Wastewater Treatment Plant Steam Boiler Replacement

Closed State & local contract opportunity

Solicitation number
2025-WWTP-065
State
Michigan
Responses due

Opportunity facts

Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

The City of Jackson is seeking qualified contractors to perform a Wastewater Treatment Plant Steam Boiler Replacement project through Request for Proposal #2025-WWTP-065. The procurement involves comprehensive removal and replacement of the existing boiler located in the maintenance garage, including a 100-gallon condensate receiver tank with alternating pumps, low-water shut-off, chemical feed pump taps, boiler vent piping, and steam piping lengths. Bidders must be prequalified for Plumbing and Boiler Maintenance (low pressure) and submit a lump sum pricing proposal covering all testing, inspections, permits, parts, and labor. The project requires a detailed three-line item pricing structure encompassing equipment removal, new equipment and parts, and associated labor, permits, and inspections. Bid security of 5% of the aggregate bid total is mandatory, and the response deadline is September 10, 2025, at 10:00 a.m. Eastern Standard Time. The replacement boiler specifications include a normal operating pressure of 50 psi for water and 15 psi for steam, with an output of 2,176,000 Btu/hour, and work is to be performed during normal business hours (Monday through Friday, 8 a.m. to 5 p.m.).

The contract includes comprehensive federal requirements related to HUD funding, with specific provisions for minority and women's business enterprises participation. Contractors must take affirmative steps to involve small, minority, and women-owned businesses and prioritize employment opportunities for low- and very low-income persons. The successful contractor will be required to provide performance, labor and material payment, and maintenance and guarantee bonds. Insurance requirements are extensive, with coverage levels varying based on contract value, including mandatory worker's compensation, general liability, and automotive liability insurance. While no specific incumbent vendor is mentioned, the project appears to be a critical infrastructure upgrade replacing an aged cast iron steam boiler system. Although a precise budget is not specified, the comprehensive bonding, insurance, and equipment replacement requirements suggest a significant municipal investment. The contract also falls under federal regulations, including compliance with Equal Employment Opportunity guidelines, the Copeland "Anti-Kickback" Act, Davis-Bacon Act, and Contract Work Hours and Safety Standards Act.

Opportunity text

The City of Jackson is accepting bids from qualified contractors for the removal and replacement of the existing boiler located in the maintenance garage of the Wastewater Treatment Plant. Bids shall include the removal and replacement of the existing boiler, 100-gallon condensate receiver tank with alternating pumps and low-water shut-off, chemical feed pump taps, boiler vent piping, and lengths of steam piping.

Files

File Type Posted
Wastewater_Treatment_Plant_Steam_Boiler_Replacement.pdf PDF
Weil-McLain_Boiler_Tag.jpg JPG image
Labor_and_Material_Payment_Bond.pdf PDF
Performance_Bond.pdf PDF
Maintenance_and_Guarantee_Bond.pdf PDF
CDBG_Additional_Forms.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity