Contract awards
61 As contracting staff
First SAM.gov record

Awards come from FPDS, which names the staff who created, approved or last changed an award without saying which. FPDS publishes their email address only; the name is the one it spells.

Contract awards and IDVs

Award Awarded Obligated
Contract for tainter gate painting, wilbur d. Mills DAM, pool 2, mkarns, arkansas county, arkansas reference no. R00005… W9127S20C0008 · Mccormick Industrial Abatement Services, Inc. · ENDIST Little Rock (USACE) $2,599,044
Tainter gate painting and rehabilitation at arthur v. Ormond lock and DAM. Initial duration 1,455 days after receipt of… W9127S24C0001 · Mccormick Industrial Abatement Services, Inc. · ENDIST Little Rock (USACE) $14,486,741
Design build initial outfitting (dbio), nellis ADB, NV W9127S20F0210 · Walsh Construction Company II, LLC · ENDIST Little Rock (USACE) $88,186,709
Maumelle river ecosystem restoration cap section 206, arkansas river watershed, pulaski county, AR W9127S25C0002 · SNA Contracting LLC · ENDIST Little Rock (USACE) $1,642,716
Design-bid-build of three rivers phase 2 hydraulic containment structure and modifications to owens lake and LA grues… W9127S25C0001 · Barnard Construction Company, Incorporated · ENDIST Little Rock (USACE) $108,339,709
Greers ferry motor control centers/AC-DC W9127S23F0001 · Koontz Electric Company, Incorporated · ENDIST Little Rock (USACE) $6,481,463
FY20 fort mcnair, building 58 renewal, fort mcnair, washington DC W9127S20F0121 · Herman Construction Group, Inc. · ENDIST Little Rock (USACE) $8,826,640
Design and renovation of building 511, vivarium, at walter reed army institute of research. W9127S15C6005 · Turner Construction Company · ENDIST Little Rock (USACE) $58,921,145
Lock chamber bulkhead recess for 110-foot stoplogs, dardanelle lock and DAM. Task order no. 1 under CE-SWL 110-foot… W9127S24F0069 · Mcmillen, Inc. · ENDIST Little Rock (USACE) $16,739,993
Tow haulage system replacement, murray lock and DAM, mcclellan-kerr arkansas river navigation system, pulaski county… W9127S23C0005 · Graylee Construction LLC · ENDIST Little Rock (USACE) $2,465,999
Provide relocation, dirt work and foundation, and erection of two approximately 5,000 SF metal buildings near the… W9127S24C0002 · Graylee Construction LLC · ENDIST Little Rock (USACE) $964,376
Design build initial outfitting (dbio), tyndall AFB, FL W9127S21F6020 · J.e. Dunn Construction Company · ENDIST Little Rock (USACE) $29,422,763
Potable water piping W9127S23C0002 · IHP Industrial Inc. · ENDIST Little Rock (USACE) $795,358
Roof W9127S22F6028 · SES Construction And Fuel Services LLC · ENDIST Little Rock (USACE) $3,267,223
Intake gate machinery rehabilitation at norfork DAM. 730-day completion period after NTP. W9127S22C0004 · Occi Inc. · ENDIST Little Rock (USACE) $4,309,049
Design-build construction of a new weir opening at the site of the mcclellan-kerr arkansas navigation system, three… W9127S22F0082 · Bfbc LLC · ENDIST Little Rock (USACE) $182,183,050
Base bid: construction FT bragg clark clinic replace PA and nurse call W9127S21F6025 · SES Construction And Fuel Services LLC · ENDIST Little Rock (USACE) $474,000
Ozark lock and DAM tainter gate painting POP for base 365 days POP for option 1 and 2 add 90 days each W9127S20C0007 · Royal Bridge, Inc. · ENDIST Little Rock (USACE) $4,522,207
Correct water intrusion W9127S20F0215 · J & J Maintenance Inc. · ENDIST Little Rock (USACE) $8,884,691
Tainter gate painting (5-15), ozark lock and DAM, mkarns, franklin county, arkansas. 285-day completion period for base… W9127S22C0003 · Royal Bridge, Inc. · ENDIST Little Rock (USACE) $15,913,663
Design-build initial outfitting (dbio) project for the in-patient, out-patient, and satellite pharmacy renovation at… W9127S19F0161 · J.e. Dunn Construction Company · ENDIST Little Rock (USACE) $34,289,385
Renovate joel clinic FT bragg, NC W9127S21F6021 · Royce Construction Services, LLC · ENDIST Little Rock (USACE) $2,516,839
Units 1-2 generator stator rewind, beaver powerhouse. Completion due 705 calendar days after NTP. W9127S21C0006 · Andritz Hydro Corp · ENDIST Little Rock (USACE) $20,156,744
Bridge crane replacement at norfork powerhouse POP is 550 days. W9127S20C0004 · Sievert Electric Service And Sales Company · ENDIST Little Rock (USACE) $3,480,724
Tyndall AFB design build initial outfitting FY19 medical warehouse renovation W9127S19F0144 · Specpro Environmental Services LLC · ENDIST Little Rock (USACE) $7,557,114
Show 15 more

Latest 25 of 61 listed here. See the rest on GovTribe.

Top vendors

Top NAICS codes

Top PSC codes

Offices

Quick answers

Who is Todd Hill?

Todd Hill is a federal contracting contact at US Army Corps of Engineers (Department of the Army). Contracting staff on 61 contract awards, from April 16, 2018 to October 20, 2025.

What agency does Todd Hill work for?

Todd Hill's SAM.gov records name US Army Corps of Engineers (Department of the Army) most, among 10 offices.

How do I contact Todd Hill?

FPDS lists Todd Hill's email todd.hill@usace.army.mil.

Which vendors has Todd Hill awarded contracts to?

The vendors on the most contract awards and IDVs naming Todd Hill are SES Construction And Fuel Services LLC, J.e. Dunn Construction Company and Structsure Projects Inc.

On GovTribe

See Todd Hill's full record

  • Every notice, award and file that names them
  • Their buying profile: what they buy and from whom
  • Export contacts at this office
  • Ask GovTribe AI about this contact