00 73 43 Wage Rate Requirements.pdf
PDF 153 KB Posted
- Solicitation number
- SRC0000034426
- Issued by
- Darke County, Ohio
About this file
The documents are Wage Rate Requirements and Existing Condition Information for the Ohio Department of Natural Resources (ODNR) Building F Renovation project, prepared by JS&P Architects. The first document (00 73 43) details prevailing wage rate requirements for public facility construction, mandating that contractors pay local wage rates as issued by the Ohio Department of Commerce's Wage and Hour Bureau. Contractors must submit detailed payroll reports with each payment request, including employee names, hours worked, job classifications, hourly rates, and fringe benefits. The contractor is responsible for compliance with Ohio Revised Code Chapter 4115 and must provide a payroll schedule within 10 days of the Notice to Proceed.
The second document (003119) provides context for existing condition information for the renovation project. It clarifies that the existing condition details are meant to supplement bidders' own investigations and are not a warranty of existing conditions. Existing drawings are available for viewing from the Architect of Record, with contact information provided, though existing specifications are not available for review. The document also references related requirements such as Instructions to Bidders and Existing Hazardous Material Information, indicating that potential bidders should conduct thorough site examinations and review hazardous material reports as part of their due diligence.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Document 00 73 43 - Wage Rate Requirements State of Ohio Standard Requirements for Public Facility Construction
M140-00 73 43 2018-OCT Page 1 of 1
PREVAILING WAGE RATES
1.1 Payment of Prevailing Wage Rates
1.1.1 The Contractor shall pay the prevailing wage rates of the Project locality, as issued by the Ohio Department of Commerce, Wage and Hour Bureau to laborers and mechanics performing Work on the Project.
1.1.2 The Contractor shall comply with the provisions, duties, obligations, and is subject to the remedies and penalties of ORC Chapter 4115.
1.1.3 If the Contractor or its Subcontractors fail to comply with ORC Chapter 4115, the Contracting Authority may withhold payment pursuant to Section 9.8.2.5 of the General Conditions. The Contractor is liable for violations committed by the Contractor or its Subcontractors to the extent provided in ORC Chapter 4115.
1.1.4 The Contractor shall submit all payroll reports in compliance with the requirements of Section 1.2 for all employees of the Contractor and of the Contractor’s Subcontractors.
1.1.5 By executing a Contract, the Contractor certifies that it based its Bid upon the prevailing rates of wages as ascertained by the Ohio Department of Commerce, Wage and Hour Bureau for the Project as provided in ORC Sections
4115.03 through 4115.14, which are inserted at the end of this Document.
1.2 Prevailing Wage Rate Revisions
1.2.1 The Contracting Authority shall, within 7 business days after receipt of a notice of a change in the prevailing wage rates, notify the Contractor of the change. The prevailing wage rates are available at the Ohio Department of Commerce’s web site: http://com.state.oh.us/.
1.2.2 The Contractor shall pay any revised wage rates issued during the term of the Contract.
1.3 Payroll Schedule
1.3.1 Within 10 days of the date of the Notice to Proceed, the Contractor shall provide the Contracting Authority’s Prevailing Wage Coordinator a schedule of dates during the term of the Contract on which wages shall be paid to employees for the Project.
1.4 Payroll Reports
1.4.1 The Contractor shall submit payroll reports with each Contractor Payment Request, which reports shall be certified by the Contractor that the payroll is correct and complete, and that the wage rates shown are not less than those required by the Contract. The Contractor is responsible for submitting all payroll reports of its Subcontractors.
1.4.1.1 Each payroll report shall indicate the period covered and include a list containing the name, address, and last four digits of the social security number of each employee of the Contractor and its Subcontractors paid for the Work.
1.4.1.2 Each payroll report shall list the number of hours each employee worked each day on the Project during the reporting period, the total hours each week on the Project, the employee's hourly rate of pay, job classification, hourly rate of fringe benefits, and all deductions from wages and net pay.
1.4.1.3 Each payroll report shall list each fringe benefit and state if it is paid as cash to the employee or to a named plan.
1.4.1.4 The Contractor and its Subcontractors shall submit apprenticeship agreements for all apprentices utilized on the Project with the first payroll report from the Contractor or its Subcontractor that includes apprentices.
END OF DOCUMENT
DNR-240001 Ohio Department of Natural Resources JS&P Architects Building F Renovation 2024.09.03 Bid Documents
EXISTING CONDITION INFORMATION 003119 - 1
DOCUMENT 003119 - EXISTING CONDITION INFORMATION
1.1 EXISTING CONDITION INFORMATION
A. This Document with its referenced attachments is part of the Procurement and Contracting Requirements for Project. They provide Owner's information for Bidders' convenience and are intended to supplement rather than serve in lieu of the Bidders' own investigations. They are made available for Bidders' convenience and information, but are not a warranty of existing conditions. This Document and its attachments are not part of the Contract Documents.
B. Existing drawings that include information on existing conditions including previous construction at Project site are available for viewing from the Architect of Record. Contact ccastleman@jeromescott-architects.com
C. Existing specifications that include information on existing conditions including previous construction at Project site are not available for viewing.
D. Related Requirements:
1. Document 00 213 "Instructions to Bidders" for the Bidder's responsibilities for examination of Project site and existing conditions.
2. Document 00 31 26 "Existing Hazardous Material Information" for hazardous materials reports that are made available to bidders.
END OF DOCUMENT 003119