National Electric Coil Co., L.P.

Brownsville, TX

UEI
N461RLJXN9S1
CAGE
6T7F6
Primary NAICS
335312 Motor and Generator Manufacturing
SAM.gov registration
Active through

Company facts

Self-certified in SAM.gov
  • For Profit Organization
Entity structure
Partnership or Limited Liability Partnership
SAM.gov registration date
Physical address
3330 E 14th St, Brownsville, TX 78521, USA
Founded
1917
Employees
251-1K
Estimated annual revenue
$10M-$50M
Industry
  1. Industrials
  2. Capital Goods
  3. Industrial Conglomerates
  4. Industrials & Manufacturing
SIC code
76 Miscellaneous Repair Services
Profiles

Registration and certifications come from SAM.gov and the SBA; company details from public web sources. Updated .

Contract obligations by fiscal year

Fiscal year Obligated
FY2027 To date $0
FY2026 $0
FY2025 $305,544

Contract awards

Contract subawards

Prime contractor Prime award Amount Awarded
Olsson Industrial Electric, Inc. LIBBY DAM UNIT 6 INSTALLATION Perform work on Unit 6 test stator sections, neutral current transformers, partial discharge analysis system, poles, collector… W912DW24C0010 $4,340,262

Similar vendors

About the company

National Electric Coil Co., L.P. is a small business manufacturer based in Brownsville, Texas, that specializes in the production and repair of electrical generator components for utility-scale applications. The company is SBA Certified as a HUBZone firm and maintains self-certification as a Small Disadvantaged Business, positioning it favorably for federal procurement opportunities in specialized manufacturing sectors. National Electric Coil Co., L.P. serves the federal government primarily through direct contracts with the U.S. Army Corps of Engineers, focusing on critical infrastructure maintenance and modernization initiatives for hydroelectric power facilities.

The company's federal contract portfolio demonstrates expertise in manufacturing and servicing high-specification generator components for large-capacity hydroelectric installations. Most notably, National Electric Coil Co., L.P. was awarded a $305,544 firm fixed-price contract in August 2025 by the U.S. Army Corps of Engineers, Portland District, to manufacture and deliver seven top stator bars for the Bonneville Powerhouse II facility in Oregon, with an optional line item for three additional units and a delivery deadline of March 31, 2026. The company also completed a $178,846 purchase order from the Army Corps of Engineers for Unit 2 stator winding repair and testing services at a Crofton, Nebraska location, which was fulfilled in 2021. Additionally, National Electric Coil Co., L.P. serves as a subcontractor to Olsson Industrial Electric, Inc., performing specialized work on Unit 6 test stator sections, neutral current transformers, partial discharge analysis systems, and associated generator components and assemblies. All prime federal contract awards to the company have been designated as Total Small Business Set-Asides under NAICS Code 335312 (Motor and Generator Manufacturing), reflecting the federal government's commitment to supporting small business participation in specialized manufacturing procurement.

SBA capabilities narrative

Stators

Testing, inspections and life assessments

Stator Rewinds

Core Restacks and Repairs, Partial or Complete

Parallel Ring Modifications

Main-Neutral Interchanges

Rewedges, Wedge Tightening

Through Bolt Retightening & Hardware Replacements

Field testing of large generators for confirmation of performance parameters

Full redesign of turbo/hydro generator stator core technology and execution of on-site or in-shop restacking after catastrophic failure or just for improvement of machine performance.

Analysis of stator frame structure and measures for eliminating deficiencies.

Theoretical calculations for rotor winding temperature change due to change in rotor coil insulation.

Calculations of stresses at normal and run-a-way speeds for hydrogenerators.

Full redesign of generator stator core technology and execution of on-site or in-shop restacking after catastrophic failure or just for improvement of machine performance.

Quick answers

Is National Electric Coil Co., L.P. registered in SAM.gov?

Yes. National Electric Coil Co., L.P.'s SAM.gov registration is active through August 20, 2027.

How much has National Electric Coil Co., L.P. received in federal contracts?

Federal contracts obligated $305,544 to National Electric Coil Co., L.P. in fiscal year 2025.

What is National Electric Coil Co., L.P.'s most recent federal award?

National Electric Coil Co., L.P.'s most recent federal contract award is Bonneville powerhouse II is procuring top stator bars which must match the construction and rating of the existing… (W9127N25CA066), from ENDIST Portland (USACE), on August 29, 2025.

On GovTribe

See National Electric Coil Co., L.P.'s full federal record

  • Federal contract awards
  • Subcontracting relationships
  • Funding analysis by agency, NAICS and set-aside
  • Similar vendors