US97 WIM SENSOR AND PAVEMENT REPLACEMENT PROJECT (Klamath Falls)
Open State & local contract opportunity Posted
- Solicitation number
- S-73000-00018466
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- Points of contact
-
- Joanne bosadminsupport@odot.oregon.gov (503) 986-3424
- Terri Sinclair-Olson terri.sinclair-olson@odot.oregon.gov (541) 530-9480
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Oregon Department of Transportation is soliciting bids under Invitation to Bid S-73000-00018455 for the US97 WIM Sensor and Pavement Replacement Project in Klamath Falls, with bids due December 10, 2026. Personnel installing the Weigh in Motion sensors must provide proof of training from manufacturer Intercomp Company, and all steel, iron, coatings, and specified manufactured products must meet State Buy America requirements under ORS 279C.303 with no de minimis exceptions.
On US97 northbound at milepost 272.23 and southbound at milepost 270.89 in Klamath County, the contractor will remove existing portland cement concrete and asphalt concrete pavement, install replacement sections and WIM equipment, apply permanent pavement markings, and provide temporary traffic control. ODOT furnishes eight WIM sensors, grounding kits, epoxy, and one pan-tilt-zoom camera, available 90 calendar days after award at a Bend, Oregon location. Traffic control supervisors must hold current Oregon Certified TCS cards, and automated flagger assistance devices must come from a qualified products list. Work must comply with MUTCD, crashworthiness standards under NCHRP Report 350 or AASHTO MASH, and the National Electrical Code. Single-lane closures are permitted on US97 from 7 p.m. to 7 a.m., Sunday night through Friday morning; all lanes remain open during daytime hours and holidays.
No dollar estimate is stated. The contract price will be determined from bid pricing, with unit-priced items paid on measured quantities. Performance and payment bonds are required, along with prevailing wage compliance at Oregon Bureau of Labor and Industries rates for Klamath County (BOLI Region 11). Insurance requirements include commercial general liability of $1 million per occurrence and $2 million annual aggregate, and commercial automobile liability of $1 million combined single limit. The term is 21 consecutive calendar days from the date the WIM system is taken out of service, with substantial completion on June 4, 2027 and final completion on June 27, 2027. Liquidated damages are $700 per calendar day past substantial completion, plus $500 per 15-minute interval per lane for closures beyond permitted limits. Erosion control, environmental protection, and emulsified asphalt tack coat carry no separate payment.
Jason Armstrong is the project manager, reachable at jason.l.armstrong@odot.oregon.gov or 541-883-5789. The listing's jurisdiction field names Jackson County, while the work is in Klamath County. The attachment titled 00018455 ITB.docx is summarized as a State of Oklahoma solicitation, so bidders should rely on the ODOT sample contract and exhibits for project terms.
Opportunity text
Remove existing PCC and AC pavement with new pavement sections, install Weigh in Motion equipment, permanent pavement markings and temporary traffic control along Hwy 97 NB MP 272.23 and SB MP 270.89 in Klamath County Oregon.
Files
| File | Type | Posted |
|---|---|---|
| 00018455 ITB.docx | DOCX document | |
| 00018455 ATT A Form A-2 Bid Pricing Form~2.xlsx | XLSX spreadsheet | |
| 00018455 Sample Contract.docx | DOCX document | |
| Exhibit 5 Specifications and Special Provisions).pdf | ||
| Exhibit 6 Plans~3.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity