This is a Scope of Work document for Phase 2 water management renovations at Pocotaligo Preserve prepared by Beaufort County's Land Preservation Department in Yemassee, South Carolina. The project involves seven primary tasks to renovate water management features within former inland rice fields and tidal impoundments. Task 1 requires installation of two 36" x 25' or 30' corrugated aluminum pipes with flap gates and construction of a 40' long cross dike with approximately 115 cubic yards of fill material and 11 cubic yards of rip rap. Task 2 involves installation of a new 32' x 5' x 18" Combahee-style rice trunk with a 5-6' riser, 20' wooden bulkheads, and associated hardware, while decommissioning the existing structure in place. Task 3 requires retopping approximately 810 linear feet of dike with 2 feet of fill (approximately 1,080 cubic yards) and creating a parallel circulation canal. Task 4 involves repairing a 4' long x 5' deep dike break in Tidal Field 1 with approximately 20 cubic yards of fill and a 25' bulkhead installation. Task 5 requires installation of a 36" x 30' aluminum pipe with a 48" x 5' aluminum riser and flap gate on the southern dike. Task 6 involves excavating a circulation canal and constructing a 1,250-foot berm requiring approximately 2,890 cubic yards of fill from the impoundment. Task 7 requires removal of existing concrete pipes and installation of a 15" x 20' aluminum pipe with 60 cubic yards of fill to raise a low-elevation crossing. All work shall utilize marine-grade treated lumber, stainless steel hardware, and marine anti-fouling paint for durability in wet conditions.
Contractor responses must include detailed per-task pricing breakdowns and complete Request for Proposal documentation for full consideration. The contractor must provide all necessary equipment, materials, manpower, and transportation for project completion, including designated ingress and egress routes, construction staging areas, and safety fencing. All work must be performed during dry conditions to prevent rutting and ground disturbance, with disturbed soils seeded with approved ground cover and silt fencing installed for erosion control. The document specifies that all work shall be guaranteed for one year following project completion and that contractors must provide three professional references for similar-scope projects. Material sources include adjacent canals, the impoundment, and approved offsite locations. The document was produced by Folk Land Management, Inc. and dated July 27, 2026, indicating this is a future-scheduled project requiring contractor qualifications for complex water management infrastructure work in sensitive wetland environments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
July 27, 2026
Scope of work for Phase 2 water management renovations at Pocotaligo Preserve, Beaufort County.
*As part of the total quote, prices should be broken down into per task price
*Request For Proposal (RFP) should have all parts completed to receive full consideration
Project Description: Beaufort County’s Land Preservation Department is seeking qualified contractors to renovate several water management features located within and associated with historic rice fields on Pocotaligo Preserve. The property is located in Yemassee, South Carolina, and has entrances off of US Hwy 17 and on Cotton Hall Rd (See attachment 1). This is phase 2 of a multi-staged renovation process of these former inland rice fields. The fields are broken and due to dated water control structures (WCS) and dikes, are now tidally influenced. The goal of phase 2 is to improve water management capabilities associated with the system to achieve the habitat objectives.
Task 1: Double pipes with flap gates and dike in inland field canal
Currently, there is a partially constructed dike in the inland field canal. This is the place of a former break in a cross dike. Two new 36” x 25’ or 30’ 14-gauge corrugated aluminum pipes will be installed, each with aluminum flap gates installed on the south side of the dike. The desired cross section of the complete dike will be approximately 40’ long x 16’ bottom width x 10’ top width with 2’ height of fill on top of the pipes. The fill can come from the canal adjacent to where the dike will be built. Approximately 115 cubic yards of material will be needed to build the complete dike. The built dike should match existing grades of surrounding dikes, or the southern dike can be raised to match the new grade following installation of pipes and fill placement. Approximately 11 cubic yards of rip rap will be placed on the upstream NW side to provide support during heavy storm runoff. (See attachment 3 and 4)
Specs:
- Two 36” x 25’ or 30’ 14-gauge corrugated aluminum pipes
- Two aluminum flap gates for the pipes
- Approximately 11 cubic yards of rip rap on the upstream NW side
- Approximately 115 cubic yards of material needed, this can come from the adjacent canals
Task 2: Install new rice trunk in center of cross dike
Existing structure: The existing structure shall be decommissioned in place by filling the culvert box with onsite material and entombing the entire structure within the existing dike.
Replacement Trunk: Install a standard 5’ x 32’x 18” with a 5-6’ riser Combahee style trunk with single side boards (4” width) and 3 paddle board pry bar lift at an adjacent site located in the embankment. The installation will include a 20’ bulkhead utilizing 3”x 10” lumber for cribbing boards and full length 3” x 10” Sloppy V puncheon boards. Bulkhead pilings are to be a minimum of 8” top and 25’ in length. Pilings shall be connected with either ¾” stainless cabling or all-thread rod. All wooden components used in both tasks shall be 2.5 CCA treated marine grade construction lumber and all metal fasteners shall be stainless steel. Any cut or untreated surfaces subject to long term inundation shall be treated with marine anti-fouling paint to reduce the risk of invasion by marine borers. Additionally, an aluminum riser cover with lock, and cable trunk door locks will be required to prevent public tampering and increase safety. (See attachment 5).
Specs:
- One standard sized 32’ x 5’ x 18” with a 5-6’ riser Combahee style rice trunk
- 20’ wooden bulkheads
- 2.5 CCA treated marine grade lumber
- Stainless steel hardware
- Aluminum riser cover with locks, cable trunk door lock
Task 3: Raise cross dike with fill from canal
Following installation of the rice trunk, the dike will be retopped. Trees and vegetation on the edge of the dike will have to be removed prior to retopping. This vegetative material can either be moved to an offsite location or mulched in place. The dike is approximately 810’ long, 18’ wide at the top, and 2’ of fill will be placed to raise the grade of the dike. This fill material will come from the eastern side of the dike with the purpose of also creating a circulation canal parallel with the dike. (See attachment 6)
Specs:
- Approximately 1,080 cubic yards of fill from the Tidal field 1 impoundment
Task 4: Repair break in dike
Task 4 is approximately 2,900’ east down an existing southern diversion dike in Tidal Field 1.
There is a break in the dike approximately 4’ long x 5’ deep x 15 wide. There is also a nonfunctional wooden structure that must be removed and disposed offsite. This break will be bulkheaded and plugged with fill to ensure sealing of the dike. This material can come from the adjacent canals or an offsite upland location. If fill is obtained from an offsite upland location it would need to be clean sand clay fill. The installation will include a 25’ bulkhead utilizing 3”x 10” lumber for cribbing boards and full length 3”x 10” Sloppy V puncheon boards. Bulkhead pilings are to be a minimum of 8” top and 25’ in length. Pilings shall be connected with either ¾” stainless cabling or all-thread rod. All wooden components used shall be 2.5 CCA treated marine grade construction lumber and all metal fasteners shall be stainless steel. Any cut or untreated surfaces subject to long term inundation shall be treated with marine anti-fouling paint to reduce the risk of invasion by marine borers. (See attachment 7)
Specs:
- Approximately 20 cubic yards of fill
- 25’ wooden bulkheads
- 2.5 CCA marine grade treated lumber
- Stainless steel hardware
Task 5: Install flashboard riser in middle of southern dike (before powerline)
Install a 36” x 30’ 14 gauge aluminum pipe with a 48” x 5’ aluminum riser with flap gate just before the powerline on the south diversion dike in Tidal Field 1. This structure should also have a locking aluminum cover on the riser and use aluminum flashboard riser boards. (See attachment 8)
Specs:
- One 36” x 30’ 14 gauge corrugated aluminum pipe with a 48” x 5’ aluminum riser
- One aluminum flapgate for pipe
- Aluminum riser boards
- Aluminum riser cover with lock
Task 6: Excavate circulation canal and use fill to widen existing dike
Following installation of the riser, an access dike is to be installed parallel to the existing south diversion dike leading back to cross dike separating Tidal Field 1 and 2. This berm will be built just outside the tree line of the trees located on the south diversion dike. It will have a 10’ top width x 15’ bottom width x a height that matches existing dike. This fill will come from Tidal Field 1 and also have the shared goal of creating a circulation canal. (See attachment 9)
Specs:
- 1,250’ berm creation: 10’ top W x 15’ bottom W x height that matches existing dike grade = 2,890 cubic yards of fill from impoundment
Task 7: Replace concrete pipe with new aluminum pipe and raise height of crossing
There is a pipe crossing that is low in elevation and experiencing some washout. The existing two concrete pipes will be removed and replaced with a 15” x 20’ aluminum pipe. The crossing will be raised 24” using approximately 60 cubic yards of upland fill. The grade should match the surrounding road (See attachment 10).
Specs:
- One 15” x 20’ 14 gauge corrugated aluminum pipe
- Approximately 60 cubic yards of upland fill
Project Considerations:
Contractor will provide all necessary equipment (excavators, trucks, etc.), materials, manpower and transportation required for timely completion of project.
Contractor will utilize designated ingress and egress route (s) and construction and staging area for project. All refueling and routine equipment maintenance shall be done at the staging area.
Staging area and construction site will be protected by appropriate safety fencing (standard orange mesh) along with appropriate signage. Equipment travel corridors shall be adequately marked for safety.
Trees and shrubs identified for removal (by flagging or painting) shall be removed and transported to a disposal area. Stumps, root balls, large roots and other woody debris (including chips and mulch) shall be removed from the project area during the process. Stump holes and other disturbed areas shall be filled and packed with offsite soil prior to final re-contouring.
Organic material such as roots and stumps shall not be placed on the dike.
All unnatural material removed during the construction process will be loaded and taken to an offsite disposal area. Example of these materials include asphalt, concrete, creosote lumber, metal debris, plastic debris, and old WCS.
At completion, all offsite fill on dikes and roadways to be sufficiently compacted to allow for immediate travel by vehicles and equipment. If fill material comes from the impoundment then time will be given to allow the material to set and settle.
All work shall be done during dry conditions to prevent rutting and ground disturbance. This includes movement of heavy equipment, storage of materials, and other activities that could cause ground disturbance. Rutting and ground disturbance shall not be tolerated.
Upon completion, disturbed soils will be seeded with an approved ground cover planting. Silt fencing will be placed along disturbed areas of the dike to reduce erosion of bare earth during ground cover establishment.
If any archaeological resources or remains found, work will be stopped immediately and assessed by a professional archaeologist.
Contractor will provide 3 references for recent projects of similar scope including the names, email addresses, and phone numbers of those references.
All work shall be guaranteed for one year after the completion of the project.
Produced by: Folk Land Management, Inc.
3515 White Hall Rd, Green Pond SC, 29446 Date: 7 / 15 / 2026
Attachment 3: Task 1 Cross Section – Install 2 Pipes with 2 Flap Gates and Build Cross Dike
Scale: 1” = 4’
Northwest Southeast
Proposed Bottom Width of Dike = 16’
36” 2’
Task 1 Pipe Installation: Install two new 36” x 25 or 30’ pipe with flap gates.
- 14 gauge corrugated aluminum pipe
- 2 aluminum flap gate for 48” pipe
Dike Installation:
- 16’ bottom W x 10’ top W x 2’ fill on top of pipes x 40’ L = 115 cubic yards of material
- Dike height should match existing dike grade or tie in with soft transition
- Material can come from adjacent canals
- Partial dike already built
Rip Rap Installation:
- Approximately 11 cu yards on upstream NW side
Proposed Top Width of Dike = 10’
New Dike
Rip Rap
Date: 7 / 15 / 2026
Attachment 4: Task 1 Cross Section – Install 2 Pipes with 2 Flap Gates and Build Cross Dike
Scale: 1” = 6’
Southwest Northeast Task 1 Pipe Installation: Install two new 36” x 25 or 30’ pipe with flap gates.
- 14 gauge corrugated aluminum pipe
- 2 aluminum flap gate for 48” pipe
Dike Installation:
- 16’ bottom W x 10’ top W x 2’ fill on top of pipes x 40’ L = 115 cubic yards of material
- Dike height should match existing dike grade or tie in with soft transition
- Material can come from adjacent canals
- Partial dike already built
Rip Rap Installation:
- Approximately 11 cu yards on upstream NW side
Flap Gates Installed on both sides
18”
Length of Proposed Dikes = 40’
2’
Existing Dike Existing Dike 36”
Attachment 5:Task 2 - Cross Section of a Combahee Trunk
Typical Dimensions of a full-size ‘Combahee’ Field Trunk Length of Trunk = 32ft, Width = 5ft Outside Height of Trunk-box = 2ft Inside height of Trunk-box = 18in Height of Uprights = ~11-12ft Height of Flashboard Riser = ~6ft
‘muzzle ’
‘trunk gate’ or ‘door’
- ‘trunk-box’ -
- f i e l d–d i k e s u r f a c e
20’ bulkhead installed on both sides of trunk
‘flashboard riser-box’
‘upright’
- ‘trunk-box’ -
‘gate ’ is typically set at 15° off vertical is typically set at 15° to trunk-box & door
‘spindle post’
‘lift boards ’ (2 or 3 per gate)
‘spanner board ’
Produced by: Folk Land Management, Inc.
3515 White Hall Rd, Green Pond SC, 29446 Date: 7 / 15 / 2026
Task 2: Rice Trunk Installation
- Remove existing wooden structure
- Install new standard 32’ x 5’ x 18” Combahee style rice trunk
- Install 20’ bulkheads on both sides of the dike to provide support to dike and structure
Date: 7 / 15 / 2026
Attachment 6: Task 3 - Cross Section Dike Retopping
Scale: 1” = 5’
West East
Retopping Width = 18’
Retopping Height = 2’
Task 3 Dike Retopping: Increase height by 2’ with fill from eastern side of dike and create a circulation canal in Tidal Field 1
- 810’ L x 18’ W x 2’ H = 1,080 approximate cubic yards of fill
- New canal dimensions = 7’ x 3-5’
Field Bed
New Canal Width = 7’
New Canal Depth = Average 3 - 5’
Berm = 7.5’
Existing Dike
New Canal
Date: 7 / 15 / 2026
Attachment 7: Task 4 – Repair Break in Dike
Scale: 1” = 4’
Northwest Southeast
5’
Task 4 – Repair Break in Dike
- Remove nonfunctional wooden water control structure
- 5’ L x 15’ W x 5’ H = Approximately 20 cubic yards of fill
- Fill can come from adjacent canals
- 25’ bulkhead
15’ Existing Dike Existing Dike
Bulkhead = 25’
(Birds eye view)
Date: 7 / 15 / 2026
Attachment 8: Task 5 – Install New Pipe and Flashboard Riser
Scale: 1” = 5’
South North
Pipe Length = 30’
Task 5 – Install new pipe and flashboard riser in existing dike
- 36” x 30’ 14 gauge aluminum pipe with a 48” x 5’ flashboard riser and flapgate
- Aluminum riser boards
- Aluminum riser cover with lock
Existing Dike
Pipe Height = 36” Riser Height = 5’
Tidal Field 1Southern Canal
Date: 7 / 15 / 2026
Attachment 9: Task 6 – Excavate Circulation Canal and Use Fill to Widen Existing Dike
Scale: 1” = 10’
South North
Height = match existing dike gradeExisting Dike
Width = 15’
New Circulation Canal
Task 6 – Excavate circulation canal and use fill to widen existing dike
- 1,250’ L x 15’ W x existing dike height = approximately 2,890 cubic yards
- Material to be excavated from Tidal field 1t to create circulation canal
New Circulation Canal
New Fill
Attachment 10: Task 7 – Pipe Replacement and Increased Road Height
3515 White Hall Rd, Green Pond SC, 29446 Date: 7 / 15 / 2026
Scale: 1” = 3’
Task 7 - Pipe Replacement:
- Remove existing 2 concrete pipes
- Install new 14 gauge corrugated aluminum 15” x 20’ pipe
Fill Placement: Set approximately 60 cu yards of fill on the pipe crossing and extending on either side of the road to bring grade up to surrounding road.
- Increase height by approximately 2’
Southwest Northeast
Existing Ditch Existing Ditch
New Fill
New Aluminum Pipe = 15” x 20’