605B7600015 19-SF-GA01_FINAL APPROVAL SCANNED.pdf

PDF 211 KB Posted

Attached to
Trail Ph 2 - Construction at Gathland State Park
Solicitation number
BPM059258
Issued by
Washington County, Maryland

About this file

This is a final approval document from the Maryland Department of Natural Resources (DNR) for a construction project at Crampton's Gap/Gathland State Park. The project involves the construction of Phase 2 of a battlefield interpretation trail near Burkittsville, Maryland. The trail will consist of approximately 5,150 linear feet of new natural surface singletrack construction designed for pedestrian use only, with no motorized vehicles permitted. The trail development will connect existing developed park areas, eliminating the need for additional parking, sanitary facilities, or related infrastructure. The project is limited to trail construction activities without ancillary site improvements.

The document represents final approval status for the project, indicating that necessary authorization and clearances have been obtained for the construction phase to proceed. No specific pricing information, contract term details, funding sources, or award dates are detailed within this approval document. The file serves as the official authorization documentation required before the DNR can issue the formal solicitation or award a construction contract to a qualified vendor.

View the file

Other files

File Type Posted
605B7600015 MPS Trail Spec Matrix (190528) (1).pdf PDF
605B7600015 IFB 10.9.26.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .