WS PIPELINE - CHILTON/KENNETH PHASE I PROJECT - Design Build Delivery Method

Closed State & local contract opportunity Posted

Solicitation number
RFP No. 3938
State
California
Responses due

Opportunity facts

Opportunity details come from bidnetdirect.com. Updated .

About this opportunity

The City of Glendale, through Glendale Water and Power, is seeking design-build proposals for the WS Pipeline - Chilton/Kenneth Phase I Project (RFP No. 3938), which involves designing and constructing approximately 11,745 linear feet of 8-inch diameter Class 350 ductile-iron water pipeline in Glendale, California. The project encompasses comprehensive infrastructure work, including installation of isolation valves, blow-off assemblies, air and vacuum release valve assemblies, fire hydrant assemblies, and customer service lines. Proposals are due by noon on Wednesday, June 5, 2024, following a mandatory pre-proposal meeting scheduled for May 22, 2024, via Microsoft Teams. The proposal evaluation will utilize a weighted scoring system: 45% for price and fees, 30% for design-build entity experience with similar water projects, 15% for project approach and schedule, and 10% for response completeness and quality. Proposers must be registered with the California Department of Industrial Relations and possess a Class A - General Engineering Contractor license, with a project completion timeline of 430 calendar days from the Notice to Proceed.

The procurement does not specify explicit set-aside designations for disadvantaged enterprises, but requires proposers to demonstrate significant municipal water infrastructure experience, including at least three recent similar projects with one completed as a design-build project for a municipal water provider. The project will be funded by City of Glendale Water and Power Department funds, with an engineer's estimated project cost ranging between $6,800,000 and $7,900,000. Liquidated damages are established at $1,800 per calendar day for delays. The solicitation includes both a "Base" proposal covering Locations A through H and an "Alternate" proposal for Locations I through K, with the City retaining flexibility to select either the base work or a combination of base and alternate work. Proposers must submit a "Reviewed" Financial Statement, though an "Audited" Financial Statement is not mandatory. The project will involve work within the City of Glendale and requires coordination with potential adjacent jurisdictional permits and regulations.

Opportunity text

The City, through Glendale Water and Power is soliciting proposals for the WS Pipeline - Chilton/Kenneth Phase I Project, in accordance with RFP No. 3938 from interested Design-Build Entities (DBEs) through a combination of Request for Qualifications (RFQ) process and Statement of Qualifications (SOQ) evaluations, and Project Bidding (Proposals). A Design-Build contract will be awarded to the most qualified DBE. The work generally includes the design and construction of approximately 11,745 linear feet of 8-inch diameter Class 350 ductile-iron water pipeline and installation of associated isolation valves, blow-off assemblies, air and vacuum release valve assemblies, fire hydrant assemblies, service lines to customers, and all required fittings and appurtenances at various locations throughout the City of Glendale. ***Downloading the FULL Request For Proposals Document: Please contact Cole Johnson at colemanjohnson@glendaleca.gov or call 818 296 7692 for access to the full RFP in PDF format. It is approximately 25 megabytes, and roughly 475 pages. This is highly adviseable for all Proposers wishing to submit an informed Proposal.*** ***Please see attached "Notice Inviting Proposals" for all requirements for successful proposal, including all categories listed on this website; Buyer Preferences, Guidelines and Requirements, and Bonding Requirements.***

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity