Marine Corps Installation East Construction 2015-2020
Ended Master IDIQ Awarded
- Federal agency
-
Naval Facilities Engineering Command
+ 1 more agency
- Awardees
- 6
- Task orders
- 143
- Obligated
- $124,380,878
Vehicle facts
- Opportunity
-
- N4008515R0803 Solicitation number
- Agencies
-
- Naval Facilities Engineering Command Department of the Navy, Department of Defense
- Marine Corps Department of the Navy, Department of Defense
- Combined task order value
- $124,424,801 Current and potential, with all options
- Last date to order 100% complete
- Shared ceiling
- $90,000,000.00 Less than its task orders have obligated
IDV award and task order details come from SAM.gov/FPDS.
About this vehicle
The United States Marine Corps established this Master IDIQ for construction services at Marine Corps Installation East on June 18, 2015, with a shared ceiling of $90 million. The ordering period closed on June 17, 2020; no new delivery orders may be issued against this vehicle.
This vehicle is inactive. The last delivery order was awarded on June 14, 2021, more than five years ago. Of the 143 total task orders awarded across the vehicle's lifetime, ordering activity peaked in 2020 with 47 awards, then dropped sharply to only 7 in 2021 and ceased thereafter. The combined task-order potential value of $124.4 million has been entirely obligated; the vehicle carries no remaining capacity for new work.
The scope of work contracted under this vehicle reflects the full range of installation maintenance and upgrade activity: new construction, demolition, interior and exterior alterations and renovations of buildings and systems, mechanical and electrical infrastructure work, high-voltage electrical distribution extensions, steam and water line extensions, sewer and stormwater systems, painting, hazardous material removal, and incidental related work. Recent orders demonstrate typical project sizes ranging from under $100 thousand for minor repairs (vent fans, electrical outlets, concrete curbing) to over $9.6 million for major renovations and system replacements (building interior/exterior rehabilitation, boiler and chiller installations, raw water line restoration).
Quadrant Construction Inc., Onopa Services LLC, and Civil Works Contracting LLC dominate the vehicle's task-order awards, capturing 97 percent of orders. Quadrant alone holds 53 orders valued at $46.4 million combined potential value; Onopa and Civil Works follow with 37 and 31 orders respectively. The remaining three prime contractors awarded under this vehicle hold minimal shares.
The United States Marine Corps funded 119 of 143 orders ($92 million potential value), representing 83 percent of all awards. The Department of the Navy Naval Facilities Engineering Command, Naval Air Systems Command, and other Navy components funded the balance. No funding concentration from non-Marine Corps agencies materially influences vehicle activity.
Two-thirds of awarded delivery orders (96) carried no set-aside designation; 45 orders (31 percent) were HUBZone set-asides; and only 2 orders (1 percent) were Total Small Business awards. All orders used firm-fixed-price contracting, and typical performance durations ranged from 4 to 18 months from award to completion, with a substantial number extended for unforeseen conditions (COVID-19 pandemic supply chain disruptions feature prominently in late-2020 and 2021 modifications) or design changes.
Description
Master IDIQ for construction services including, but not limited to, new construction, demolition, repair, total/partial interior/exterior alteration/renovation of buildings, systems and infrastructure and may include civil, structural, mechanical, electrical, communication systems, installation of new or extensions to existing high voltage electrical distribution systems, extensions to the existing high pressure steam distribution systems, extensions to the potable water distribution systems, extensions to the sanitary sewer systems, additional storm water control systems, painting, removal of asbestos materials and lead paint, and incidental related work.
IDV awards
Latest task orders
Show 15 more
Latest 25 of 143 listed here. See the rest on GovTribe.
Top awardees by obligations
| Rank | Awardee | Obligated | Share |
|---|---|---|---|
| 1 | Quadrant Construction Inc. | $46,318,732 | 37% |
| 2 | Onopa Services LLC | $37,305,447 | 30% |
| 3 | Civil Works Contracting LLC | $35,214,117 | 28% |
| 4 | Team Henry Enterprises LLC | $2,589,778 | 2% |
| 5 | Hager Construction Co | $2,190,421 | 2% |
| 6 | Heard Construction, Inc. | $762,382 | 1% |
Top funding agencies by obligations
| Rank | Funding agency | Obligated | Share |
|---|---|---|---|
| 1 | Department of the Navy | $122,359,887 | 98% |
| 2 | Defense Logistics Agency | $2,020,991 | 2% |
Obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2026 | $55,938 |
| FY2024 | -$526,380 |
| FY2023 | $144,753 |
| FY2022 | $54,758 |
| FY2021 | $12,045,629 |
| FY2020 | $50,746,114 |
| FY2019 | $6,523,114 |
| FY2018 | $30,072,451 |
| FY2017 | $10,283,346 |
| FY2016 | $10,487,035 |
| FY2015 | $4,538,042 |
Show all 11
Quick answers
What is the Marine Corps Installation East Construction 2015-2020 contract vehicle?
Marine Corps Installation East Construction 2015-2020 is an indefinite delivery, indefinite quantity (IDIQ) contract vehicle run by Naval Facilities Engineering Command (Department of the Navy) and Marine Corps (Department of the Navy), awarded on June 18, 2015.
Which companies hold Marine Corps Installation East Construction 2015-2020?
6 companies hold Marine Corps Installation East Construction 2015-2020's IDV awards, one each. The latest went to Team Henry Enterprises LLC on June 18, 2015. The awardees whose task orders obligated the most are Quadrant Construction Inc., Onopa Services LLC and Civil Works Contracting LLC.
How much has been spent through Marine Corps Installation East Construction 2015-2020?
143 task orders have been placed under Marine Corps Installation East Construction 2015-2020, obligating $124,380,878. Their combined current value, with exercised options, is $124,424,801.
What is the shared ceiling of Marine Corps Installation East Construction 2015-2020?
The shared ceiling listed for Marine Corps Installation East Construction 2015-2020, $90,000,000, is less than its task orders have obligated.
Which agencies use Marine Corps Installation East Construction 2015-2020 the most?
The departments whose task orders under Marine Corps Installation East Construction 2015-2020 obligated the most are Department of the Navy ($122,359,887) and Defense Logistics Agency ($2,020,991).
On GovTribe
See this vehicle's full record
- Every IDV award and task order
- Funding by agency, awardee, NAICS and set-aside
- Teaming partners on this vehicle
- Ask GovTribe AI about this vehicle