PWD Maine MACC 2022-2027
Active Master IDIQ Awarded
- Federal agency
-
Naval Facilities Engineering Command
- Awardees
- 9
- Task orders
- 51
- Obligated
- $151,885,273
Vehicle facts
- Opportunity
-
- Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) - Maine Pre-Solicitation · N4008521R1217 · Posted Dec 22, 2020
- Agency
-
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Combined task order value
- $151,885,273 Current and potential, with all options
- Last date to order 88% complete
- Shared ceiling 61% used
- $249,000,000.00
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
Naval Facilities Engineering Command established PWD Maine MACC 2022-2027, a multiple-award design-build/design-bid-build IDIQ for construction projects in Maine, with ordering authority ending June 2, 2027—approximately ten months remaining. The vehicle carries a shared ceiling of $249 million with no set-aside restrictions at the vehicle level, though individual task orders show mixed set-aside designations.
The vehicle remains active and moderately paced. Forty-eight task orders have been awarded since June 2022, with recent momentum declining: 21 orders in 2023, but only 9 per year in 2022, 2024, and 2025, with the most recent award on December 11, 2025. All $137.9 million in combined potential value across awarded task orders has been obligated, leaving $111.1 million of the $249 million shared ceiling potentially available, though ordering authority expires in ten months.
Awarded work spans facility repairs, renovations, and upgrades at naval installations, including roof replacements, fire suppression modernization, HVAC systems, domestic water system repairs, industrial equipment installation, crane rail alignment, and communications infrastructure. Recent large orders include a $19.9 million DD123 audit repairs task order (August 2023), a $10.9 million barrier protection project (September 2025), a $10 million B343 occupancy renovation (September 2023), and an $8.1 million building renovation and life safety project (September 2023). Task orders typically range from $200,000 to $7.7 million, with firm fixed pricing.
Competition concentrates among three large primes. Nadiad Inc. holds 11 orders worth $63.7 million (46% of combined potential value); Armitage SAI JV holds 14 orders worth $30.5 million; and CCI Facility Support Services holds 12 orders worth $27.9 million. Together these three account for 37 of 48 orders (77%) and $121.9 million of $137.9 million in potential value (88%). The remaining six awardees split nine orders totaling $15.9 million.
Demand concentrates within the Navy. Naval Facilities Engineering Command places 25 orders ($56.1 million), Naval Installations Command places 15 orders ($52.6 million), Naval Sea Systems Command places 7 orders ($26.8 million), and Fleet Cyber Command places 1 order ($2.3 million)—Navy entities account for all 48 orders. The vehicle serves shipyard and naval base infrastructure at Portsmouth Naval Shipyard (Kittery, Maine) and other Maine-based naval facilities.
Set-aside distribution shows 40 unrestricted orders (83%), 7 competitive 8(a) orders (15%), and 1 total small business order (2%). Three minimum-guarantee orders of $5,000 each were issued at vehicle establishment; all other orders are performance-based contracts with defined ceilings.
Description
Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) - Maine
IDV awards
Latest task orders
Show 15 more
Latest 25 of 51 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Nadiad Inc. | $63,669,963 | 42% |
| 2 | Armitage SAI JV | $41,322,926 | 27% |
| 3 | CCI Facility Support Services, LLC | $31,116,626 | 20% |
| 4 | Aiko-Kmk MP JV LLC | $6,521,556 | 4% |
| 5 | Addon Services LLC | $3,750,903 | 2% |
| 6 | Full Circle ICC JV LLC | $2,800,709 | 2% |
| 7 | Sgtr RJO JV, LLC | $2,692,589 | 2% |
| 8 | Serena-Asturian JV II LLC | $5,000 | <1% |
| 9 | Kunj Construction Corporation | $5,000 | <1% |
"Minimum guarantee only" marks awardees whose obligations here are just the minimum order their contract guarantees.
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $151,885,273 | 100% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $14,231,680 |
| FY2025 | $39,239,525 |
| FY2024 | $36,030,335 |
| FY2023 | $61,535,516 |
| FY2022 | $848,218 |
Quick answers
What is the PWD Maine MACC 2022-2027 contract vehicle?
PWD Maine MACC 2022-2027 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Facilities Engineering Command (Department of the Navy), awarded on June 3, 2022.
Which companies hold PWD Maine MACC 2022-2027?
9 companies hold PWD Maine MACC 2022-2027's IDV awards, one each. The latest went to Nadiad Inc. on June 3, 2022. The awardees whose task orders obligated the most are Nadiad Inc., Armitage SAI JV and CCI Facility Support Services, LLC.
How much has been spent through PWD Maine MACC 2022-2027?
51 task orders have been placed under PWD Maine MACC 2022-2027, obligating $151,885,273.
What is the shared ceiling of PWD Maine MACC 2022-2027?
PWD Maine MACC 2022-2027's shared ceiling is $249,000,000; its task orders have used 61% of it.
Which agencies use PWD Maine MACC 2022-2027 the most?
The departments whose task orders under PWD Maine MACC 2022-2027 obligated the most are Department of the Navy ($151,885,273).
How much was obligated through PWD Maine MACC 2022-2027 in fiscal year 2025?
Task orders under PWD Maine MACC 2022-2027 obligated $39,239,525 in fiscal year 2025.
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle