Paradigm Manchester Inc.
Manchester, CT Doing business as Pursuit Aerospace Part of Turbocombustor Technology, Inc.
- UEI
- DY1HNL3R56H7
- CAGE
- 1J4P3
- Primary NAICS
- 336412 Aircraft Engine and Engine Parts Manufacturing
- SAM.gov registration
- Active through
Company facts
- FY2025 rankings
-
Its parent company, General Electric Company, ranks:
- Self-certified in SAM.gov
- Entity structure
- Corporate Entity (Not Tax Exempt)
- Other NAICS codes in SAM.gov
- Corporate family
-
-
Parent
Turbocombustor Technology, Inc. · Stuart, FL
VCYNDJGAXYE6
-
Parent
Turbocombustor Technology, Inc. · Stuart, FL
VCYNDJGAXYE6
- SAM.gov registration date
- Physical address
- 967 Parker St, Manchester, CT 06042, USA
- Website
- pursuitaero.com
- Employees
- 251-1K
- Estimated annual revenue
- $100M-$250M
- Industry
-
- Industrials
- Capital Goods
- Aerospace & Defense
- SIC code
- 37 Transportation Equipment
- Profiles
Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .
Contract obligations by fiscal year
| Fiscal year | Obligated |
|---|---|
| FY2027 To date | $0 |
| FY2026 | $1,030,195 |
| FY2025 | $526,783 |
| FY2024 | $3,032,025 |
| FY2023 | $318,944 |
Top agencies by obligations
| Rank | Agency | Obligated, FY2026–FY2027 | Share |
|---|---|---|---|
| 1 | Air Force | $1,030,195 |
Contract awards
Latest 5 listed here. See the rest on GovTribe.
Contract subawards
| Prime contractor | Prime award | Amount | Awarded |
|---|---|---|---|
| RTX Corporation | N0001902C3003 | $458,185 | |
| RTX Corporation | N0001920D0013 | $367,920 | |
| RTX Corporation | N0001920D0013 | $10,008,269 | |
| Rolls-Royce Corporation | SPEFA121F0088 | $120,846 | |
| RTX Corporation | N0001923C0030 | $528,029 |
Latest 5 listed here. See the rest on GovTribe.
Similar vendors
| Vendor | Location | Primary NAICS |
|---|---|---|
| Acmt, Inc. | Manchester, CT | 336412 Aircraft Engine and Engine Parts Manufacturing |
| Ferrotherm, LLC | Garfield Heights, OH | 336412 Aircraft Engine and Engine Parts Manufacturing |
| Numet Acquisition Numet, Inc. | Orange, CT | 336412 Aircraft Engine and Engine Parts Manufacturing |
| Pratt & Whitney Military Aftermarket Services, Inc. | Oklahoma City, OK | 336412 Aircraft Engine and Engine Parts Manufacturing |
| Soldream Inc. | Vernon, CT | 336412 Aircraft Engine and Engine Parts Manufacturing |
About the company
Paradigm Manchester Inc., doing business as Pursuit Aerospace, a General Electric subsidiary, manufactures and repairs specialized F100 turbofan engine components for the U.S. Air Force and Defense Logistics Agency as a prime contractor on full-and-open, non-set-aside delivery orders, holding four indefinite-delivery vehicle contracts with the Air Force Sustainment Center collectively valued at over $60 million. The company operates as a for-profit manufacturer based in Manchester, Connecticut, with primary work in aircraft engine component fabrication, overhaul, and repair under NAICS 332992 (Aircraft Engine and Engine Parts Manufacturing).
Paradigm Manchester's customer base is heavily concentrated in Air Force sustainment logistics. The top five funding agencies account for 85 percent of awards by count: the Air Force Materiel Command (265 awards, $80.4 million combined potential value), the Air Force (184 awards, $335 thousand), the Air Force Materiel Command's Air Force Sustainment Center (160 awards, $188.4 million), Defense Logistics Agency Aviation (75 awards, $72.4 million), and the Navy's Naval Air Systems Command (34 awards, $123 thousand). The two rankings diverge on dollars — the Air Force Sustainment Center anchors most of the potential value ($188.4 million on 160 awards, or $1.2 million per award), while the broader Air Force Materiel Command command structure shows lower dollar-per-award density. Recent representative work includes a $927,638.60 firm fixed-price delivery order from the Air Force Sustainment Center (September 2024) for repair of F100-PW-220/229 engine augmentor combustion chamber liner assemblies; a $1.40 million undefinitized order from the Oklahoma City Air Logistics Complex (December 2023) for the same work; and a $373,140 order (April 2025) for repair of F100-PW-220/229 divergent nozzle segment seal assemblies. All work is performed at the Manchester facility with firm fixed-price terms and no set-aside designation.
Paradigm Manchester holds four prime IDVs with the Air Force Sustainment Center through single-award and multiple-award vehicles: a $14.66 million single-award contract (June 8, 2022) for F100-PW-220/229 combustion chamber liner assembly repairs running through June 8, 2027; a $31.46 million multiple-award contract (September 28, 2022) for F100-PW-220 convergent segment assembly overhaul and supply through September 27, 2027; a $7.52 million single-award contract (September 28, 2022) for F100-PW-220/229 divergent nozzle segment seal assembly repair and manufacture through September 27, 2027; and an additional IDV for divergent seal assembly overhauls valued at $2.6 million. The top parent vehicles by task-order count include an unspecified Navy-issued IDV (45 task orders, $161 thousand), an Air Force vehicle F3460102D0076 (39 task orders), Air Force vehicle FA810407D0020 (31 task orders, $52.8 million), and FA810405D0008 (30 task orders, $17.5 million).
Recent activity has grown from 13 awards in 2022 to 20 in 2025, with 12 awards in 2026 year-to-date. The recompete cliff is modest: 25 awards (combined potential value $5 million) face ultimate completion within the next twenty-four months. Paradigm Manchester operates as a subsidiary of Turbocombustor Technology, Inc., the parent entity. The vendor also performs subcontract work, subcontracting to RTX Corporation on F135 propulsion systems long-lead-time items and performance-based logistics work, and to Rolls-Royce Corporation on engine core, quick engine change assembly maintenance-repair-overhaul, and F137 ASPIRE components, though subcontract volume is minimal (2 percent of awards). Paradigm Manchester's work footprint is almost entirely focused on F100 turbofan engine sustainment — combustion chamber liners, divergent and convergent nozzle assemblies, and related seals and exhaust components — supporting F-15 and F-16 tactical fighter aircraft readiness.
Quick answers
Is Paradigm Manchester Inc. registered in SAM.gov?
Yes. Paradigm Manchester Inc.'s SAM.gov registration is active through May 12, 2027.
How much has Paradigm Manchester Inc. received in federal contracts?
Federal contracts obligated $526,783 to Paradigm Manchester Inc. in fiscal year 2025 and $4,907,947 in fiscal years 2023 through 2027.
How does Paradigm Manchester Inc. rank among federal contractors?
Paradigm Manchester Inc.'s parent company, General Electric Company, ranked #2 in PSC 28, #2 in NAICS 336412 and #4 in PSC J028 in FY2025.
What is Paradigm Manchester Inc.'s most recent federal award?
Paradigm Manchester Inc.'s most recent federal contract award is Repair of F100--PW--220/229 engine augmentor combustion chamber liner assembly support (FA812126F0135), from Air Force Sustainment Center (AFMC), on June 22, 2026.
On GovTribe
See Paradigm Manchester Inc.'s full federal record
- Federal contract awards
- IDV awards
- Subcontracting relationships
- Funding analysis by agency, NAICS and set-aside
- Similar vendors