requirements?

i. No.

j. Who is responsible for the scheduling services?

i. Contractor is responsible for all scheduling.

k. If hydro-vac exploration is needed and based on results, how will we be compensated?

Finding lead vs galvanized vs copper?

i. It will be paid under Exploratory Investigation, Vertical pay item by Ft.

ii. The intent is to locate stop boxes as the city has records of suspected materials for services.

l. Investigation/Expectation of Rock?

i. It is not expected any investigation of rock be included.

m. Will the quantities be within +/- 5% of the estimated quantities shown in the bid documents.

#20519.00 City of Ecorse Ecorse DWSRF 7892-01 Water Main Replacement

Giffels Webster 00 91 13-2 Addendum No. #2

i. Quantities shown on the plans are expected quantities but are subject to change based on actual field conditions.

Bidder shall acknowledge receipt of this ADDENDUM NO. #2 in the designated area on the provided Bid Form documentation prior to the Bid due date.