TRES RIOS WRF Recycled Water System
Closed State & local contract opportunity
- Solicitation number
- 240141
- State
- Arizona
- Responses due
Opportunity facts
- Jurisdictions
- NIGP codes
- 90735 Designing Services
- 925 Engineering Services, Professional
- 92517 Civil Engineering
- 92522 Control Systems Engineering
- 92533 Engineer Services, Professional
- 92535 Environmental Engineering
- 92536 Engineering Services (Not Otherwise Classified)
- 92544 General Construction: Management, Scheduling, Cost Estimation - Engineering
- 92597 Water Supply, Treatment, And Distribution/Engineering
- UNSPSC codes
- 81102501 Mine permitting service
- 81103300 Geomatics engineering
- 81101500 Civil engineering
- 81101501 Well engineering
- 81103402 Front-end engineering design services
- 81103403 Detailed engineering services
- 81103405 Onshore engineering procurement and construction services
- 81101607 Textile engineering service
- 81103406 Conceptual Studies and Pre-Front-end engineering design services
- 81101527 Wastewater engineering
Show all 19
- 81101528 Stormwater engineering
- 81103400 Engineering procurement and project management services
- 81103404 Offshore engineering procurement and construction services
- 81000000 Engineering and Research and Technology Based Services
- 81100000 Professional engineering services
- 81102702 Process control system design and engineering service
- 81101531 Sanitation engineering service
- 81101529 Acoustic engineering
- 81101606 Marine engineering
- Point of contact
-
- Vanessa Guzman vanessa.guzman@tucsonaz.gov (520) 837-4375
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Tucson is seeking architectural and engineering professional services for the Tres Rios Water Reclamation Facility (WRF) Recycled Water System project. The procurement is a qualifications-based selection process targeting the design of a high lift booster pump station, disinfection system, and 24-inch pipeline to deliver treated water effluent to an existing reclaimed water pipeline in Ina Road. Key deliverables include comprehensive design services encompassing pump sizing, geotechnical evaluation, electrical and communication building design, permit acquisition, SCADA system design, and construction management oversight. The project aims to reduce water loss by supplying additional reclaimed water to the Northwest Area instead of allowing flow to pass the Lower Santa Cruz River Managed Recharge Project. Evaluation criteria include qualifications and experience (35 points), work plan and project schedule (30 points), project approach and subconsultant selection (25 points), and federal, state, and local requirements compliance (10 points). The RFQ was published on January 30, 2024, with a submittal due date of February 20, 2024, at 2:00 pm local time. A pre-submittal conference is scheduled for February 9, 2024, at 10:00 am via Microsoft Teams, with a target design work completion date of August 2, 2024, and a target construction completion date of June 17, 2025.
The contract opportunity includes specific provisions for Disadvantaged Business Enterprise (DBE) and Small Business Enterprise (SBE) participation. Contractors must make good faith efforts to engage certified DBE and SBE firms, with detailed requirements for documenting outreach, soliciting quotes, and reporting subcontractor utilization. The SBE program applies to contracts valued at $100,000 or more, allowing participation through prime contractor involvement, subcontractor engagement, supplier participation, or joint ventures. Non-compliance can result in significant consequences, including payment withholding, contract termination, and future bidding disqualification. While no specific budget range is explicitly stated, the comprehensive nature of the project suggests a substantial investment in infrastructure improvement. The project will require integration with existing reclaimed water infrastructure, specifically the pipeline in Ina Road, and will involve coordination with Tucson Water and Pima County jurisdictional entities. Contractors must adhere to federal, state, and local requirements, with a focus on promoting opportunities for small businesses owned by socially and economically disadvantaged individuals.
Opportunity text
Tucson Water is requesting professional design and engineering services to add a high lift booster pump station, disinfection, and pipeline at Tres Rios Water Reclamation Facility (WRF) to deliver treated water effluent to an existing reclaimed water pipeline in Ina Road to supply additional reclaimed water to the Northwest Area.
Files
| File | Type | Posted |
|---|---|---|
| TRES_RIOS_WRF_Recycled_Water_System_(Addendum_#1_Revision).pdf | ||
| DBE_Program_Provisions.pdf | ||
| OFFER_AND_ACCEPTANCE_RFQ.pdf | ||
| SBE_Program_Provisions_.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity