city of west chicago york ave area water main and streets rehab.pdf

PDF 55 KB Posted

Attached to
York Avenue Area Water Main and Streets Rehabilitation Project
Solicitation number
10227146
Issued by
Dupage County, Illinois

About this file

York Avenue Area Water Main and Streets Rehabilitation Project

This is a construction project solicitation issued by the City of West Chicago, Illinois for infrastructure rehabilitation in the York Avenue area. The project encompasses roadway resurfacing, water main replacement, lead water service replacements, sewer repairs, and concrete flatwork along York Avenue (between its west dead end and Oakwood Avenue), Garden Street (between Washington Street and Grand Lake Boulevard), and Ingalton Avenue (between Washington Street and Grand Lake Boulevard). Specific work items include pavement milling, hot-mix asphalt binder and surface course installation, 8-inch ductile iron water main and services installation, manhole structure repair and adjustments, sewer pipe spot repairs, intermittent Portland cement concrete (PCC) curb and gutter removal and replacement, intermittent PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway and ditch restoration, and thermoplastic pavement markings. The bid closing date is July 28, 2026 at 11:00 AM CDT, with bids to be received at the West Chicago Water Treatment Plant, Office of the Director of Public Works, 1400 W. Hawthorne Lane, West Chicago, Illinois 60185. The estimated project completion date is July 2, 2027.

Bid documents are available through the City of West Chicago website at www.westchicago.org under the "Bid Postings & Results" section or through QuestCDN at www.questcdn.com for a download delivery fee of $22.00, with a file size of 41 MB. Primary contact for the project is Dave Shah, P.E., with the City of West Chicago's Office of Public Works, reachable at 630-293-2255 or DShah@westchicago.org. No specific pricing information, set-asides, incumbent contractor details, or funding source documentation is provided in this solicitation notice.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Closing Date: Tue, 07/28/2026 11:00 AM CDT

Posting Type: Construction Project

Owner: West Chicago IL, City of

Solicitor: West Chicago IL, City of

QuestCDN Partner Posting

York Avenue Area Water Main and Streets Rehabilitation

Project Quest Number: 10227146

−Location Details

City: West Chicago

County: DuPage

State/Province: IL

Site Directions: The work is to be performed on and along

York Avenue, between its west dead end and Oakwood Avenue; Garden Street, between Washington Street and Grand

Lake Boulevard; and Ingalton Avenue, between Washington Street and Grand

Lake Boulevard.

−Project Details

Closing Date: Tue, 07/28/2026 11:00 AM CDT

Project Bid Received By &

Opening Information:

West Chicago Water Treatment Plant, Office of the Director of Public Works, 1400 W. Hawthorne Lane, West Chicago, Illinois, 60185

Est. Completion Date: July 2, 2027

−Project Description

Project Category Code: Manhole Rehabilitation, Water Main

(Repair/Replace) Rehabilitation, Sidewalks/Curbs/Gutters, Street/Road

Asphalt Resurfacing and Milling, Street/Road Asphalt Milling, Sewer and

Water Construction, ADA Curb Ramps, Pavement Resurface and Rehabilitation, Curbs, Paving (Asphalt or Concrete)

Description: The work as shown on the plans and as specified herein consists mainly of roadway resurfacing, water main replacement, lead water service replacements, sewer repairs, and concrete flat work.

Additional Description: The project includes, but is not limited to, the following items: pavement milling, hot-mix asphalt (HMA) binder and surface course installation, 8” ductile iron water main and water main services installation, manhole structure repair and adjustments, sewer pipe spot repairs, intermittent PCC curb and gutter removal and replacement, intermittent PCC sidewalk removal and replacement, sidewalk ramp ADA panel installation, parkway/ditch restoration, thermoplastic pavement markings and all incidental and collateral work necessary to complete the project as shown on the

Plans and described herein.

−Primary Contact Information

Owner Name: West Chicago IL, City of

Address: 475 Main St., West Chicago, IL - 60185

Phone: 630-293-2255

Contact: Dave Shah, P.E.

Email: DShah@westchicago.org

Solicitor Name: West Chicago IL, City of

Design Discipline: Soliciting agent

Address: 1400 W Hawthorne Lane, West Chicago, IL - 60185

Phone: 630-293-2255

Contact: Dave Shah, P.E.

Email: DShah@westchicago.org

−Project Document Information

Document Information: Bid documents are available at the City of

West Chicago website, www.westchicago.org, under the "Bid

Postings & Results" Section or on

QuestCDN at www.questcdn.com.

Quest EBidDoc™ Delivery

Info:

Download delivery fee is $22.00, file size is 41 MB .

Owner Details

Solicitor Details

Preview Download mailto:DShah@westchicago.org mailto:DShah@westchicago.org https://vw.questcdn.com/questvw/projects/prj_browse/prj_view_plans.html?jobNo=10227146 https://qcpi.questcdn.com/cdn/download/?project_id=10227146

File details come from the government source that posted it. Updated .