US 395 Culvert Repair Valley Falls - Lakeview Project
Closed State & local contract opportunity Posted
- Solicitation number
- S-73000-00010366
- State
- Oregon
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- Points of contact
-
- Micah Lederer r4admin@odot.oregon.gov (541) 388-6180
- Dave Dethloff william.d.dethloff@odot.oregon.gov (503) 569-8793
- Joanne bosadminsupport@odot.oregon.gov (503) 986-3424
Opportunity details come from oregonbuys.gov. Updated .
About this opportunity
The Oregon Department of Transportation (ODOT) is soliciting bids for the US 395 Culvert Repair Valley Falls - Lakeview Project, a infrastructure rehabilitation contract located in Lake County. The procurement involves supplying materials, equipment, labor, and incidentals to provide traffic control at 8 culvert locations and install 8 Cured-in-Place Pipe (CIPP) liners along the Freemont Highway. Specific deliverables include traffic control management, installation of culvert markers, mainline video inspection, and rehabilitation of 18", 24", and 36" culverts ranging from 56 to 96 linear feet. Bidders must have a valid Oregon Construction Contractors Board license and will be evaluated based on submitting the lowest total bid price. The bid submission deadline is July 9, 2024, at 10:00 AM through the OregonBuys eProcurement system, with substantial project completion required by October 18, 2024, and final completion by November 1, 2024. Liquidated damages of $600 per calendar day will be assessed for failure to achieve substantial completion by the specified date.
The contract opportunity does not explicitly mention specific set-aside designations or restrictions for disadvantaged enterprises. Preliminary bid results indicate six contractors submitted bids, with bid amounts ranging from $267,030 to $370,880. Iron Horse LLC appears to be the apparent low bidder with a total bid of $267,030. The project is subject to State Prevailing Wage Rates and domestic preference requirements under ORS 279C.303. Aggrieved bidders have 5 calendar days from the intent to award date to file a protest. While specific funding sources are not detailed in the documents, the project is being procured by ODOT for infrastructure improvements in Lake County. No incumbent vendors or existing technology integration requirements were identified in the procurement documents.
Opportunity text
This project is located on US 395 (Freemont Highway) and consists of supplying the materials, equipment, labor and incidentals to provide traffic control at 8 culvert locations, installation of 8 CIPP liners per plans, perform any additional or incidental work as called for by the contract plans or specifications as directed.
Files
| File | Type | Posted |
|---|---|---|
| ITB_PW_Final~7.docx | DOCX document | |
| Attachment A (Plans)~10.pdf | ||
| Attachment B (Special Provisions and Specifications).docx | DOCX document | |
| 00010366 Intent To Award.xlsx | XLSX spreadsheet | |
| 00010366 Preliminary Results.xlsx | XLSX spreadsheet | |
| Attachment C (Bid Pricing Form)~7.xlsx | XLSX spreadsheet | |
| Sample Services Agreement~8.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity