- Kansas Department of Transportation is requesting bids for Ultrathin Bonded Asphalt Surface (UBAS) and chip seal work on US-36 in Jewell County, with electronic proposals due September 16, 2026 at 1:00 p.m. local time through Bid Express. Contractors must be prequalified with KDOT and must notify the department of intent to bid by 5:00 p.m. on the Monday preceding the letting date. The scope spans 5.624 miles of US-36 from 4.632 miles east of the US-36/K-14 East Junction to the Jewell/Republic...
- The Kansas Department of Transportation is requesting bids on milling and hot mix asphalt overlay work on US-36 in Decatur County spanning 10.974 miles from the Rawlins/Decatur County line east to the US-36/US-83 junction under contract KA 8054-01, with proposals due September 16, 2026 at 1:00 PM local time. Bidding is restricted to prequalified contractors. Contractors must notify KDOT of intent to bid by 5:00 PM on the Monday preceding the letting date and submit electronic proposals through...
- The Kansas Department of Transportation (KDOT) is requesting electronic bids for milling and hot mix asphalt overlay work on US-36 in Cheyenne County from the Colorado/Kansas state line to Road 11, spanning 10.150 miles, with proposals due September 16, 2026 at 1:00 p.m. Local Time via Bid Express and bids to be opened at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and must identify themselves as bid holders on KDOT's...
- The Kansas Department of Transportation is requesting bids for milling and hot mix asphalt overlay on K-266 in Republic County, spanning 7.541 miles from the K266/US36 Junction north to the North Route Terminus, with proposals due September 16, 2026 at 1:00 p.m. Local Time through the Bid Express website and bid opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Tax Clearance Certificate from the...
- The Kansas Department of Transportation is requesting bids on chip seal surfacing for US Route 36 in Washington County, spanning 9.176 miles from the eastern city limits of Washington to the Little Blue River Bridge, with proposals due September 16, 2026 at 1:00 p.m. local time. Contractors must be prequalified with KDOT and hold a current Tax Clearance Certificate from the Kansas Department of Revenue. Bidders must notify KDOT of intent to bid as a prime contractor by 5:00 p.m. on the Monday...
- The Kansas Department of Transportation is requesting bids for milling and Hot Mix Asphalt overlay work on US-36 in Rawlins County, with proposals due September 16, 2026 at 1:00 p.m. local time via Bid Express. This is a federally funded Federal-Aid Highway Program project. The scope covers 16.216 miles of US-36 from the east end of Portland Cement Concrete Pavement in Atwood east to the Rawlins/Decatur County line (project KA 8053-01). Work includes milling of 39,802 tons, HMA overlay of 33,200...
- The Kansas Department of Transportation is requesting electronic bids for grading and bridge construction over Ladder Creek in Wallace County, 3.5 miles south and 3.0 miles east of Weskan, with proposals due September 16, 2026 at 1:00 p.m. local time through Bid Express. The project is federally funded through the Federal Aid Highway Program and requires prequalified contractors only; intent to bid must be submitted by 5:00 p.m. on the Monday preceding the letting date. The scope includes...
- The Kansas Department of Transportation (KDOT) is requesting bids for pedestrian and bicycle path construction on 0.87 miles of streets in Greensburg, Kiowa County, with electronic proposals due September 16, 2026 at 1:00 p.m. local time. Prequalified contractors are eligible to bid; all contractors and subcontractors must obtain current Tax Clearance Certificates from the Kansas Department of Revenue at contract award. The scope spans portions of West Florida Avenue, South Main Street, South...
- The Kansas Department of Transportation is requesting bids for milling and HMA overlay on US-83 in Decatur County, a 12.398-mile segment from the US36/US83 junction north to the Kansas/Nebraska state line under State Project Number U083-020 KA 7926-01, with bids due September 16, 2026 at 1:00 p.m. via Bid Express and opened at 3:00 p.m. at the Eisenhower State Office Building in Topeka. Scope includes 53,567 tons of HMA overlay (SR-12.5A, PG 70-28), 32,646 tons of milling, 1,359 tons of HMA...
- The Kansas Department of Transportation is soliciting bids for grading and surfacing on South Rock Road in the City of Derby, Sedgwick County, spanning 1.69 miles from Freedom Street to 0.5 miles north of East 55th Street, with bids due electronically by 1:00 p.m. local time on September 16, 2026. Prequalified contractors must bid through Bid Express using AASHTO's Project Bids software and the project's electronic bidding system file. The scope encompasses common items including contractor...
The Kansas Department of Transportation (KDOT) Bureau of Construction and Materials is requesting bids on an Ultra-Thin Asphalt Bonded Surface (UBAS) project on K-14 in Jewell County, with proposals due September 16, 2026 at 1:00 p.m. local time via electronic submission through Bid Express, and bids opening at 3:00 p.m. the same day at the Eisenhower State Office Building in Topeka. Contractors must be prequalified with KDOT and possess a current Kansas Department of Revenue Tax Clearance Certificate at award; subcontractors must obtain Tax Clearance Certificates before approval. The project spans 15.223 miles on K-14 from the K14/US36 junction north to the Nebraska/Kansas state line. Work includes mobilization, traffic control, field office and laboratory setup, haul-road maintenance and restoration, asphalt patching, and pavement marking. The scope comprises 6,924 tons of HMA surface (ultrathin bonded, type A, PG 70-28), 178 tons of emulsified asphalt for bonding, temporary pavement marking, approximately 78,686 linear feet of yellow thermoplastic pavement marking (4 inches) and 160,754 linear feet of white thermoplastic pavement marking (6 inches). All work must comply with KDOT's 2015 Standard Specifications for State Road and Bridge Construction and special provisions (including special provision 15-PS0321 for Ultrathin Bonded Asphalt Surface, added via Addendum 1). Aggregate gradation, asphalt content, and flat/elongated particle ratios are specified in detail. The contract term is 30 restricted working days to open the project to unrestricted traffic and 40 total contract working days for completion. Earliest start is June 1, 2027; latest start is September 6, 2027. Funding is entirely state. The contract specifies price adjustments for fuel, asphalt materials, and emulsified asphalt; contractors may accept or reject these provisions. Contract execution must occur within ten business days of award. Contractors must notify KDOT of intent to bid as prime contractor by 5:00 p.m. on the Monday preceding the letting date. All proposals must be submitted electronically using AASHTO's Project Bids software integrated with the electronic bidding system file.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Bid Notice-UBAS. - Jewell County.pdf | 5MB | 9/7/26 | ||
Addendum 1.pdf | 286KB | 9/7/26 |