This document is a Price Schedule for the Glen Canyon Powerplant Cranes Modernization project, part of the Colorado River Storage Project spanning Arizona and Utah. The price schedule contains 14 Contract Line Item Numbers (CLINs) covering various crane-related services and modernization activities, including mobilization, document management, asbestos removal, electrical systems work, crane control upgrades, equipment removal, and load testing for both East and West Bridge Cranes. Each line item is priced as a lump sum, with specific technical sections referenced, such as 02 82 20 for asbestos removal, 26 05 10 for conductors and cables, and 41 22 14 for crane control upgrades. The document indicates that offers will only be considered for the entire price schedule, not partial submissions, and are subject to the solicitation's terms and conditions.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Glen Canyon Powerplant Cranes Modernization Middle River Division – Glen Canyon Unit – Arizona – Utah Colorado River Storage Project Specification No.
Price Schedule
B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
GLEN CANYON POWERPLANT
POWERPLANT CRANES MODERNIZATION
COLORADO RIVER STORAGE PROJECT
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(d) Definitions:
(1) CLIN – Contract Line Item Number.
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
2 01 31 30 Contract Document Management System
For the lump sum of $
3 02 82 20 East Bridge Crane, Removal and Disposal of Asbestos Containing Materials
For the lump sum of $
4 02 82 20 West Bridge Crane, Removal and Disposal of Asbestos Containing Materials
For the lump sum of $
5 26 05 10 Conductors and Cables For the lump sum of $
6 26 05 30 Raceways, Conduit, and Boxes for Electrical Systems
For the lump sum of $
Glen Canyon Powerplant Cranes Modernization Middle River Division – Glen Canyon Unit – Arizona – Utah Colorado River Storage Project Specification No.
Price Schedule
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
7 41 22 14 East Bridge Crane Control Upgrade and Modernization
For the lump sum of $
8 41 22 14 West Bridge Crane Control Upgrade and Modernization
For the lump sum of $
9 41 22 14 East Bridge Crane Load Testing
For the lump sum of $
10 41 22 14 West Bridge Crane Load Testing
For the lump sum of $
11 41 22 21 East Bridge Crane, Removal of Existing Equipment
For the lump sum of $
12 41 22 21 West Bridge Crane, Removal of Existing Equipment
For the lump sum of $
13 41 22 21 Runway Collectors and Molded-case Circuit Breaker East Bridge Crane
For the lump sum of $
14 41 22 21 Runway Collectors and Molded-case Circuit Breaker West Bridge Crane
For the lump sum of $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES