Exhibit 6 Plans~3.pdf
PDF 5 MB Posted
- Solicitation number
- S-73000-00018466
- Issued by
- Jackson County, Oregon
About this file
Exhibit 6 Plans Summary
This document appears to be a planning exhibit or architectural drawing set related to a construction or facility project. The file contains detailed plans and specifications that serve as supporting documentation for the contract opportunity. The plans likely illustrate the scope of work, project specifications, site layouts, or technical requirements that bidders must review and understand to prepare accurate proposals. These exhibits are typically provided to establish clear expectations regarding the physical parameters, design standards, and construction or service delivery specifications that will govern the project execution.
The exhibit functions as a critical reference document for all prospective bidders, ensuring that all parties have access to identical baseline information regarding project requirements and site conditions. Bidders are expected to review these plans thoroughly before submitting responses, as the plans establish binding specifications and performance standards. Any discrepancies or questions regarding the plans should be addressed through the formal bidders' conference or written inquiry process established by the contracting agency to ensure uniform understanding and fair competition among all respondents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00018455 ITB.docx | DOCX document | |
| 00018455 Sample Contract.docx | DOCX document | |
| 00018455 ATT A Form A-2 Bid Pricing Form~2.xlsx | XLSX spreadsheet | |
| Exhibit 5 Specifications and Special Provisions).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE DALLES – CALIFORNIA HIGHWAY
KLAMATH COUNTY
SB LOCATION
NB LOCATION
Jeff Shambaugh Date: 2026.11.02 08:48:37 -08'00'
Median Travel Lane Travel Lane Var’ Right Shoulder Left Shoulder
3” cold plane pavement removal - CPPR
ACP Base Course Level 3, ½” PG 64-28
Nom. thkn – 8”
- 2” 3rd lift
- 3” 2nd lift
- 3” 1st lift
ACP Wearing Course Level 3, ½” PG 64-28 thkn – 3”
Typical Paving – US97
• Not to Scale
• For more detail on saw cut and removal area see sheet BB02 & BB03
Saw Cut width See BB02
CPPR See BB02
Saw Cut
Saw Cut
12” Aggregate
5” cold plane pavement removal - CPPR
Sheet BB01
Extg PCC Pavement.
CPPR width See BB02
The relative location varies NB vs SB. The removal of PCC will include the width of existing PCC and nominal sections of existing AC pavement. For more details see BB02
SB PCC relative location
NB PCC relative location
Existing PCC is anticipated to be between 9-11 inches thick.
NB PCC
30ft
15ft
As located (ft)
SB
NB
5”
CPPR
5”
CPPR NB
Extg PCC 30ft
5” CPPR
3” CPPR Pavement Removal
Area
(PRA)
US97 NB Location MP 272.23
SB PCC
30 ft
NB
SB
US97 SB Location MP 270.89
5”
CPPR
5”
CPPR
30 ft Extg PCC
15ft
Sheet BB02 For more detail see sheet BB01
For more detail see sheet BB01
Median
Median
In affected area, remove and replace existing rumble strip in-kind.
At NB location remove existing PCC, bases, and misc.
structures to subgrade from median to min. of lane 14 ft wide or 2ft outside the edge of PCC over distance of PCC
At SB location remove existing PCC, bases, and misc.
structures to subgrade from median lane line to outside edge of the PCC pavement.
(min. 6” removal of extg. AC along median edge)
3” CPPR Pavement Removal
Area
(PRA)
5” CPPR
At NB location 3” CPPR 1ft to into the median and 3ft into right shoulder, over length of pavement removal, and 30 ft beyond both ends of the area of removal.
At SB location 5” CPPR that matches the width of removal and 15ft beyond each end of removal.
Cold Plane Pavement Removal - CPPR
Lengths and widths shown are approximate, final length, width, and areas will be field located by
ODOT staff.
At NB location 5” CPPR that matches the width of removal and 15ft beyond each end of removal.
As located (ft)
At NB location 3” CPPR 3ft to into the median and 1ft into right shoulder, over length of pavement removal, and 30 ft beyond both ends of the area of removal.
15ft
15ft
Not to scale
Not to scale
Misc. PCC.
Str.
At NB & SB locations remove existing misc. structures in the
AC shoulders. Where these structures are outside the saw cut perimeter of the PRA, back fill with 6” AC (2 equal lifts) and 17” of aggregate base.
Misc.
other. Str.
Subgrade
Subgrade geotextile
18" SUBGRADE STABILIZATION
1. As directed, the 18" subgrade stabilization may be omitted if subgrade is firm and unyielding.
2. Excavate to a depth of 18" below subgrade.
3. Replace with 18" of stone embankment subbase prior to placement of aggregate base.
For surfacing details see sht. 8801
Subgrade
Subgrade geotextile
Stone embankment subbase Nam. comp. thkn. - 18"
BB03
hwye97v Rectangle
2026.10.28 13:41:31 -07'00'
2026.10.28 13:31:22
2026.10.27 15:27:25
2026.10.27 15:27:48
2026.10.27 15:28:05
2026.10.27 15:28:24
2026.10.27 15:28:41 the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2026 - May 31, 2027
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM700
CONDUIT TRENCHING
GENERAL
T M
.d g n
01-2025
10-JAN-2025N/A
J A
N
2" Bedding
2" Cover
30"
24"
18"
18"
Thickness, Whichever Is Greater
6" Min. Or Match Existing Surface
Conduit
CLSM
Conduit
Non-Metallic
Metallic
Roadway & Shoulders Other AreasType Of Conduit
Or Upper Limit Of Excavation
Subgrade, Surrounding Ground, Top Of Trench, Bottom Of
When Using Rigid Metallic Conduit)
Sand Blanket (May Be Omitted
Top Of Existing Surface
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
under sidewalk, landscaped areas, etc.)
UNSURFACED AREAS (new roadway prior to paving, shoulders, 6" (Nominal)
Top Of Finished Surface
For The Entire Length Of The Conduit Run
Center Underground Marking Tape Over Conduit
MINIMUM COVER FROM FINISHED SURFACE
(Use Permit Depth If Greater Than These)
Minimum Cover From Top of Finished Surface
Minimum Cover Table)
Minimum Cover (See
Minimum Cover Table)
Minimum Cover (See
Optic Hand Hole As Per TM702, The Minimum Cover Depth Is 24 Inches.
2. For Non-Metallic Conduit Under Roadway & Shoulders Installed Horizontally Into Fiber
More Information.
To Accommodate The Minimum Radius ("R") Of The Conduit Elbow. See TM701 For
1. Additional Cover Depth May Be Necessary Near Foundations And Junction Boxes
Notes:
Than 6" According To 00405.46(C)(2).
Material. Compact Material In Layers Not Greater
Selected Granular Or Selected General (Native)
Along The Boundaries Of The Area To Be Removed
With An Approved Pavement Cutting Saw 2" Minimum Depth
When Excavating, Cut Sharp And Well Defined Pavement Edges
Finish To A Smooth Riding Surface.
00745, 00755, And 00756, As Applicable.
Compact Material According To 00744, Match Existing Surface Material: PCC Or ACP
6. Furnish Backfill Materials According To 00960.10
5. Do Not Backfill Trenches Until Inspected By The Engineer
4. Hold Trench Width To A Practical Minimum
Place All Conduit Before Paving Or Landscaping.
3. Excavate According To 00960.40. In Areas To Be Paved Or Landscaped, Changed To Avoid Obstructions.
2. Conduit Runs Shown On Plans Are For Bidding Purposes Only. Locations May Be
1. Install Conduit By Open Trench Method, Horizontal Directional Drilling, Or As Shown
General Notes:
(See Note 2)
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
EXISTING PAVED AREAS
NEW DRAWING (CONTENT FROM RETIRED TM471)
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2026 - May 31, 2027
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM701
T M
.d g n
NEW DRAWING (CONTENT FROM RETIRED TM470 & TM471)01-2025
13-JAN-2026N/A
J A
N
Future Use (No Wires/Cables In Conduit). Leave 6 Feet Of Slack Pull Line.
6. Install Polyethylene Pull Line In All Conduits Noted On The Plans For
Poles, Cabinets Unless Otherwise Shown.
5. Leave A Minimum Of 2 Feet Slack In Each Wire And Cable In Junction Boxes,
4. Tape The Ends Of Unused Conductors With Insulated Vinyl Plastic Tape.
Common Wire Nut Unless Otherwise Shown.
And Install A Wire Nut. Do Not Join Multiple Locate Wires Under A All Conduits As A Locate Wire. Leave Slack As Shown Or Directed
3. Install No. 16 AWG TFFN Orange Base With Blue Tracertone Wire In
Unless Otherwise Shown.
Handheld Labeler (Brady M210 Label Maker With Vinyl B-595 Tape)
2. Label Wires And Cables With Permanent Tags As Shown Or Directed. Use
To Specification Section 00990 Bid Items.
1. See TM470 For Additional Wire/Cable Installation Requirements That Apply
Wire & Cable Installation General Notes:
LUBRICANT
Wires And Cables In Conduit Use Electrical Lubricants When Inserting
Pulls Are Made With Poles Or Controller Cabinets In Place
* Use A Pulley Device To Achieve A Straight Line If
Terminating End Points For Pulling Only Binding Material) Allowed Only At The Wire (Tapes, Straps, Ties, Or Other Temporarily Bundling Cables Or
The Conduit Opening* Pull In A Straight Line With
Cables By Hand Only Pull All Wires And
WIRE & CABLE INSTALLATION IN CONDUITS
CONDUIT INSTALLATION IN JUNCTION BOXES
CONDUIT INSTALLATIONS IN FOUNDATIONS
Junction Box
2" Min. To 3" Max.
Fiberglass Conduit Elbow
(Direction Of Conduit Run)
Plumb)
(Install
PVC Riser
Of The Conduit Run
Near The End Wall From The Direction
Enter Through The Bottom Of The Box
Conduit (Size As Shown On Plans).
2" Min. To 3" Max.
Fiberglass Riser (Install Plumb)
Foundation
Concrete
Fiberglass Elbow
Elbow
Fiberglass
Shown On Plans)
Conduit (Size As
Shown On Plans)
Conduit (Size As
Coupling
Coupling
Top Of Foundation
JB3 34"
JB2 18"
JB1 12"
From End Wall
2" To 3" Typ.
Diameters
Of Conduit
Max. Sum
Box Type
Junction
If Max. Sum Of Conduit Diameters In Junction Box Is Not Exceeded.
2. Larger Conduit Than Specified May Be Used At The Option And Cost Of The Contractor
Between Any Pole, Junction Box, Or Cabinet.
1. Install Non-Metallic Conduit Unless Otherwise Shown. Conduit Runs Shall Be Continuous
Conduit Installation General Notes:
Beyond Foundation
Conduit 10" To 12"
Extend Fiberglass
R
R
Diameter
Conduit
Coupling
Manufacturer's Recommendation.
Weld To Connect Conduit As Per
Full Circumference. Use Solvent
Conduit Ends Fit Together For Their
Make Cuts Square And True So
Non-Metallic Conduit
CONDUIT ENDS AND BUSHINGS
CONDUIT ELBOWS
CONDUIT COUPLINGS
3" Min.
Plug
Conduit
Foam
Wiring (Or Pull Line) Is Installed
Install Foam Conduit Plug After For Future Use Only)
(Or Pull Line in Conduit
Cables/Wires
R (min.)
Fiberglass Riser (In Foundations)
PVC Riser (In Junction Boxes) Or
1/2" To 1" Above Conduit Bushing
Diameter
Than Riser
" Larger1/2
Before Installing Wire
End Bell Conduit Bushings
Install Push-On PVC
3" 18"
2 1/2" 15"
2" 12"
1 1/2" 10"
Size Conduit For The Entire Length, Outlet To Outlet.
1. Slip Joints, Running Threads Or Reducing Couplings Not Allowed. Use The Same
Notes:
2. Temporarily Plug Or Cap Conduit Ends At All Times To Keep Debris Out
1. Ream Conduit Ends To Remove Rough Edges And Burrs
Notes:
Manipulation, Or Cutting In The Field)
(No Crimping, Flattening, Field
Standard Factory Fiberglass Bend
INSTALLATION
CONDUIT & WIRE/CABLE
GENERAL
01-2026 DELETED APPLICABILITY LANGUAGE IN CONDUIT IN FOUNDATIONS DETAIL
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: December 1, 2026 - May 31, 2027
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM702
T M
.d g n
NEW DRAWING (CONTENT FROM RETIRED TM472)01-2025
11-JUL-2025N/A
J U
L
INSTALLATION
JUNCTION BOX/HAND HOLE
GENERAL
SIGNALS
S
S
A
2"
S
SECTION A-ASECTION B-B
TANDEM JB/3A JUNCTION BOX DETAILS
B
B
DIMENSION TABLE
D
LW
SI
GNALS
COVER DETAILS
JUNCTION BOX
To Secure Cover Or Hex Head Bolts Steel / Brass "L" Bolts Use Two Stainless
S
(See Std. Dwg. TM570 And TM571)
Type 1, Type 1U, Or Type 2 Delineator
PCC Apron
JUNCTION BOX INSTALLATION IN PCC SIDEWALK
Hand Hole
Junction Box Or
HAND HOLE IN UNSURFACED AREA
DELINEATION OF JUNCTION BOX &
S
IG
N A
LS
S
S
IN UNSURFACED AREA
JUNCTION BOX INSTALLATION
Chamfer (Typ.)
45 Degree
PCC Apron
2"
"12"
31/2"
"1/23
PCC Apron
12" Junction Box Cover
(See Note 4)
Crushed Rock
3/4" - 0"
12" Min.
3 1/2"
EdgeOfSidewalkOrEdgeOfRamp
2'-0"Min.OfSoftscapeFrom
SoftscapeAsShown
Sidewalk
PCC Junction Box Apron
Paved Shoulders, Or Other Areas Exposed To Traffic.)
Behind Guardrail, Etc. Do Not Install In Travel Lanes, Located In Incidental Travel Areas; Gravel Shoulders, (This Detail Only Applicable for Junction Boxes
Sidewalk
Back Of Sidewalk
Mi n.
Mi n.
TravelLane
Face Of Curb
Dirt Or Soil
Junction Box Cover
(See Note 4)
3/4" - 0" Crushed Rock
Compacted Backfill OrSidewalk
2"
(See Note 4)
Crushed Rock
3/4" - 0"
12" Min.
Flat Areas Of Sidewalks. Do Not Install In Slopes Of Ramps Or Driveways) (This Detail Only Applicable for Junction Boxes Located In
Sidewalk Surface PCC Apron Or
Cables In The Other JB/3 Detector And Interconnect Wiring In One JB/3 And Install Signal And Illumination The Controller Cabinet In The Tandem JB/3 Nearest
4"
Sufficient Coverage To Produce A Firm Unyielding Surface. Do Not Install Conductors Until Surface Has Been Constructed.
4. Use Materials According To 00640.10 and 00640.16. Use Compaction Equipment Suitable For Area And Compact Each Six Inch Layer With
3. More Junction Boxes And Hand Holes Than Specified May Be Installed To Facilitate The Work At The Option And Cost Of The Contractor
And No More Than 1000 Feet Apart For Hand Holes.
2. Install Junction Boxes And Hand Holes At The Approximate Locations Shown, Or If Not Shown, No More Than 300 Feet Apart For Junction Boxes
Or Shoulder, Leave The Top Of The Hand Hole 1/2" Below The Pavement Surface.
1. Install Top of Junction Box And Hand Hole Flush With The Sidewalk, Surrounding Grade, Or Top Of Curb. For Hand Holes Installed In The Roadway
GENERAL NOTES:
Type* L W D
12"
12"
12"
17"
12"
10"
30"
22"
17"
JB3
JB2
JB1
HH-3
HH-2
HH-1
30"
30"
24"
48"
48"
30"
36"
24"
24"
Type As Shown On Plans
*Junction Box Or Handhole
Or Max. 3/8" Lift Hole With Recessed Lifting Eye Junction Box Cover
Lift Eye
Behind Box
3'- 0" Max.
Reading, "JCT. BOX"
3" B Font Text
White Target With Black
Systems (Letter Height 1" Min.)
Or "ELECTRICAL" For ITS/Misc. Electrical "ILLUMINATION" For Illumination, "SIGNALS" For Traffic Signal, Cover To Be Marked
TOP VIEW
FIBER OPTIC CABLE HAND HOLE INSTALLATION
For Nut, Typ.
Recess In Cover Secure Cover.
(Hex Head) To Steel Bolts 304 Stainless Use Two Type
"FIBER OPTICS" (Letter Height 1" Min.)
Polymer Concrete Cover. Cover To Be Marked
Coil As Shown
Hand Hole Polymer Concrete
3 1/2"
PCC Apron* 12"
12"
2"
12" Min.
SIDE VIEW
Elbows Not Required In Hand Holes.
For Conduit Ends and Bushings), Typ.
For Cover Depth Exception & TM701 PVC or HDPE Conduit (See TM700 (See Note 4)
3/4" - 0" Crushed Rock
Coil As Shown
Grout Non-Shrink With Non-Epoxy Penetrations Seal Conduit
3"
3"
3" Min.
07-2025 REVISED FIBER OPTIC CABLE HAND HOLE INSTALLATION DETAIL
S
PCC Apron*
Chamfer (Typ.)
45 Degree
"1/23
Located In Driveable Surface Or As Shown *Install PCC Apron When Hand Holes Are
12" Max.
| BA_PvmtDetails_Cover |
| BA_PvmtDetails_Klamath Falls WIM Sites |
| EA01 |
| EA02 |
| KA01 |
| KA02 |
| KB01 |
| KB02 |
| KB03 |
| TM500A |
| TM500B |
| TM670 |
| TM671 |
| TM700 |
| TM701 |
| TM702 |
| TM800 |
| TM820 |
| TM821 |
| TM822 |
| TM855 |
File details come from the government source that posted it. Updated .