Water Management Renovations at Pocotaligo Preserve - Phase II

Closed State & local contract opportunity

Solicitation number
091726
State
South Carolina
Responses due

Opportunity facts

Jurisdiction
Points of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Beaufort County's Land Preservation Department is requesting proposals for water management renovations at Pocotaligo Preserve — Phase II, a tidal impoundment improvement project in Yemassee, South Carolina, with proposals due September 17, 2026, and a non-mandatory pre-proposal meeting and site visit scheduled for September 2 and 3.

The scope encompasses seven primary tasks: installation of double 36-inch corrugated aluminum pipes with flap gates and cross dike; installation of a new 32-foot by 5-foot by 18-inch Combahee-style rice trunk with riser and wooden bulkheads; retopping approximately 810 linear feet of existing dike with fill and creating a parallel circulation canal; repair of a 4-foot by 5-foot dike break with bulkhead; installation of a 36-inch aluminum pipe with 48-inch riser and flap gate on the southern dike; excavation of a circulation canal and berm construction; and replacement of existing concrete pipes with a 15-inch by 20-foot aluminum pipe. Work involves approximately 115 cubic yards of dike material, 1,080 cubic yards of cross-dike fill, 2,890 cubic yards of berm fill, and associated structural components including marine-grade treated lumber, stainless steel hardware, and marine anti-fouling paint. The contractor must provide all equipment, materials, manpower, and transportation; maintain designated construction and staging areas with safety fencing; and complete work during dry conditions with erosion control and one-year warranty.

Evaluation is qualifications-based with pricing weighted at 15 percent. Remaining criteria are understanding of scope and goals (25 percent), approach and project methodology (30 percent), and experience with similar projects including three references (30 percent). Individual task costs are assessed against budget thresholds; tasks may be removed if costs exceed available funds. Contractor must carry workers' compensation, general liability ($1 million per occurrence / $2 million aggregate), automobile liability ($500,000), umbrella liability ($2 million), and professional liability ($1 million). Proposals must remain firm for 90 days from closing and comply with Title VI nondiscrimination requirements and South Carolina state law.

Opportunity text

Beaufort County's Land Preservation Department is seeking qualified contractors to renovate several water management features located within and associated with impoundments on Pocotaligo Preserve. The property is located in Yemassee, South Carolina, and has entrances on US Hwy 17 and Cotton Hall Rd. This is phase 2, and the final phase, of a multi-staged design/build renovation process of these impoundments. The impoundments have reverted to a natural state due to dated water control structures and dikes, which are now tidally influenced. Phase 1 renovations have been completed, which included the installation of several pipes and berms that improve water exchange and drainage through the system. The goal of phase 2 renovations is to finish improving water exchange within and throughout the impoundments through additional pipes, structures, and circulation canals to achieve habitat objectives. Proposers should utilize the project information provided as the basis to clarify their proposals. The County has already obtained a Managed Tidal Impoundment General Permit from the U.S. Army Corps of Engineers for the proposed water management structure renovations. Any additional permitting will be completed by the County and their management consultant.

Contractor will provide all necessary equipment (excavators, trucks etc.), materials, manpower and transportation required for timely completion of project.

Contractor will utilize designated ingress and egress route(s) and construction and staging area for project. All refueling and routine equipment maintenance shall be done at the staging area. Staging area and construction site will be protected by appropriate safety fencing (standard orange mesh) along with appropriate signage. Equipment travel corridors shall be adequately marked for safety.

Trees and shrubs identified for removal (by flagging or painting) shall be removed and transported to a disposal area. Stumps, root balls, large roots and other woody debris (including chips and mulch) shall be removed from the project area during the process. Stump holes and other disturbed areas shall be filled and packed with offsite soil prior to final re-contouring. Organic material such as roots and stumps shall not be placed on the dike.

All unnatural material removed during the construction process will be loaded and taken to an offsite disposal area. Example of this material include asphalt, concrete, creosote lumber, metal debris, plastic debris, and old WCS.

At completion, all offsite fill on dikes and roadways to be sufficiently compacted to allow for immediate travel by vehicles and equipment. If fill material comes from the impoundment, then time will be given to allow the material to set and settle.

All work shall be done during dry conditions to prevent rutting and ground disturbance. This includes movement of heavy equipment, storage of materials, and other activities that could cause ground disturbance. Rutting and ground disturbance shall not be tolerated. Upon completion, disturbed soils will be seeded with an approved ground cover planting.

Silt fencing will be placed along disturbed areas of the dike to reduce erosion of bare earth during ground cover establishment.

If any archaeological resources or remains found, then work will be stopped and assessed by a professional archaeologist to be hired by the County.

Contractor will provide the names of 3 references for recent projects with in the past 5 years of similar scope including the names, email addresses, and phone numbers of those references.

If any individual task cost is beyond available budget, one or more tasks may be removed from scope of work.

All work shall be guaranteed for one year after the completion of the project.