Contract No. 66T60 - Tree Removal Various Routes District 3
This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for a tree removal and maintenance project spanning Bureau, Grundy, Livingston, and LaSalle Counties within IDOT right-of-way. The project consists of removing and properly disposing of medium trees (6-15 inches in diameter) and large trees (greater than 15 inches in diameter), clearing undesirable brush, and maintaining old growth oak trees through structural pruning and growth regulator application. Work at the Three Rivers Rest Area on Westbound I-80 includes traffic control, Paclobutrazol application, structural pruning, and debris disposal. At all other locations, work includes traffic control, tree cutting and removal, herbicide application to cut stumps by licensed applicators, stump removal, and rutting repair. Electronic bids must be submitted to the iCX system prior to 12:00 p.m. on June 12, 2026. Tree removal at the Limestone Rest Area must be completed by September 15, 2026, while all other tree removal work must be completed by March 31, 2027, with final completion by September 15, 2027, plus five working days for jobsite restoration.
This contract will be awarded to the lowest responsive and responsible bidder. All contractors must demonstrate at least five years of documented experience in tree removal along highway sites and must comply with the Illinois Pesticide Act, with all personnel possessing current Illinois Pesticide ID Cards in the Rights-of-Way and Aquatics or Ornamental categories. For tree trimming work, all laborers must be ISA Certified Arborists. The contractor must have the Roadside Management Specialist approve all herbicide products and calibration prior to work commencement, and must notify specified IDOT personnel in Bureau, Grundy, Livingston, and LaSalle Counties at least 48 hours before beginning work. Payment for tree removal will be by unit diameter (per Section 201.10 of Standard Specifications), clearing work by acreage, and tree trimming by individual tree treated. All seeding, mulching, herbicide application, and site restoration costs are considered incidental work with no additional compensation allowed. The contract is funded through IDOT Construction Funds.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 12, 2026 Letting
Notice to Bidders, Specifications and Proposal
Contract No. 66T60 Various Counties Section TREE REMOVAL 2026-02 Various Routes District 3 Construction Funds
Prepared by S Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
June 12, 2026 prevailing time at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Section TREE REMOVAL 2026-02
District 3 Construction Funds
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to readvertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
Section Tree Removal 2026-02
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 Additional State Requirements for Federal-Aid Construction Contracts 2 Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 X Specific EEO Responsibilities Nonfederal-Aid Contracts 5 X Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
COMPLETION DATE PLUS WORKING DAYS
PROSECUTION OF WORK
QUANTITIES
SEEDING AND MULCHING
STATUS OF UTILITIES
TREE REMOVAL, SPECIAL
CLEARING, SPECIAL
TREE TRIMMING, SPECIAL
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
ILLINOIS WORKS APPRENTICESHIP INITIATIVE – STATE FUNDED CONTRACTS (BDE) ..37
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – STATE CONTRACT (BDE)
SURVEYING SERVICES (BDE)
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of Various Routes, Section Tree Removal 2026-02, Various Counties, Contract No.
66T60 and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
LOCATION OF PROJECT
The work to be done under this contract will be performed on State-maintained routes in Bureau, Grundy, Livingston, and LaSalle Counties. The operation will be performed within IDOT right-of-way.
DESCRIPTION OF PROJECT
This project consists of the removal and proper disposal of medium trees (6-15 inches in diameter) and large trees (greater than 15 inches in diameter), clearing of undesirable brush, and the maintenance of old growth oak trees. Approximate tree locations are shown on the plans.
The work at each location consists primarily of:
Three Rivers Rest Area on Westbound I-80
• Traffic Control.
• The application of Paclobutrazol.
• Structural pruning.
• Disposal of pruned limbs including wood chips, leaves and other debris.
• Repair of any rutting caused by maintenance activities.
All Other Locations
• Traffic Control.
• Cutting and removal of identified trees.
• Disposal of trees including wood chips.
• Application of herbicide to cut stumps by an Illinois Licensed Pesticide
Applicator/Operator.
• Removal of stumps as per the Engineer.
• Repair of any rutting caused by tree removal activities.
COMPLETION DATE PLUS WORKING DAYS
Tree removal work at the Limestone Rest Area (Livingston County) shall be completed by September 15th, 2026. All other tree removal work shall be completed by March 31st, 2027. All work shall be completed by September 15th, 2027, plus an additional five (5) working days for any jobsite restoration and removing of any traffic control devices.
PROSECUTION OF WORK
This contract is to be completed as directed by the Engineer. The Engineer must be present during all work. Any work completed without the Engineer present will not be measured for payment.
Prior to beginning work, Contractor shall submit a proposed work schedule to the Engineer outlining when the tasks and materials required as part of this Special Provision will be completed.
In addition to the Engineer, the following materials and/or work shall be approved by the Roadside Management Specialist:
o Herbicide products o Calibration of herbicide equipment o Initial herbicide mixing and any additional herbicide mixing being completed by a different staff member o Assessment of herbicide application coverage
A minimum of 48 hours prior to the start of work, the Contractor shall notify the following IDOT personnel in addition to the Resident Engineer:
Work in All Counties:
Andy Stahr, Roadside Management Specialist – 815-434-8445
Work in Bureau County:
Brady Chandler, Princeton Yard Operations Supervisor – 815-875-2287 Steve Faletti, Ladd Yard Operations Supervisor – 815-894-2800
Work in LaSalle County:
Dave Rennels, Field Engineer – 815-224-1800 Bill Turczyn, Ottawa Yard Operations Supervisor – 815-434-8437
Work in Livingston County:
Mark Emm, Pontiac Yard Operations Supervisor – 815-844-6522
Work in Grundy County:
Mark Emm, Gardner Yard Operations Supervisor (Temporary) – 815-844-6522 Adam Rue, Morris Yard Operations Supervisor (Temporary) – 630-553-7337
QUANTITIES
The quantities specified in this contract are estimated. Payment will be made only for the actual quantities completed. The Resident Engineer has the right to apply any excess plan quantities to alternative trees within the District.
Payment for work will be made in accordance with the items listed in the Summary of Quantities in the plans.
SEEDING AND MULCHING
Areas disturbed by the contractor’s equipment or work shall be seeded with Class 2A seed or other seed types as determined by the Engineer and meeting the applicable requirements of Section 250 of the Standard Specifications. Hand broadcasting of the seed, or other methods approved by the Engineer, will be allowed. Mulch, Method 1 per the applicable portions of Section 251 shall be applied to the seeded areas. This work shall be considered incidental to this contract and no additional compensation will be allowed
STATUS OF UTILITIES
Utility adjustments or relocations should not be required by this project. The Illinois Underground Utility Facilities Damage Prevention Act requires people excavating to contact the one call system (J.U.L.I.E: 800-892-0123 or 811) before digging. IDOT rest area properties are not covered by J.U.L.I.E., the Contractor will be responsible for any location services required for work at rest area properties.
TREE REMOVAL, SPECIAL
Description:
This work shall consist of the cutting and disposal of targeted trees measuring 6” diameter or larger.
Experience:
All work shall be performed by a Contractor with at least five (5) years of documented experience in tree removal activities along Highway sites and shall be able to demonstrate their knowledge in the field.
The Contractor shall observe and comply with all sections of the Illinois Pesticide Act, including licensing. The Contractor shall have had previous experience with the use of weed control chemicals. The Contractor shall have had at least one season's experience in the use of these chemicals in spraying highway rights-of-way or at least three seasons experience in their use in farm or custom spraying. Proof of this experience shall be submitted to the Resident Engineer at or prior to the pre-construction meeting.
At or prior to the pre-construction meeting, the Contractor shall furnish Illinois Pesticide ID Cards (signed and dated) to the Engineer as visual proof that all personnel on the job are licensed Applicators or Operators by the Illinois Department of Agriculture, Bureau of Environmental Programs under the provisions of the Illinois Pesticide Act. The Illinois Department of Agriculture Rights-of-Way and Aquatics categories will be required of the person on site supervising any Operators using pesticides. The Engineer shall record in the project records books the name and license number of each person. If the personnel on the job do not have the proper license, the job will be postponed until personnel who carry the proper license are on the job, with no extra working days awarded to the Contractor.
Materials:
HERBICIDE
The Contractor must have all chemicals inspected in their original unopened packaging by the IDOT District 3 Roadside Vegetation Management Specialist prior to beginning work. If any of the chemicals supplied are deemed non-compliant, the Contractor shall supply additional chemicals for inspection at no additional cost until all chemicals to be utilized on this project are deemed acceptable by the Engineer.
The Contractor shall submit a certification of analysis to the Engineer stating that the compounds of each proprietary product supplied is as specified. The certification of analyses shall be submitted to the Engineer five (5) business days prior to the required chemical inspection.
Spray mixture to be applied to Lonicera species (Honeysuckle) only:
Glyphosate, N-(phosphonomythyl) glycine, in the form of its isopropylamine salt 53.8% (RoundUp Custom or equal approved by the Engineer) shall be applied at a rate of sixty-four (64) ounces per gallon of spray mixture.
Lecithin, methyl esters of fatty acids, and alcohol ethoxylate 100% non-ionic, low foam penetrating surfactant, (Liberate or equal approved by the Engineer) shall be applied at a rate of thirty two hundredths (0.32) of a liquid ounce of product per gallon of potable water.
Super concentrated, temporary, and nontoxic water-soluble blue spray pattern indicator (Super Signal Blue or equal approved by the Engineer) shall be added to the mix at a rate of one (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been made, to dissipate with sunlight or moisture, and to not permanently stain vegetation, soil, or human skin.
This mixture shall be continuously agitated during spraying operations.
Spray mixture to be applied to species in the Fabaceae (Legume) plant family only:
Clopyralid: 3,6-dichloro-2-pyridinecarboxylic acid, monoethanolamine salt 40.9% (Transline or equal approved by the Engineer) shall be applied at sixty-four (64) ounces per gallon of spray mixture.
indicator (Super Signal Blue or equal approved by the Engineer) shall be added to the mix at a rate of one-third (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been made, to dissipate with sunlight or moisture, and to not permanently stain vegetation, soil, or human skin.
Spray mixture to be applied to Osage Orange species (Maclura pomifera) only:
Triclopyr: 2-[(3,5,6-trichloro-2-pyridinyl)oxy] acetic acid, triethylamine salt 44.4% (Garlon 3A or equal approved by the Engineer) shall be applied at sixty-four (64) ounces per gallon of spray mixture.
mix at a rate of one (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been
Spray mixture to be applied to all other species:
Triclopyr: 2-[(3,5,6-trichloro-2-pyridinyl)oxy] acetic acid, butoxyethyl ester 60.45% (Garlon 4 Ultra or equal approved by the Engineer) shall be applied at thirty-five (35)
Basil Oil (JLB Oil Plus or equal approved by the Engineer) shall be applied at ninety-two and one-half (92.5) ounces per gallon of spray mixture.
Super concentrated, temporary, and nontoxic oil-soluble red spray pattern indicator (Bas-Oil Red or equal approved by the Engineer) shall be added to the mix at one-half (0.5) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been made, to dissipate with sunlight or moisture, and to not permanently stain vegetation, soil, or human skin.
All products are stated in liquid measure.
Potable water shall be used on the contract. No water will be allowed to be pumped from nearby creeks, ponds, or other bodies of water. The Contractor shall provide a list of source locations where the potable water will be obtained to the Engineer at or prior to the pre-construction conference. All proposed sources of water must be approved by the Engineer prior to mixing of herbicides.
The Contractor shall download the label and Material Safety Data Sheets for each herbicide, become familiar with the safety hazards, follow the handling & safety instructions, and provide this information to their field personnel. All products shall be applied per the label, if conflicts occur between the label and this document the label shall prevail.
Execution:
Target species have been field marked on the trunk with a pink spray-painted marking. If the Contractor finds any targeted specimen to be questionable as to whether it should remain or be removed, they shall contact the Engineer immediately.
REMOVAL
Remove targeted trees using hand-operated and/or mechanized equipment designed for the removal of trees. Unless otherwise approved by the Engineer, mechanical tree removal shall only occur under frozen and/or dry soil conditions to minimize rutting/pitting or other damage to the existing soils.
• FREE-STANDING TREES
Free-standing trees shall be cut flush with the ground, cut stumps shall be treated with an appropriate herbicide spray mixture immediately after cutting. Treat the cut area around the edge with herbicide so the cambium layer will take up the active ingredient.
• ENTANGLED FENCE-LINE TREES
Targeted trees that are enwrapped, have grown around, are within six inches (6”) of fencing in a manner that will not allow the removal of the tree without significant damage to the fence or Contractor’s equipment, shall be cut at a height just above the top of fence.
Treat the top of the cut stump with an appropriate herbicide spray mixture immediately after cutting, treating the cut area around the edge with herbicide so the cambium layer will take up the active ingredient. In addition to treating the top of the cut stump, the Contractor shall implement two (2) frill treatment lines to the stump, one approximately two-thirds up the height of the stump and one approximately one-third up the height of the stump.
Stumps measuring less than 15” in diameter shall be left cut flush to the ground, stumps 15” or larger shall be removed per Section 201.04 of the Standard Specifications unless otherwise approved by the Engineer. If the Contractor is unwilling or unable to achieve a cut that is flush to the ground as deemed acceptable by the Engineer, all stumps shall require removal per Section
201.04 of the Standard Specifications regardless of size.
All cut-stumps that will not be ground to a 12” depth within eight (8) hours of cutting shall be treated with an appropriate herbicide spray mixture immediately after cutting. Treat the cut area around the edge with herbicide so the cambium layer will take up the active ingredient. When using oil-based herbicides the outer bark shall also be treated.
All herbicide applications shall be accomplished by utilizing wick or sponge-type applicators only.
No herbicide applications shall be made with broadcast spray equipment unless approved by the Engineer. Herbicide application costs shall be considered incidental and no additional compensation will be allowed.
Trees of Osage Orange shall be cut off as specified for all other tree species, pulling or grubbing of Osage Orange trees shall not be allowed. (Modifies 201.04 of the Standard Specifications)
DISPOSAL
The collection and stockpiling of cuttings, logs, stumps, root material, sod, rubbish, surface debris, or other materials throughout construction shall not result in pitting, rutting or any other soil disturbances. Mechanized collection, transport, and stockpiling shall be permitted only under these conditions.
Stockpiling areas shall be as shown on plans or shall be determined by the Engineer using the following criteria:
• Does not impede traffic
• Does not cause a hazard to the motoring public
• Is no closer than fifteen (15) feet to any roadway with curb and/or functional guardrail
• Is no closer than thirty (30) feet to any roadway without curb and/or functional guardrail
• Ease of access
• Site lines (placement of piles shall not disrupt views from adjacent roads)
• Avoidance of wet areas
• Avoidance of native planting areas or cultural features
Stockpiling shall not be allowed in wetland areas
Whenever possible, stockpiling shall occur in degraded areas
All cuttings longer than two (2) feet in length and/or larger than one (1) inch in diameter shall be removed from the project site. Smaller cuttings and cutting debris that has been shredded or chipped using hand-held mechanical equipment may be left on site to decompose. Cuttings and cutting debris shall neither be allowed to accumulate to a depth that will smother existing desirable vegetation and prevent it from emerging, nor prevent good seed-to-soil contact in newly seeded areas (approximately one-half inch maximum depth).
Dispose of cuttings, logs, stumps, root material, sod, rubbish, surface debris, or other material off State property. Contractor shall provide documentation to the Engineer of disposal methods prior to final inspection. Disposal of cuttings and other materials shall be completed simultaneously with the initial tree removal operations. Disposal options for this work include:
• Hauling to Contractor Location(s) The Contractor can either chip removed trees on-site and haul the chips away or haul whole cut trees and branches off site for appropriate disposal. This requires the Contractor to dispose of cut tree material at an off-site facility of their choosing.
Alternative disposal methods may be allowed at the Engineer’s discretion, any alternative disposal methods shall be proposed by the Contractor at the pre-construction meeting. If alternative disposal methods are not approved, the Contractor shall dispose of materials as specified.
All disposal costs shall be considered incidental and no additional compensation will be allowed.
SITE RESTORATION
The Contractor shall fill and smooth any ruts or other ground disturbance created by the tree removal operations, finished planting surface shall be free of clods, rocks, and other debris measuring two inches (2”) or more in any dimension or as otherwise directed by the Engineer.
Within areas of managed lawn (rest areas, residential lots, businesses, maintenance yards, etc.), the Contractor shall remove the debris resulting from stump grinding to a minimum depth of four inches (4”) and install quality imported topsoil as needed to fully fill the area and prepare an appropriate seed bed for re-seeding.
Disturbed areas shall be seeded and mulched within 48 hours of the disturbance, unless otherwise directed by the Engineer.
Restrictions:
Storage of materials shall be prohibited within environmentally sensitive areas as determined by the Engineer.
Without proper traffic control in place, staging of cut material shall not occur within fifteen feet (15’) of any roadway with curb and/or functional guardrail nor within thirty feet (30’) of any roadway without curb and/or functional guardrail.
Unless otherwise directed by the Engineer, cut material shall be disposed of the same day it is cut and work areas shall be cleaned at the end of each day. Stockpiles shall not be allowed to remain on-site overnight.
Method of Measurement:
This work will be measured for payment in Unit Diameter as per Section 201.10 (b) (1) of the Standard Specifications.
The exact trees to be removed will be determined in the field by the Engineer, and the quantities will be adjusted accordingly.
Basis of Payment:
This work will be paid for at the contract unit price per unit diameter for TREE REMOVAL (6 TO 15 UNITS DIAMETER) or TREE REMOVAL (OVER 15 UNITS DIAMETER).
CLEARING, SPECIAL
Description:
This work shall consist of the cutting and disposal of targeted trees measuring less than 6” of unit diameter or as otherwise specified herein. The intent is to remove free-standing trees that are clear of structures or desirable non-target trees utilizing mechanized equipment designed for tree removal operations (i.e. brush mower). This work may be supplemented by the removal of free-standing trees that are adjacent to structures or desirable non-target trees utilizing hand-operated equipment as required (i.e. chainsaws, brush cutters, handsaws, loppers, etc.).
Experience:
All work shall be performed by a Contractor with at least five (5) years of documented experience in tree removal activities along Highway sites and shall be able to demonstrate their knowledge in the field.
The Contractor shall observe and comply with all sections of the Illinois Pesticide Act, including licensing. The Contractor shall have had previous experience with the use of weed control chemicals. The Contractor shall have had at least one season's experience in the use of these chemicals in spraying highway rights-of-way or at least three seasons experience in their use in farm or custom spraying. Proof of this experience shall be submitted to the Engineer at or prior to the pre-construction meeting.
At or prior to the pre-construction meeting, the Contractor shall furnish Illinois Pesticide ID Cards (signed and dated) to the Engineer as visual proof that all personnel handling herbicides on the job are licensed Applicators or Operators by the Illinois Department of Agriculture, Bureau of Environmental Programs under the provisions of the Illinois Pesticide Act. The Illinois Department of Agriculture Rights-of-Way and Aquatics categories will be required of the person on site supervising any Operators using pesticides. The Engineer shall record in the project records books the name and license number of each person. If the personnel on the job do not have the proper license, the job will be postponed until personnel who carry the proper license are on the job, with no extra working days awarded to the Contractor.
Materials:
HERBICIDE
The Contractor must have all chemicals inspected in their original unopened packaging by the IDOT District 3 Roadside Vegetation Management Specialist prior to beginning work. If any of the chemicals supplied are deemed non-compliant, the Contractor shall supply additional chemicals for inspection at no additional cost until all chemicals to be utilized on this project are deemed acceptable by the Engineer.
The Contractor shall submit a certification of analysis to the Engineer stating that the compounds of each proprietary product supplied is as specified. The certification of analyses shall be submitted to the Engineer five (5) business days prior to the required chemical inspection.
Cut-Stump Mixture 1 Spray mixture to be applied to Lonicera species (Honeysuckle) only:
Glyphosate, N-(phosphonomythyl) glycine, in the form of its isopropylamine salt 53.8% (RoundUp Custom or equal approved by the Engineer) shall be applied at a rate of sixty-four (64) ounces per gallon of spray mixture.
mix at a rate of one (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been
Cut-Stump Mixture 2 Spray mixture to be applied to species in the Fabaceae (Legume) plant family only:
Clopyralid: 3,6-dichloro-2-pyridinecarboxylic acid, monoethanolamine salt 40.9% (Transline or equal approved by the Engineer) shall be applied at sixty-four (64) ounces per gallon of spray mixture.
mix at a rate of one-third (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been made, to dissipate with sunlight or moisture, and to not permanently stain vegetation, soil, or human skin.
Cut-Stump Mixture 3 Spray mixture to be applied to Osage Orange species (Maclura pomifera) only:
Triclopyr: 2-[(3,5,6-trichloro-2-pyridinyl)oxy] acetic acid, triethylamine salt 44.4% (Garlon 3A or equal approved by the Engineer) shall be applied at sixty-four (64) mix at a rate of one (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been
Cut-Stump Mixture 4 Spray mixture to be applied to all other species:
Triclopyr: 2-[(3,5,6-trichloro-2-pyridinyl)oxy] acetic acid, butoxyethyl ester 60.45% (Garlon 4 Ultra or equal approved by the Engineer) shall be applied at thirty-five (35)
Basil Oil (JLB Oil Plus or equal approved by the Engineer) shall be applied at ninety-two and one-half (92.5) ounces per gallon of spray mixture.
Super concentrated, temporary, and nontoxic oil-soluble red spray pattern indicator (Bas-Oil Red or equal approved by the Engineer) shall be added to the mix at one-half (0.5) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been made, to dissipate with sunlight or moisture, and to not permanently stain vegetation, soil, or human skin.
Foliar Mixture 1
2,4-Dichlorophenoxyacetic acid, choline salt 56.3% (Freelexx or equal approved by the Engineer) shall be applied at the rate of three and twenty-hundreths liquid ounces (3.2 oz) per gallon of spray mixture (2.50% v/v).
Metsulfuron methyl: Methyl 2[[[[(4-methoxy-6-methyl-1,3,5-triazin-2-yl) amino]carbonyl] amino] sulfonyl] benzoate 60.0% (Escort XP or equal approved by the Engineer) shall be applied at the rate of thirty-five one thousandths of a granular ounce (0.035 oz [1.0 gram]) per gallon of spray mixture (0.027% v/v).
Triclopyr: 2-[(3,5,6-trichloro-2-pyridinyl)oxy] acetic acid, triethylamine salt 44.4% (Garlon 3A or equal approved by the Engineer) shall be applied at two and thirteen-hundredths liquid ounces (2.13 oz) per gallon of spray mixture (1.66% v/v).
Lecithin, methyl esters of fatty acids, and alcohol ethoxylate 100% non-ionic, low foam penetrating surfactant, (Liberate or equal approved by the Engineer) shall be applied at a rate of thirty two hundredths (0.32) of a liquid ounce of product per gallon of spray mixture (0.25% v/v).
mix at a rate of one (1.0) ounce per gallon of spray mixture. Spray pattern indicators shall be formulated to provide visual evidence of where a spray application has been
This mixture shall be applied at no more than (40) gallons of potable water per acre so that product per application and seasonal maximums are not exceeded. This mixture shall be continuously agitated during spraying operations.
Potable water shall be used on the contract. No water will be allowed to be pumped from nearby creeks, ponds, or other bodies of water. The Contractor shall provide a list of source locations where the potable water will be obtained to the Engineer at or prior to the pre-construction conference. All proposed sources of water must be approved by the Engineer prior to mixing of herbicides.
The Contractor shall download the label and Material Safety Data Sheets for each herbicide, become familiar with the safety hazards, follow the handling & safety instructions, and provide this information to their field personnel. All products shall be applied per the label, if conflicts occur between the label and this document the label shall prevail.
Execution: Target species include all brush under 6” of unit diameter, except for oak species and/or other native species marked by the Engineer in green paint or ribbon. In addition, the following species shall be removed regardless of size:
• Alder (Alnus spp.)
• Buckthorn (Rhamnus spp.)
• Cedar (Juniper spp.)
• Honeysuckle (Lonicera spp.)
• Olive (Elaeagnus spp.)
If the Contractor finds any targeted specimen to be questionable as to whether it should remain or be removed, they shall contact the Engineer immediately.
PRE-REMOVAL TREATMENT
Prior to removal of trees, apply Foliar Mixture 1 to the leaves of target species after leaves have fully opened in the spring and up to a few weeks prior to fall senescence, treatments shall be completed at least four weeks prior to removal. Provide full coverage of the leaves while limiting overspray and dripping. To reduce the chance for overspray, Foliar Treatments shall only be applied to target species less than 6” of unit diameter or as otherwise determined by the Engineer.
REMOVAL
Remove targeted trees using hand-operated and/or mechanized equipment designed for the removal of trees. Removal by mechanized equipment is the preferred method for this work.
Unless otherwise approved by the Engineer, mechanical tree removal shall only occur under frozen and/or dry soil conditions to minimize rutting/pitting or other damage to the existing soils.
METHOD 1 – CLEAR OF STRUCTURES AND DESIREABLE TREES
• Free-standing target trees that are not directly adjacent to desirable non-target trees shall be cut flush with the ground utilizing mechanized equipment. Wherever possible, cut-stumps shall be treated with an appropriate herbicide spray mixture immediately after cutting. Treat the cut area around the edge with herbicide so the cambium layer will take up the active ingredient. When using oil-based herbicides the outer bark shall also be treated. Juniper spp that have been cut below the last bottom branch shall be exempt from herbicide requirements.
METHOD 2 – ADJACENT TO DESIREABLE TREES
• Free-standing target trees whose removal using mechanized equipment may cause damage to adjacent desirable non-target trees shall be cut flush with the ground utilizing hand-operated equipment. All cut-stumps shall be treated with an appropriate herbicide spray mixture immediately after cutting. Treat the cut area around the edge with herbicide so the cambium layer will take up the active ingredient. When using oil-based herbicides the outer bark shall also be treated. Juniper spp that have been cut below the last bottom branch shall be exempt from herbicide requirements.
• METHOD 3 – ENTANGLED FENCE-LINE TREES
Targeted trees that are enwrapped, have grown around, are within six inches (6”) of fencing in a manner that will not allow the removal of the tree without significant damage to the fence or Contractor’s equipment, shall be cut at a height just above the top of fence.
Treat the top of the cut stump with an appropriate herbicide spray mixture immediately after cutting, treating the cut area around the edge with herbicide so the cambium layer will take up the active ingredient. When using oil-based herbicides the outer bark shall also be treated.
Trees of Osage Orange shall be cut off as specified for all other tree species, pulling or grubbing of Osage Orange trees shall not be allowed. (Modifies 201.04 of the Standard Specifications)
POST-REMOVAL TREATMENT
Within the growing season following brush removal, apply Foliar Mixture 1 to the leaves of target species re-sprouts and/or seedlings after leaves have fully opened in the spring. Provide full coverage of the leaves while limiting overspray and dripping. If the Contractor determines that follow-up treatments risk injury to adjacent non-target trees, re-sprouts/seedlings shall be cut utilizing hand-operated equipment and stumps treated according to Removal Method 2.
The Contractor shall conduct woody species herbicide treatments to all cut-stumps, re-sprouts, re-growth, or other remaining live plants of all target species.
DISPOSAL
All cuttings longer than two (2) feet in length and/or larger than one (1) inch in diameter shall be removed from the project site. Smaller cuttings and cutting debris that has been shredded or chipped using hand-held mechanical equipment may be left on site to decompose. Cuttings and cutting debris shall neither be allowed to accumulate to a depth that will smother existing desirable vegetation and prevent it from emerging, nor prevent good seed-to-soil contact in newly seeded areas (approximately one (1) inch maximum depth). Any areas as determined by the Engineer to have mulch or debris at a depth that may impact vegetative growth, the Contractor shall rake and remove excess mulch debris at no additional cost.
Dispose of cuttings, logs, mulch, stumps, root material, sod, rubbish, surface debris, or other material off State property. Contractor shall provide documentation to the Engineer of disposal methods prior to final inspection. Disposal of cuttings and other materials shall be completed simultaneously with the initial tree removal operations. Disposal options for this work include:
For any mulch or other debris requiring removal from mechanized equipment usage, the Contractor shall haul the material off site for appropriate disposal. For any whole trees removed from hand-operated equipment usage, the Contractor can either chip removed trees on-site and haul the chips away or haul whole cut trees and branches off site for appropriate disposal. This requires the Contractor to dispose of cut tree material at an off-site facility of their choosing.
methods shall be proposed by the Contractor at the pre-construction meeting. If alternative disposal methods are not approved, the Contractor shall dispose of materials as specified.
The collection and stockpiling of cuttings, logs, stumps, root material, sod, rubbish, surface debris, or other materials throughout construction shall not result in pitting, rutting or any other soil disturbances. Mechanized collection, transport, and stockpiling shall be permitted only under these conditions.
Stockpiling areas shall be as shown on plans or shall be determined by the Engineer using the following criteria:
• Does not impede traffic
• Does not cause a hazard to the motoring public
• Is no closer than fifteen (15) feet to any roadway with curb and/or functional guardrail
• Is no closer than thirty (30) feet to any roadway without curb and/or functional guardrail
• Ease of access
• Site lines (placement of piles shall not disrupt views from adjacent roads)
Stockpiling shall not be allowed in wetland areas
All disposal costs shall be considered incidental and no additional compensation will be allowed.
SITE RESTORATION
The Contractor shall fill and smooth any ruts or other ground disturbance created by the tree removal operations, finished planting surface shall be free of clods, rocks, and other debris measuring two inches (2”) or more in any dimension or as otherwise directed by the Engineer.
Disturbed areas shall be seeded and mulched within 48 hours of the disturbance, unless otherwise directed by the Engineer.
Restrictions:
Storage of materials shall be prohibited within environmentally sensitive areas as determined by the Engineer.
Without proper traffic control in place, staging of cut material shall not occur within fifteen feet (15’) of any roadway with curb and/or functional guardrail nor within thirty feet (30’) of any roadway without curb and/or functional guardrail.
Unless otherwise directed by the Engineer, cut material shall be disposed of the same day it is cut and work areas shall be cleaned at the end of each day. Stockpiles shall not be allowed to remain on-site overnight.
Method of Measurement:
This work will be measured for payment in Acres as per Section 201.10 (b) (2) of the Standard Specifications.
The area containing trees to be removed will be determined in the field by the Engineer, and the quantities will be adjusted accordingly.
10% of this pay item will be held as retainage until final completion of the entire project. The Engineer will release retainage upon issuance of final completion.
Basis of Payment:
This work will be paid for at the contract unit price per acre for CLEARING, SPECIAL.
TREE TRIMMING, SPECIAL
Description:
This work shall consist of tree trimming or pruning activities of old growth oak trees within an existing Rest Area landscape.
Objectives:
Mitigate Risk: Trim trees to lower the likelihood of tree branch, and/or other tree part failure and impact to targets (See ANSI A300 Part 9, Tree Risk Assessment). Trim trees to increase site lines and site distances for pedestrian safety.
Manage Health: Trim trees to improve or maintain plant health, or control pests (See ANSI A300 Part 2, Soil Management and A300 Part 10, IPM). Apply a Paclobutrazol based tree growth regulator to improve overall tree health.
Develop or improve Structure: Trim trees to improve plant architecture (i.e.desirable branch size, spacing, diameter and aspect ratios), ensure that the plant is compatible with the site (e.g.
minimize conflict with traffic, sightlines or infrastructure), and/or restore damaged plants.
Manage Size and/or Shape: Trim trees to reduce size or maintain desired shape.
Improve Aesthetics: Trim trees to improve the visual appearance of plants and/or the surrounding site.
Experience:
All work shall be performed by a Contractor with at least five (5) years of documented experience in the maintenance of public landscapes including applications of tree growth regulator products and tree trimming. They shall be able to demonstrate their knowledge in the field.
All laborers performing this work shall be ISA Certified Arborists with current certifications, copies of each certification shall be provided to the Engineer at or prior to the Preconstruction conference.
The Contractor shall observe and comply with all sections of the Illinois Pesticide Act, including licensing. The Contractor shall have had previous experience with the use of weed control chemicals. The Contractor shall have had at least one season's experience in the use of these chemicals in spraying highway rights-of-way or at least three seasons experience in their use in farm or custom spraying. Proof of this experience shall be submitted to the Engineer at or prior to the pre-construction meeting.
At or prior to the pre-construction meeting, the Contractor shall furnish Illinois Pesticide ID Cards (signed and dated) to the Engineer as visual proof that all personnel handling herbicides on the job are licensed Applicators or Operators by the Illinois Department of Agriculture, Bureau of Environmental Programs under the provisions of the Illinois Pesticide Act. The Illinois Department of Agriculture Rights-of-Way and Ornamental categories will be required of the person on site supervising any Operators using pesticides. The Engineer shall record in the project records books the name and license number of each person. If the personnel on the job do not have the proper license, the job will be postponed until personnel who carry the proper license are on the job, with no extra working days awarded to the Contractor.
Materials:
GROWTH REGULATOR
The Contractor must have all chemicals inspected in their original unopened packaging by the IDOT District 3 Roadside Vegetation Management Specialist prior to beginning work. If any of the chemicals supplied are deemed non-compliant, the Contractor shall supply additional chemicals for inspection at no additional cost until all chemicals to be utilized on this project are deemed acceptable by the Engineer.
The Contractor shall submit a certification of analysis to the Engineer stating that the compounds of each proprietary product supplied is as specified. The certification of analyses shall be submitted to the Engineer five (5) business days prior to the required chemical inspection.
Soil injection solutions shall contain Paclobutrazol 22.3% (Cambistat or equal approved by the Engineer) at appropriate rates as specified on the label.
Potable water shall be used on the contract. No water will be allowed to be pumped from nearby creeks, ponds, or other bodies of water. The Contractor shall provide a list of source locations where the potable water will be obtained to the Engineer at or prior to the pre-construction conference. All proposed sources of water must be approved by the Engineer prior to mixing of herbicides.
The Contractor shall download the label and Material Safety Data Sheets for each herbicide, become familiar with the safety hazards, follow the handling & safety instructions, and provide this information to their field personnel. All products shall be applied per the label, if conflicts occur between the label and this document the label shall prevail.
Execution:
GENERAL CONDITIONS
Contractor shall utilize equipment having low unit pressure ground contact within work areas.
They shall take precautions to ensure that equipment and vehicles do not damage the grading, utilities, structures, lawn, or existing trees and shrubs during execution of the work. Any damage shall be repaired by the Contractor at no additional cost.
The capacity of the equipment shall be sufficient to perform the work and in the time period as specified herein, and as approved by the Engineer.
Contractor shall target old growth oak trees only as shown on the Plans or marked in the field by the Engineer. Branch removal shall occur only during the dormant season, November 15 through March 31.
SOIL INJECTION
Apply the growth regulator materials a minimum of 4 weeks prior to trimming. Each tree shall be treated using soil injection according to the product label. Contractor shall provide equipment that can provide product into the ground at the labeled PSI and depth.
TRIMMING
Reduce or remove branches (living and dead) and/or other parts that pose unacceptable risk of failure, including reducing the length of branches or leaders when needed to reduce load.
Remove deleterious parts, e.g. dead or dying branches, diseased or infested branches, rubbing branches, weakened or broken branches, parasitic plants, etc.
Reduce or remove branches on mature trees to ensure a ground clearance of at least eight (8) feet to improve site lines and pedestrian safety.
Selectively reduce or remove branches, leaders or other parts to achieve or maintain a desired form, shape or size, or to encourage regenerative growth from lower parts of the crown.
Selectively reduce or remove branches, leaders or other parts to achieve aesthetic objectives.
DISPOSAL
The collection and stockpiling of cuttings, logs, stumps, root material, sod, rubbish, surface debris, or other materials throughout the project shall not result in pitting, rutting, soil compaction or any other soil disturbances. Mechanized collection, transport, and stockpiling shall be permitted only under these conditions.
Stockpiling areas shall be as shown on plans or shall be determined by the Engineer using the following criteria:
• Does not impede traffic
• Is no closer than fifteen (15) feet to any roadway
• Ease of access
• Site lines (placement of piles shall not disrupt views from adjacent roads)
Stockpiling shall not be allowed in wetland areas unless otherwise directed by the Engineer
All stockpiling areas shall be identified with the Engineer at the pre-construction meeting.
All cuttings longer than six (6) inches in length and/or larger than one-quarter (1/4) inch in diameter shall be removed from the project site. Smaller cuttings and cutting debris may be left on site to decompose. Cuttings and cutting debris shall neither be allowed to accumulate to a depth that will smother existing desirable vegetation and prevent it from emerging, nor prevent good seed-to-soil contact in newly seeded areas (approximately one-quarter (1/4) inch maximum depth).
Dispose of non-desirable cuttings, logs, stumps, root material, sod, rubbish, surface debris, or other material off State property. Contractor shall provide documentation to the Engineer of disposal methods prior to final inspection. Disposal of cuttings and other materials shall be completed simultaneously with the initial tree removal operations. Disposal options for this work include:
The Contractor can either chip removed trees on-site and haul the chips away or haul whole cut branches off site for appropriate disposal. This requires the Contractor to dispose of cut tree material at an off-site facility of their choosing.
methods shall be proposed by the Contractor at the pre-construction meeting. If alternative disposal methods are not approved, the Contractor shall dispose of materials as specified.
All disposal costs shall be considered incidental and no additional compensation will be allowed.
SITE RESTORATION
The Contractor shall fill and smooth any ruts or other ground disturbance created by the tree removal operations, finished planting surface shall be free of clods, rocks, and other debris measuring one inch (1”) or more in any dimension or as otherwise directed by the Engineer.
Disturbed areas shall be seeded WITH A NATIVE SEED MIX APPROVED BY THE ENGINEER AND MATCHING THE SPECIES PRESENT AT THE SITE. This work shall be considered incidental and no additional compensation will be considered.
Restrictions:
Storage of materials shall be prohibited within environmentally sensitive areas as determined by the Engineer.
Staging of cut material shall not occur within fifteen feet (15’) of any road.
Cut material shall be disposed of the same day it is cut and work areas shall be cleaned at the end of each day, stockpiles shall not be allowed to remain on-site overnight unless otherwise approved by the Engineer.
Method of Measurement:
This work will be measured for payment based on the number of trees treated and trimmed.
Each tree trimmed shall be measured for payment at the unit price. Tree size, branch size, and extensiveness of trimming or treatment have no bearing on the measurement for payment.
Basis of Payment:
This work will be paid for at the contract unit price per EACH for TREE TRIMMING.
CEME…