This is a $4,052,611 firm-fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Pick Electric, Inc. to replace aging electrical components at the Libby Dam in Libby, Montana. The contract includes replacing the 125VDC and 24/48VDC electrical systems, upgrading the preferred AC system, and modifying the battery room. This work is intended to reduce safety risks and improve system reliability at the hydroelectric dam. The contract was awarded as a full and open...
This is a $1,753,983.00 firm-fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to Gardner Zemke Co, a small business subchapter S corporation, for the refurbishment of a three-phase Class II generator step-up transformer at the Libby Dam Powerhouse in Montana. The original contract opportunity was a sources sought announcement for small businesses, 8(a) firms, women-owned small businesses, service-disabled veteran-owned small businesses, and HUBZone companies to provide...
This $18,413,893.00 definitive, firm-fixed-price contract was awarded by the Bonneville Power Administration, a civilian federal agency, to Olsson Industrial Electric, Inc., a for-profit, foreign-owned company based in Springfield, Oregon. The contract is for the replacement, demolition, installation, and/or refurbishment of isolated phase bus sections at the Chief Joseph Dam in Bridgeport, Washington. This work was originally solicited through a pre-solicitation notice by the U.S. Army Corps of...
This is a $3,592,065.97 firm fixed-price definitive contract awarded by the U.S. Army Corps of Engineers to prime contractor Olsson Industrial Electric, Inc. for the LITTLE GOOSE STATION SERVICES TRANSFORMERS REPLACEMENT project. The contract involves the replacement of transformers at the Little Goose Dam facility in Dayton, Washington. Major subcontractors include Northbank Civil And Marine, Inc. for transformer cooling system replacement, Electrical Reliability Services, Inc. for low and...
This is a $163,233,922.66 firm fixed-price contract awarded by the Bonneville Power Administration, a civilian agency within the Department of Energy, to GE Renewables US LLC to rehabilitate and rewind 16 generator units at the Chief Joseph Dam in Washington state. The contract does not have a set-aside designation. Key aspects of the work include disassembling and reassembling the generators, removing and installing new stator windings, replacing generator air coolers, and installing a new...
This is a $17,848,028.05 definitive, firm-fixed price contract awarded by the U.S. Army Corps of Engineers to Olsson Industrial Electric, Inc. to perform electrical infrastructure modernization at the Robert S. Kerr Reservoir powerhouse. The work involves replacing aged and obsolete 15kV switchgear, 480V station service switchgear, unwatering/sump pumps and motors, transformer deluge containment, fire protection systems, governor kidney loop systems, and draft tube/spiral case valves. The...
This is a firm fixed-price purchase order contract awarded by the U.S. Army Corps of Engineers to American Governor Company, a subsidiary of Emerson Electric Co. White-Rodgers Division, for the LIBBY DAM SYSTEM CONTROL CONSOLE (SCC) REPLACEMENT project. The contract has a ceiling value of $84,415.84 and a completion date of December 31, 2020. No set-aside designation was used. American Governor Company provides automation solutions, including governors and related equipment, for power generation...
This is a $19,713,590.42 firm fixed-price contract awarded by the U.S. Army Corps of Engineers to Alstom Power Inc. for the rehabilitation of the Old Hickory Unit #4 generator. The contract does not utilize any set-aside designations. As a subsidiary of General Electric, Alstom Power Inc. has extensive experience providing power generation equipment and services to federal agencies. This contract award supports the Army Corps of Engineers' Civil Works program, which manages hydroelectric...
This is a $8,632,453.80 definitive contract awarded by the U.S. Army Corps of Engineers to GE Renewables US LLC, a subsidiary of General Electric Company, for the disassembly of Unit 5, repair of the rotor spider, finite element analysis, and turbine seal work. No set-aside was used. As a prominent federal contractor, GE Renewables has received numerous prime awards from agencies like the Bureau of Reclamation and Bonneville Power Administration to rehabilitate and maintain hydropower...
This is a $17,346,300.00 firm fixed price definitive contract awarded by the U.S. Army Corps of Engineers to Andritz Hydro Corp, an Austrian-owned company, for the UNITS 1-2 GENERATOR STATOR REWIND project at the Beaver Powerhouse in Eureka Springs, Arkansas. The work includes mobilization, testing, disassembly, inspection, replacement of stator cores and windings, refurbishment or replacement of components, reassembly, reinstallation, and testing. The contract has a 705 calendar day period of...