York Avenue Area Water Main and Streets Rehabilitation Project

Closed State & local contract opportunity Posted

Solicitation number
10227146
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of West Chicago is requesting sealed bids for the York Avenue Area Water Main and Streets Rehabilitation Project, with bids due July 28, 2026 at 11:00 a.m. CDT at the West Chicago Water Treatment Plant, Office of the Director of Public Works, 1400 W. Hawthorne Lane.

The scope encompasses roadway resurfacing, water main replacement, lead water service replacements, sewer repairs, and concrete flatwork across three corridors: York Avenue (between its west dead end and Oakwood Avenue), Garden Street (between Washington Street and Grand Lake Boulevard), and Ingalton Avenue (between Washington Street and Grand Lake Boulevard). Work items include pavement milling; hot-mix asphalt binder and surface course installation; 8-inch ductile iron water main and services installation; manhole structure repair and adjustments; sewer pipe spot repairs; intermittent Portland cement concrete curb, gutter, sidewalk, and sidewalk ramp removal and replacement with ADA panel installation; parkway and ditch restoration; and thermoplastic pavement markings.

The estimated project completion date is July 2, 2027. Bid documents are available through the City of West Chicago website at www.westchicago.org under "Bid Postings & Results" or through QuestCDN at www.questcdn.com for a $22.00 download fee (file size 41 MB). The primary contact is Dave Shah, P.E., City of West Chicago Office of Public Works, 630-293-2255 or DShah@westchicago.org.

Opportunity text

The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main replacement, lead water service replacements, sewer repairs, and concrete flat work. The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8 ductile iron water main and water main services installation, manhole structure repair and adjustments, sewer pipe spot repairs, intermittent PCC curb and gutter removal and replacement, intermittent PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein.