Tree Removal Various Routes District 3
Closed State & local contract opportunity Posted
- Solicitation number
- 66T60
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation is requesting sealed bids for tree removal and maintenance on state-maintained routes in Bureau, Grundy, Livingston, and LaSalle Counties (District 3), with bids due June 12, 2026 at 12:00 p.m. via the iCX electronic bidding system. Contractors must demonstrate at least five years of documented experience in tree removal along highway sites — a core eligibility gate.
The scope includes removal and disposal of medium trees (6–15 inches in diameter) and large trees (greater than 15 inches in diameter), clearing of undesirable brush, structural pruning of old growth oak trees, and site restoration within IDOT right-of-way across four counties. At the Three Rivers Rest Area on Westbound I-80, work includes Paclobutrazol application and structural pruning. At all other locations, work includes tree cutting, herbicide application to cut stumps (by an Illinois Licensed Pesticide Applicator/Operator), stump removal, and rutting repair. All personnel must hold current Illinois Pesticide ID Cards in the Rights-of-Way and Aquatics or Ornamental categories; tree trimming laborers must be ISA Certified Arborists. The contractor must obtain Roadside Management Specialist approval for all herbicide products and calibration and must provide 48-hour notice to specified IDOT personnel in each county before commencing work.
Limestone Rest Area tree removal must be completed by September 15, 2026; all other tree removal work must be completed by March 31, 2027, with final completion and jobsite restoration by September 15, 2027 plus five working days. Payment is by unit diameter (per Standard Specifications Section 201.10), acreage for clearing work, and individual tree treated for trimming. Seeding, mulching, herbicide application, and site restoration costs are incidental with no additional compensation. The contract is funded through IDOT Construction Funds. Award goes to the lowest responsive and responsible bidder.
Opportunity text
This project consists of the removal and proper disposal of medium trees (6-15 inches in diameter) and large trees (greater than 15 inches in diameter), clearing of undesirable brush, and the maintenance of old growth oak trees. Approximate tree locations are shown on the plans. The work at each location consists primarily of: Three Rivers Rest Area on Westbound I-80 Traffic Control. The application of Paclobutrazol. Structural pruning. Disposal of pruned limbs including wood chips, leaves and other debris. Repair of any rutting caused by maintenance activities. All Other Locations Traffic Control. Cutting and removal of identified trees. Disposal of trees including wood chips. Application of herbicide to cut stumps by an Illinois Licensed Pesticide Applicator/Operator. Removal of stumps as per the Engineer. Repair of any rutting caused by tree removal activities. Location: The work to be done under this contract will be performed on State-maintained routes in Bureau, Grundy, Livingston, and LaSalle Counties. The operation will be performed within IDOT right-ofway.