US-56 Corridor Management Project (2026)
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for pedestrian and bicycle paths construction on Main Street and Russell Avenue in the City of Wakeeney, Trego County, with proposals due August 19, 2026 at 1:00 p.m. Local Time through Bid Express; bids open at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Only prequalified contractors may bid, a capability filter that eliminates unvetted competitors. The project spans 0.433 miles and includes clearing...
- The Kansas Department of Transportation is requesting bids for pedestrian and bicycle paths construction in the City of Sedgwick in Harvey County, with electronic proposals due August 19, 2026 at 1:00 PM Local Time via Bid Express, and bids opening and reading at 3:00 PM the same day at the Eisenhower State Office Building in Topeka. The scope encompasses 0.08 miles of pedestrian and bicycle paths west of North Commercial Avenue from 5th Street to 6th Street, including site clearing and...
- Kansas Department of Transportation (KDOT) is requesting bids on a bridge replacement and grading project in Miami County (located 1.5 miles south and 1.8 miles west of New Lancaster), with proposals due August 19, 2026 at 1:00 p.m. local time via Bid Express. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date. The scope includes bridge replacement over Middle Creek (total project length 0.142...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on K-61 in McPherson County, with electronic proposals due August 19, 2026 at 1:00 P.M. Local Time via Bid Express. Prequalified contractors only are eligible to bid — this is a mandatory eligibility filter. The project covers repair and reconstruction of Bridge 100 (0.19 miles east of the K-153 Spur) and Bridge 102 (US-81 ALT, at the junction of US-81 ALT/K-61) over a project length of...
- The Kansas Department of Transportation is soliciting sealed bids for chip seal application on US-77 in Cowley County from the north city limit of Winfield to the junction of K-15, a total net length of 9.821 miles, with bids due August 19, 2026. The scope includes surface preparation, application of asphalt emulsion, and placement of aggregate chips on the designated highway section. Pricing is submitted on a unit-price basis. The contract will be awarded to the lowest qualified bidder...
- The Kansas Department of Transportation (KDOT) is requesting bids for grading, bridge, and surfacing work on I-70 Bridge 002 over Milford Lake Road in Geary County, with proposals due August 19, 2026 at 1:00 p.m. through the Bid Express website and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The project...
- The Kansas Department of Transportation is seeking sealed bids for Portland Cement Concrete Pavement (PCCP) patching on Interstate 135 in Sedgwick County, with bids due August 19, 2026 at 1:00 p.m. local time through the Bid Express electronic bidding system. The scope covers 3.760 miles of mainline, acceleration/deceleration lanes, and ramps from the HMA/PCCP joint south of 47th Street north to the bridge over Pawnee. Work includes 4,710 square yards of full-depth PCCP patching (11-inch), 335...
- The Kansas Department of Transportation (KDOT) is soliciting electronic bids for chip seal surface treatment on a 9.369-mile section of US Route 36 in Norton County, with proposals due August 19, 2026 at 1:00 p.m. local time and opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified and registered as bid holders on KDOT's website no later than 5:00 p.m. on the Monday preceding the letting date (August 18, 2026). All contractors and...
- The Kansas Department of Transportation is requesting sealed bids for chip seal surfacing on two roadway segments in Comanche County under a project combining US-160 KA 8032-01 (Clark/Comanche County Line to Comanche/Barber County Line) and US-160 KA 8033-01 (Kansas/Oklahoma State Line to US-160/US-183 junction), with a combined net length of 49.252 miles. Bids are due August 19, 2026. The scope encompasses surface preparation, chip seal material application, and associated work required to...
- The State of Kansas Department of Transportation is soliciting bids for microsurfacing (modified slurry seal) treatment on US-160 in Harper County, with bids due August 19, 2026. The project extends 11.478 miles from the east corporate limits of Harper to the Sumner County corporate line. The scope consists of applying micro seal treatment to the specified corridor. Place of performance is US-160 between Harper and Sumner County in Kansas. No contract value, contract term, pre-bid meeting...
The City of Baldwin and Douglas County, Kansas are soliciting bids for the US-56 Corridor Management Project, involving pavement widening, side street realignment, storm sewer and culvert construction, and sidewalk improvements in Baldwin City, with bids due September 30, 2026. The scope encompasses approximately 10,831 cubic yards of earthwork; 3,281 tons of HMA commercial-grade (Class A) pavement; 1,327 square yards of 6 & 8 concrete pavement (AE); 4,863 linear feet of concrete curb and gutter; 1,429 linear feet of storm sewers; pavement markings (various types); and permanent signing installation. Work is located in Baldwin City, Douglas County. No estimated contract value, contract term, incumbent contractor, set-aside or preference program, evaluation criteria, pre-bid meeting date, or question deadline is identified in the available source material.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Baldwin.pdf | 392KB | 8/18/26 |