Ticket Vending Machine (TVM) Replacements (5% SBE Goal)

Closed State & local contract opportunity Posted

Solicitation number
RFP 126FO005
State
Colorado
Responses due

Opportunity facts

Jurisdictions
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Regional Transportation District in Denver, Colorado is requesting proposals for removal and installation of Ticket Vending Machines across its service area under a best-value RFP, with proposals due July 28, 2026 and a pre-proposal briefing on June 3, 2026. A 5% Small Business Enterprise participation goal applies — proposers must demonstrate good-faith efforts to meet the goal or document why it cannot be met.

The scope encompasses removal and disposal of 185 existing TVMs and installation of 173 new units: 113 at existing TVM locations, 54 along the East Colfax Bus Rapid Transit corridor, 1 at Civic Center Station, and 5 spares, with an option to purchase 6 additional units for Denver Union Station Bus Concourse. The contractor must furnish, configure, integrate, and commission all hardware, software, and firmware for a complete, fully operational fare vending solution. The new equipment must be PCI compliant (existing machines exceed their 14-year useful life and are non-PCI compliant). TVMs must support multilingual interfaces (English and Spanish as required, plus Russian, Simplified Chinese, Vietnamese, and Korean), integrate with RTD's Account-Based Ticketing system, accept cash, coin, credit, debit, and mobile wallet payments with 99.99% contactless uptime, and be remotely configurable by RTD authorized users without vendor involvement. The contractor must maintain qualified on-site personnel including a project manager, field supervisor, licensed electrician, and concrete workers; provide five years of proven TVM installation experience; and meet defined Service Level Agreement standards with one-hour response for Severity 1 issues and 24/7 support availability.

The estimated contract value is $18.24 million for the base 18-month period, with an additional $1.2 million in optional eight-year warranty and maintenance coverage (eight one-year extension periods plus one six-month extension option available at RTD's unilateral discretion). The contract is fixed-price with compensation allocated prorationally upon each station's acceptance on a rolling basis. Liquidated damages are $350 per day for schedule delays. The contractor must comply with ADA requirements, National Electric Codes, grounding and bonding specifications, security protocols including annual SOC 2 Type 2 reports and PCI-DSS attestations, and federal asset disposition requirements. Work must be scheduled to minimize disruption to approximately 20-plus hours of daily RTD transit operations and coordinate with the ongoing Downtown Rail Reconstruction Project (expected completion August 31, 2027). The contractor is responsible for all permits and must utilize RTD's web-based project correspondence system (Asite) for all communications.

Evaluation criteria are weighted: technical requirements compliance (30%), base cost (20%), option year cost (15%), firm qualifications (10%), staffing and management (10%), concept and design (5%), open architecture approach (5%), and schedule/project management (5%). Phase 2 evaluation assesses SBE participation on a pass/fail basis. Proposers must submit 5% proposal security, Buy America certification, and three years of financial statements. Proposals are valid for 90 days. RTD anticipates oral presentations the week of August 18, 2026 via Microsoft Teams, with final selection by August 31, 2026, subject to RTD Board approval and appropriation of necessary funds. The inquiry period closes June 9, 2026 at 4:00 p.m. RTD reserves the right to reject all offers and re-solicit.

Opportunity text

The Ticket Vending Machine(s) (TVM) removal and installation work is located within the service area of Regional Transportation District in Denver, Colorado.

To support modernization goals and optimize TVM utilization, Contractor shall implement the following changes:

  • Removal and disposal of 185 existing TVMs
  • Provide a total of 173 new TVMs including:
    • 113 new TVMs installed at existing TVM locations
    • 54 new TVMs along the East Colfax Bus Rapid Transit (BRT) corridor
    • 1 new TVM at Civic Center Station
    • 5 new TVM spares for additional parts

Option to purchase 6 TVMs for the Denver Union Station Bus Concourse

Files

File Type Posted
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#5_Revision).pdf PDF
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#4_Revision).pdf PDF
126FO005_-_TVM_Replacement_-_Form_of_the_Contract.pdf PDF
TVM_Replacement_SOW.docx DOCX document
Exhibit_B_-_TVM_Inventory_&_Status_Matrix.xlsx XLSX spreadsheet
Exhibit_I_-_TVM_-_Advanced_Shipping_Notice.xlsx XLSX spreadsheet
Exhibit_F_Engineering_Technical_Specs_for_Installation.docx DOCX document
Exhibit_A_-_RTD_System_Map.pdf PDF
Goal_Determination_Letter_TVM_Replacement_Re-Evaluation_3..23.26_IFB.pdf PDF
TVM_Vendor_list.xlsx XLSX spreadsheet
Exhibit_C_-_TVM_Data_Sheets.pdf PDF
Exhibit_G_-_RTD_Equipment_Case_Requirements.pdf PDF
Exhibit_E_-_Colfax_BRT_Reference_Plans.pdf PDF
Ticket_Vending_Machine_Working_ICE_3-7-26.xlsx XLSX spreadsheet
Exhibit_D_-_TVM_Replacement_-_Standard_Details.pdf PDF
Exhibit_H_-_Grounding_and_Bonding_and_Surge_Protection_Requirements.pdf PDF
Exhibit_J_-_TVM_Requirements_Compliance_Matrix.xlsx XLSX spreadsheet
List_of_Certified_Firms_-_TVM_Replacement_3.23.26.xlsx XLSX spreadsheet
Procurement_Initiation_Form_-TVM_Version_1.2.docx DOCX document
TAG_Review_-_PCRA_TVM_Replacement_v1[1]_(2).docx DOCX document
Title_VI_TVM_Assessment_Memo_-_26_FEB_2025[1]_(2).pdf PDF
Updated_PR_Memo_-_TVM_2025-02_11[1]_(2).pdf PDF
liquidated_damages_memo-TVM_(1).docx DOCX document
Show all 23

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity