Aircraft and Airframe Structural Components Modification Government Contracts

PSC K015 Modification of Equipment: Aircraft and Airframe Structural Components Service code

Code facts

Spend category
Equipment Related Services Equipment Modification
Contract obligations
$176,324,178 In FY2025

PSC codes and definitions come from the GSA PSC Manual and contract spending from SAM.gov/FPDS.

Market summary

Open opportunities
0 3 notices posted in the last 90 days
Contract awards
16 In the last 12 months
Obligated
$130,743,377 In the last 12 months, net of deobligations

Top buying agencies by obligations

Rank Agency Obligated, FY2026–FY2027 Share
1 Department of the Navy Department of Defense $104,553,765
2 Air Force Department of Defense $13,832,021
3 National Aeronautics and Space Administration $13,646,044
4 Department of Homeland Security $3,192,169
5 Defense Contract Management Agency Department of Defense $936,783

Top contractors by obligations

Rank Contractor Obligated, FY2026–FY2027 Share
1 The Boeing Company UEI LYL4E7AZMKN7 $32,650,148
2 Magee Technologies LLC $22,140,995
3 General Atomics Aerotec Systems GMBH $19,660,316
4 Systems Application & Technologies Inc. $13,674,401
5 Yulista Contract Services LLC $13,185,216
6 Denmar Technical Services Inc. $10,385,434
7 V2X Aerospace LLC $6,786,837
8 The Boeing Company UEI JJM4FRDZJDX1 $5,574,454
9 The Boeing Company UEI WZWRLY4G3PL8 $4,536,497
10 Avenger Aerospace Solutions Inc. $3,260,610

Contract opportunities

Notice Posted Due
CH-53 Depot Level Aircraft Modifications Pre-Solicitation · Naval Air Systems Command (Navy) · N00019-26-RFPREQ-APM261-0681
PMA-262 Triton, Research and Development Material Procurement Pre-Solicitation · Naval Air Warfare Center (NAVAIR)
F /A-18 E/F and EA-18G Depot Level Maintenance (DLM) 2029-2034 Pre-Solicitation · Naval Air Systems Command (Navy)
P-8A Poseidon Increment 3 Block 2 Modification Kit Installation Pre-Solicitation · Naval Air Systems Command (Navy)
HH-60W Degraded Visual Environment System(DVES) - FA8552-26-R-B001 Solicitation · AFLCMC Robins AFB · FA8552-26-R-B001
HH-60W Degraded Visual Environment System(DVES) - FA8552-26-R-B001 Pre-Solicitation · AFLCMC Robins AFB · FA855226RB001
F-15SA Programmed Depot Maintenance (PDM) Pre-Solicitation · Lifecycle Management Center (AFMC)
Reduced Gravity Modification of 737-73W Aircraft Limited / Sole Source Justification · Armstrong Flight Research Center —
Award Notice for Gulfstream V Nadir Viewport Installation Award Notice · Armstrong Flight Research Center —
CH-53 Depot Level Aircraft Modifications Pre-Solicitation · Naval Air Systems Command (Navy) · N00019-26-RFPREQ-APM261-0058R1
Industry Day - Program Depot Management (PDM) Special Notice · Lifecycle Management Center (AFMC)
CH-53 Depot Level Aircraft Modifications Pre-Solicitation · Naval Air Systems Command (Navy) · N00019-26-RFPREQ-APM261-0058
Program Depot Management (PDM) Pre-Solicitation · Lifecycle Management Center (AFMC)
Notice of Intent to Sole Source - Reduced Gravity Modification of 737-73W Aircraft Pre-Solicitation · Armstrong Flight Research Center
Gulfstream V Nadir Viewport Installation Solicitation · Armstrong Flight Research Center · 80AFRC26Q0002
Gulfstream V Nadir Viewport Installation Pre-Solicitation · Armstrong Flight Research Center · 80AFRC26SS005
UH-60 Black Hawk Commercial Modification RFI Pre-Solicitation · ACC Redstone
RFP: Aircraft Instrumentation Division (AID) Follow On Solicitation · Naval Air Warfare Center (NAVAIR)
Draft RFP: Aircraft Instrumentation Division (AID) Follow On Special Notice · Naval Air Warfare Center (NAVAIR)
H-60 MEDEVAC Cabin Cooling Pre-Solicitation · ACC Redstone
Follow-On Test and Evaluation Support for F/A-18 and EA-18G Aircraft (Operating Periods 23-27) Pre-Solicitation · Naval Air Systems Command (Navy)
Sources sought for technical, engineering, installation and manufacturing support for aircraft instrumentation division (aid), naval air warfare center aircraft division (NAWCAD) Pre-Solicitation · Naval Air Warfare Center (NAVAIR)
Triton Mobile Mission Systems (MMS) Support Services Pre-Solicitation · Naval Air Warfare Center (NAVAIR)
H-60 MEDEVAC Powered Ascender Pre-Solicitation · ACC Redstone
APSD Contractor Support Services Pre-Solicitation · Naval Air Warfare Center (NAVAIR)
C-12 Multiple ECPs PMA-207 Pre-Solicitation · Naval Air Systems Command (Navy)
Aircraft Prototype System Division (APSD) Contractor Support Services (CSS) Solicitation · Naval Air Warfare Center (NAVAIR)
All Suppliers (organic and commercial) for Cockpit Radio Frequency (RF) Protection Replacement Windows for the E-2D aircraft with capabilities and Qualifications of RF protection windows in support of US Navy and Foreign Military Sales (FMS) customers Pre-Solicitation · Naval Air Systems Command (Navy) · N00019-25-RFPREQ-TPM231-0148
All Suppliers (organic and commercial) for Cockpit Radio Frequency (RF) Protection Replacement Windows for the E-2D aircraft with capabilities and Qualifications of RF protection windows in support of US Navy and Foreign Military Sales (FMS) customers Pre-Solicitation · Naval Air Systems Command (Navy) · N00019-24-RFPREQ-TPM231-0148
DRAFT Request for Proposal- Aircraft Prototype System Division Pre-Solicitation · Naval Air Warfare Center (NAVAIR)
USACAPOC(A) C-130 H Trainer Requirement Solicitation · Mission and Installation Contracting Command (AMC)
GULFSTREAM-IV NEXT GENERATION AIRBORNE SYNTHETIC APERTURE RADAR (AirSAR-NG) MODIFICATION Pre-Solicitation · Armstrong Flight Research Center
Notice of Contract Action – Sole-Source Award for E-7A Advanced Procurement of Long Lead Items Pre-Solicitation · AFLCMC Hanscom AFB
Industry Day- Aircraft Prototype System Division Special Notice · Naval Air Warfare Center (NAVAIR)
B777-200ER Viewport Installations Pre-Solicitation · Langley Research Center
P-8A Poseidon Systems and Software Engineering Platform Sustainment Pre-Solicitation · Naval Air Systems Command (Navy)
B-52 Military Code (M-Code) Integration Pre-Solicitation · Air Force
Request For Information: B-52 Advanced Extremely High Frequency (AEHF) Pre-Solicitation · Air Force
Justification & Approval for the award of multiple sole-source contracts to the Boeing Company for the acquisition of the E-7A Weapon system Special Notice · AFLCMC Hanscom AFB · FA8730_E-7A_Aquisition_(J_A)
Justification & Approval for the award of multiple sole-source contracts to the Boeing Company for the acquisition of the E-7A Weapon system Special Notice · AFLCMC Hanscom AFB · FA8730_E-7A_Aquisition_J_A
Justification & Approval for the award of multiple sole-source contracts to the Boeing Company for the acquisition of the E-7A Weapon system Special Notice · AFLCMC Hanscom AFB · FA8730_E-7A_Aquisition_Justification_Approval
Justification & Approval for the award of multiple sole-source contracts to the Boeing Company for the acquisition of the E7A Weapon system Special Notice · AFLCMC Hanscom AFB
E-7 Special Notice · Air Force
Hardpoint/External Pod Installation SR-22 Solicitation · Shared Services Center
Boeing Cecil Field (BCF) Depot Level Maintenance (DLM) (2019- 2023) Modification Award Notice · Naval Air Systems Command (Navy) —
HC-130J Missionization Solicitation · Coast Guard · 70Z02322R2DA00100
HC-130J Missionization DRAFT Solicitation Pre-Solicitation · Coast Guard
Design modifications for horus gliders Special Notice · National Oceanic and Atmospheric Administration
HC-130J Missionization Pre-Solicitation · Coast Guard · 70Z02322R2DA0100
F/A-18 Follow On Test and Evaluation (FOT&E) Period 20 Award Notice · Naval Air Systems Command (Navy) —
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

Recent contract awards

Award Awarded Obligated
Aid award, ceiling realignment, incremental funding. N0042126C0030 · Systems Application & Technologies Inc. · Naval Air Warfare Center (NAVAIR) $4,000
The purpose of this order is to provide funds for induction of buno 165543 IAW boeing cecil field FY26 MOD plan (REV… S1110A26F0005 · The Boeing Company · Defense Contract Management Agency $42,826
Induction and modification of tail #62-3660 FA822026FB015 · Yulista Contract Services LLC · AFLCMC Hill AFB $1,978,444
Conduct feasibility assessment boeing 737-700 ability to perform reduced gravity mission 80AFRC26C0003 · Denmar Technical Services Inc. · Armstrong Flight Research Center $10,385,434
Gulfstream V (GV) nadir viewport installation (GVNVI) 80AFRC26P0004 · Avenger Aerospace Solutions Inc. · Armstrong Flight Research Center $3,260,610
Base - labor N0042126F0221 · Magee Technologies LLC · Naval Air Warfare Center (NAVAIR) $12,931,230
Trim induction off load and depot support equipment FA822026FB010 · Yulista Contract Services LLC · AFLCMC Hill AFB $16,792
Trim induction aircraft 67-14920 FA822026FB009 · Yulista Contract Services LLC · AFLCMC Hill AFB $0
Requirement is to upgrade flight deck seats for the E-6B aircraft. N0042126F0405 · Magee Technologies LLC · Naval Air Warfare Center (NAVAIR) $2,876,853
Trim induction FA822026FB008 · Yulista Contract Services LLC · AFLCMC Hill AFB $1,919,582

Latest 10 of 16 awarded in the last 12 months listed here. See the rest on GovTribe.

Contract obligations by fiscal year

Fiscal year Obligated
FY2027 To date $217,322
FY2026 $133,776,380
FY2025 $176,324,178
FY2024 $120,595,676
FY2023 $169,314,534

Contract obligations by state

Rank Place of performance Obligated, last 12 months Share
1 Maryland $34,924,923
2 Florida $32,650,148
3 Alabama $13,185,216
4 Nevada $10,385,434
5 North Carolina $6,786,837
6 Missouri $5,197,657
7 Washington $4,536,497
8 South Carolina $3,249,980
9 Texas $3,192,169
10 Georgia $988,824
11 Kansas $288,565
Show all 11

Shares are of everything obligated under PSC K015 in the last 12 months before deobligations, including work performed abroad or with no place of performance on record.

Quick answers

What is PSC K015?

PSC K015 is Modification of Equipment: Aircraft and Airframe Structural Components, a service code in PSC K, Modification of Equipment.

How many government contracts for aircraft and airframe structural components modification are there?

3 notices under PSC K015 were posted in the last 90 days, and none are open now. Federal agencies awarded 16 contracts under PSC K015 in the last 12 months, obligating $130,743,377.

How much do federal agencies spend under PSC K015?

Federal contracts under PSC K015 obligated $176,324,178 in fiscal year 2025 and $600,228,089 in fiscal years 2023 through 2027.

Who are the largest contractors under PSC K015?

The contractors with the most obligated under PSC K015 in fiscal years 2026 and 2027 are The Boeing Company ($32,650,148), Magee Technologies LLC ($22,140,995) and General Atomics Aerotec Systems GMBH ($19,660,316).

Which agencies buy the most under PSC K015?

The agencies that obligated the most under PSC K015 in fiscal years 2026 and 2027 are Department of the Navy ($104,553,765), Air Force ($13,832,021) and National Aeronautics and Space Administration ($13,646,044).

Which NAICS codes are used with PSC K015?

The NAICS codes with the most obligated under PSC K015 in fiscal years 2026 and 2027 are 336411 Aircraft Manufacturing; 336413 Other Aircraft Parts and Auxiliary Equipment Manufacturing; and 541715 Research and Development in the Physical, Engineering, and Life Sciences (except Nanotechnology and Biotechnology).

Where is the work under PSC K015 performed?

By place of performance, the states with the most contract obligations under PSC K015 over the last 12 months are Maryland ($34,924,923), Florida ($32,650,148) and Alabama ($13,185,216).

What is the latest contract opportunity under PSC K015?

The latest contract opportunity under PSC K015 is CH-53 Depot Level Aircraft Modifications, pre-solicitation from Naval Air Systems Command (Navy), posted October 20, 2026.

On GovTribe

See everything under PSC K015

  • Federal contract opportunities, awards and IDVs under this code
  • Funding analysis by contractor, agency and set-aside
  • Contacts who buy under this code
  • Ask GovTribe AI about this code