Trail Ph 2 - Construction at Gathland State Park
Open State & local contract opportunity Posted
- Solicitation number
- BPM059258
- State
- Maryland
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from emma.maryland.gov. Updated .
About this opportunity
The Maryland Department of Natural Resources is requesting bids for construction of Phase 2 of a battlefield interpretation trail at Crampton's Gap/Gathland State Park near Burkittsville, Washington County, with bids due November 3, 2026.
The scope is approximately 5,150 linear feet of new natural surface singletrack trail designed for pedestrian use only; motorized use is prohibited. The trail will tie together existing developed park areas, eliminating the need for additional parking, sanitary facilities, or other related infrastructure. Construction must comply with the Maryland DNR Trail Specification Matrix, which establishes baseline standards for three difficulty classifications—Easier (Green), More Difficult (Blue), and Very Difficult (Black)—across tread width, average and maximum grade, minimum turn radius, corridor width and height, exposure limitations, obstacle parameters, and surface roughness. The specifications emphasize sustainability, requiring grade reversals at least every 100 feet, minimum three percent grade and camber for drainage, and terrain-modification techniques such as "lift and tilt" construction. Specifications account for soil quality variations, with high-quality clay-based soils with rock assumed as baseline; contractors must consult the project manager for terrain-condition exceptions requiring design adjustments.
The project has received final approval from the Maryland DNR. No contract value, contract term, or incumbent information is disclosed in the solicitation materials.
Opportunity text
The Maryland Department of Natural Resources (DNR) is seeking a vendor to construct a second phase of a battlefield interpretation trail at Crampton's Gap/Gathland State Park near Burkittsville. The trail will be approximately 5,150 linear feet of new trail construction. The project includes trail development only - as the route ties together existing developed park areas there is no need for additional parking, sanitary facilities, or other related infrastructure. Trail is a natural surface singletrack for recreation and open for use primarily by pedestrians. Motorized use will not be permitted on the trail.
Files
| File | Type | Posted |
|---|---|---|
| 605B7600015 IFB 10.9.26.docx | DOCX document | |
| 605B7600015 19-SF-GA01_FINAL APPROVAL SCANNED.pdf | ||
| 605B7600015 MPS Trail Spec Matrix (190528) (1).pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity