605B7600015 19-SF-GA01_FINAL APPROVAL SCANNED.pdf
PDF 211 KB Posted
- Attached to
- Trail Ph 2 - Construction at Gathland State Park
- Solicitation number
- BPM059258
- Issued by
- Washington County, Maryland
About this file
This is a final approval document from the Maryland Department of Natural Resources (DNR) for a construction project at Crampton's Gap/Gathland State Park. The project involves the construction of Phase 2 of a battlefield interpretation trail near Burkittsville, Maryland. The trail will consist of approximately 5,150 linear feet of new natural surface singletrack construction designed for pedestrian use only, with no motorized vehicles permitted. The trail development will connect existing developed park areas, eliminating the need for additional parking, sanitary facilities, or related infrastructure. The project is limited to trail construction activities without ancillary site improvements.
The document represents final approval status for the project, indicating that necessary authorization and clearances have been obtained for the construction phase to proceed. No specific pricing information, contract term details, funding sources, or award dates are detailed within this approval document. The file serves as the official authorization documentation required before the DNR can issue the formal solicitation or award a construction contract to a qualified vendor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 605B7600015 MPS Trail Spec Matrix (190528) (1).pdf | ||
| 605B7600015 IFB 10.9.26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .