This is a Requirements Compliance Matrix for a Ticket Vending Machine (TVM) replacement project by the Regional Transportation District (RTD) in Denver, Colorado. The project involves removal of 185 existing TVMs and installation of 173 new TVMs, including 113 units at existing locations, 54 units along the East Colfax Bus Rapid Transit corridor, one unit at Civic Center Station, five spare units, and an option to purchase six additional units for Denver Union Station Bus Concourse. The compliance matrix outlines 141 functional and non-functional requirements that bidders must address, covering accessibility features, payment technologies, security measures, network connectivity, hardware specifications, training and documentation, testing procedures, and warranty terms. Requirements address ADA compliance with language options in English and Spanish plus Russian, Simplified Chinese, Vietnamese, and Korean; anti-counterfeit measures including secure printing and QR codes; integration with RTD's Account-Based Ticketing system and fare management system; contactless payment readers with 99.99% uptime; remote configurability by RTD authorized users without vendor involvement; and support for multiple payment methods including cash, coin, credit, debit, and mobile wallets.

The matrix specifies comprehensive project management requirements including weekly or bi-weekly progress meetings, monthly status reports, detailed project schedules using Microsoft Project, and site visits with at least two weeks' notice. Design review requirements mandate preliminary and final design review meetings with formal agendas and summaries, along with a demonstration environment for visualization of system features. Training requirements include component-specific instruction on all TVM systems, instructor-led on-site or remote training in the Denver area, and permission to record sessions for future in-agency use. The contractor must provide a Service Level Agreement with response times ranging from one hour for Severity 1 issues to ten working days for Severity 3-4 issues, plus 24/7 support availability. Testing includes System Integration Testing and minimum 30-day System Acceptance Testing with weekly performance reporting. Warranty requirements include eight years or the expected useful life coverage whichever is longer, with parts-only coverage commencing from installation acceptance, plus software and firmware defect corrections at no cost. The proposal notes a 5% Small Business Enterprise (SBE) goal for this contracting opportunity.

View the file

Other files

File Type Posted
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#5_Revision).pdf PDF
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#4_Revision).pdf PDF
126FO005_-_TVM_Replacement_-_Form_of_the_Contract.pdf PDF
TVM_Replacement_SOW.docx DOCX document
Exhibit_B_-_TVM_Inventory_&_Status_Matrix.xlsx XLSX spreadsheet
Exhibit_F_Engineering_Technical_Specs_for_Installation.docx DOCX document
Exhibit_I_-_TVM_-_Advanced_Shipping_Notice.xlsx XLSX spreadsheet
Exhibit_D_-_TVM_Replacement_-_Standard_Details.pdf PDF
Exhibit_H_-_Grounding_and_Bonding_and_Surge_Protection_Requirements.pdf PDF
List_of_Certified_Firms_-_TVM_Replacement_3.23.26.xlsx XLSX spreadsheet
Procurement_Initiation_Form_-TVM_Version_1.2.docx DOCX document
TAG_Review_-_PCRA_TVM_Replacement_v1[1]_(2).docx DOCX document
Title_VI_TVM_Assessment_Memo_-_26_FEB_2025[1]_(2).pdf PDF
Updated_PR_Memo_-_TVM_2025-02_11[1]_(2).pdf PDF
liquidated_damages_memo-TVM_(1).docx DOCX document
Exhibit_E_-_Colfax_BRT_Reference_Plans.pdf PDF
Ticket_Vending_Machine_Working_ICE_3-7-26.xlsx XLSX spreadsheet
Exhibit_C_-_TVM_Data_Sheets.pdf PDF
Exhibit_G_-_RTD_Equipment_Case_Requirements.pdf PDF
Exhibit_A_-_RTD_System_Map.pdf PDF
Goal_Determination_Letter_TVM_Replacement_Re-Evaluation_3..23.26_IFB.pdf PDF
TVM_Vendor_list.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Requirements Compliance Matrix form must be completed and submitted with your proposal.Company Name:
Note: Please refer to the RFP Statement of Work, Section 4, for additional Project Requirement information.Please enter Company Name Here
Date of Proposal:
Instructions: For each table of requirements listed below please respond with one of the following response codes:Please enter Proposal Date Here
ResponseDefinition
Code
FCFully Compliant – Proponent fully complies with requirement. Responses that are qualified by exceptions or limitations, etc. in the Compliance Matrix shall be considered the equivalent of “NC” (does not comply).
CMComplies with Modified Requirement – Proponent shall provide modified requirement language to which they commit to comply. The “CM” shall be equivalent to a response of “FC” if RTD opts to change the requirement as proposed, or to a response of “NC” if RTD opts to not change the requirement.
If complete alternate requirement wording is not proposed in conjunction with a “CM” response, the response shall be considered equivalent to a response of “NC” to the requirement as stated in the RFP. RTD alone shall be the judge of the completeness and appropriateness of alternate requirement language.
NCDoes Not Comply – Proponent does not comply with the requirement. Accompanying comments are discouraged.
Response
IDNameTypeDescriptionCodeComments
REQ-1Accessibility and ADA ComplianceFunctionalThe TVM should be ADA compliant, providing accessibility features such as language options (minimum English and Spanish), audio support, and braille. It should also consider height restrictions for the screen and accommodate wheelchair-bound users.
REQ-2Anti-Counterfeit MeasuresFunctionalThe tickets should include secure ticket printing, holograms, special inks, watermarks, unique barcodes, QR codes, or other methods to prevent forgery and counterfeiting.
REQ-3Checklist and DocumentationFunctionalThe new system should provide checklists for the periods of preventive maintenance programs, covering cleaning, adjustment, and other relevant tasks.
REQ-4Integration with ABT SystemFunctionalCollaborate with the Account-Based Ticketing (ABT) system to integrate and streamline operations.
REQ-5Component-specific TrainingFunctionalConduct detailed training sessions focusing on each TVM component, such as the cash system, credit card system, bill system, coin collection system, security system, and maintenance procedures. Cover topics like troubleshooting, repair, and preventive maintenance.
REQ-6ConfigurabilityFunctionalRTD authorized users shall have the capability to remotely configure TVM screen displays, fares, purchase flows, and workflows without vendor involvement or additional cost.
REQ-7ConfigurabilityFunctionalPromotional and informational messaging displayed on TVMs should be remotely configurable without vendor involvement or additional cost.
REQ-8ConfigurabilityFunctionalRTD authorized users shall have the capability to remotely configure TVM screen displays and purchase flows without vendor involvement or additional cost.
REQ-9Contactless ReadersFunctionalThe new system should support contactless payment technologies such as NFC, RFID, Tap-to-pay, QR code or barcode payment, and mobile wallets readers for seamless transactions.
REQ-10Contactless ReadersTechnicalContactless readers must be fully functional and reliable to an uptime of 99.99%.
REQ-11Documentation and Training MaterialsFunctionalVendor supplied documentation including training manuals and electronic resources, accessible via a central repository or a wiki. Ensure that the materials reflect the latest updates and changes in the TVMs' operation and maintenance processes. RTD shall retain access to all online training courses and/or materials for the length of the contract. All training materials shall become the property of RTD at the conclusion of training.
REQ-12Fare ManagementFunctionalTVMs must integrate with RTDs fare management system to accommodate new and future fare structures through configurable fare calculation rules and purchase flows for the life of the contract.
REQ-13Functional CapabilitiesFunctionalMultiple language options including Russian, Simplified Chinese, Vietnamese, and Korean
REQ-14IntegrationFunctionalThe ability to allow vendor remote access for support and maintenance
REQ-15Integration of TVM ReportingFunctionalIntegrate TVM reporting with other systems to gather transaction volume and usage data, enabling efficient monitoring of TVM performance and data-driven decision-making.
REQ-16Local Security ControlsFunctionalTVMs must provide for local security controls, including tamper and picking proof locks including alarms, data encryption, access controls, and audit trails to ensure data protection.
REQ-17Data SecurityFunctionalMust adhere to RTD cybersecurity standards during integrations and transmissions of data from TVMs to RTDs network
REQ-18Multiple Ticket Types in a Single TransactionFunctionalCustomers should have the option to select and purchase multiple ticket types in a single transaction, streamlining the ticket purchasing process.
REQ-19Network ConnectivityFunctionalTVMs must have ethernet connections for reliable and fast communication.
REQ-20Battery Back UpNon-functionalBackup battery (UPS) power sources for redundancy
REQ-21Hardware/Software VersionNon-functionalTrack hardware/software versions to identify obsolescence risks
REQ-22Payment OptionsFunctionalThe system must support multiple customer payment technologies including but not limited to cash, coin, credit, debit, mobile wallet, contactless payment technologies for seamless transactions that are fully functional.
REQ-23[omitted][Omitted][Omitted]
REQ-24PIN VerificationFunctionalThe readers should support PIN chip verification for debit cards and increasingly for credit cards, ensuring secure authentication of the cardholder.
REQ-25Procurement/Replacement ProcessFunctionalThe vendor must be able to provide installations of TVMs
REQ-26Receipt DeliveryFunctionalCustomers should have the choice to receive receipts via email based on their preference and profile information.
REQ-27Receipt DeliveryFunctionalThe TVM system should provide a printout of the receipt if required by the customer
REQ-28ReportingFunctionalTrack and report on recommended routine service intervals for each TVM
REQ-29Resetting for Next UserFunctionalThe TVMs should promptly reset after each transaction, within a reasonable time frame (e.g., 7 seconds). Additionally, a cancel button should be available to reset the machine if a user abandons the transaction.
REQ-30Sales Data AnalysisFunctionalThe system shall enable analysis of ticket vending machine (TVM) sales data to support decision-making related to machine replacement, maintenance prioritization, and service optimization.
REQ-31Machine Utilization ReportingFunctionalThe system shall provide utilization metrics (e.g., transactions per day, revenue per machine, downtime frequency) to identify underperforming or underutilized machines.
REQ-32DecommissioningFunctionalThe system shall generate analytical reports and visualizations to support decommissioning decisions for low-use or redundant TVMs, based on configurable utilization thresholds.
REQ-33Trend and Forecast AnalysisFunctionalThe system shall identify sales trends over time to inform future placement, relocation, or investment strategies for TVMs.
REQ-34Data Integration and AccessFunctionalThe system shall integrate with existing sales and maintenance databases to ensure up-to-date information is available for reporting and analysis.
REQ-35Ticket PrintoutsFunctionalThe current ticket printouts should include all necessary information. Considerations for future improvements include incorporating barcodes or QR codes for compatibility with fare gates.
REQ-36Updates and Version ControlFunctionalMaintain an electronic version of the documentation, enabling easy access and distribution of updates.
REQ-37Updates and Version ControlFunctionalVendor must provide software updates and version control
REQ-38Updates and Version ControlFunctionalThe ability to receive advance notifications and release notes prior to software updates
REQ-39HardwareHardwareTVM to have room within the machine to store network appliances (eg. Ruggedcom RST916P or similar)
REQ-40HardwareHardwareTVM optimized and hardened and IP 65 rated for outdoor use in all weather conditions
REQ-41HardwareHardwareTVM structurally resilient against vandalism, theft, accidents, general destructions
REQ-42IP RatingHardwareTVMs to be IP 65 rated
REQ-43Testing and ConfigurationFunctionalThe ability to test functionality and configurations in a sandbox/test environment
REQ-44TVM BasicFunctionalThe ability to provide a physically smaller version of a TVM
REQ-45Banking ServicesFunctionalMust be compatible with RTDs banking services provider, currently Wells Fargo or their successor
REQ-46Design ReviewsFunctionalFormal preliminary and final design review meetings shall be conducted by the Contractor. The Contractor will notify RTD of readiness to hold each design review meeting at least two (2), preferably three (3), weeks prior to the meeting.
REQ-47Design ReviewsFunctionalDesign review meetings will be held to review the Contractor’s Preliminary and Final Design submissions. The design review shall consist of an overall Design Review meeting that provides an overview of the preliminary and final design for the complete Solution (e.g. all hardware, software, wireframes, architecture, security, integrations, etc.).
REQ-48Design ReviewsFunctionalThe Contractor shall provide the agenda and data package covering information to be addressed in the design review meeting at least five (5) business days prior to the meeting. All information shall be supplied in native format or electronic Portable Document Format (PDF) for electronic review and comment. Design review meeting summaries shall be prepared by the Contractor within five (5) business days of the meeting and submitted to RTD for review and approval.
REQ-49Design ReviewsFunctionalThe Contractor shall present the design documents and related information in accordance with a previously approved agenda. In the Design Review presentation, the Contractor shall address design approaches, concepts, design details, and interfaces. Following each design review meeting, the Contractor shall revise and re-issue the design documents for RTD review. Following the last preliminary design review meeting a final design review meeting shall be conducted to present the final design documents.
REQ-50Design Review Action ListFunctionalThe Contractor shall provide a written summary of all design review items arising from the design review meetings and shall indicate proposed actions to resolve outstanding design items within two (2) weeks of the meeting. All issues and proposed resolutions and actions are subject to approval by RTD.
REQ-51Demonstration EnvironmentFunctionalThe Contractor shall, during design (i.e. design review meetings) with RTD, make use of a demonstration environment to enable ready visualization of potential Solution design features under discussion. The demonstration environment shall be a configuration from a similar existing installation or test environment and shall include to the extent practical and applicable interconnected hardware and software. The demonstration environment shall also provide access to software configuration settings so that potential changes under discussion can be implemented by the Contractor to demonstrate the impact of the modifications on the system.
REQ-52Kick-off MeetingFunctionalA Project Kickoff Meeting, coordinated with the RTD Project Manager, shall be scheduled within seven (7) days after Notice to Proceed (NTP) and conducted within twenty-one (21) days. The Project Kickoff Meeting will be conducted by the Contractor and the RTD Project Manager at RTD offices, through Microsoft Teams, or other high-quality teleconferencing approach.
REQ-53Project MeetingsFunctionalRTD Project Manager shall schedule and facilitate Progress Meetings held between the Contractor and RTD on a weekly or every other week basis, as deemed necessary by RTD, for the purpose of reviewing progress, coordinating activities, and other project activities that cannot be resolved by correspondence. The timing of these meetings shall be conducted at RTD’s sole discretion, based on the nature of the current project activities. These meetings may be at RTD offices, through Microsoft Teams, or other high-quality teleconferencing approach.
REQ-54Project Meeting AgendasFunctionalAgendas for the Progress Meetings will be prepared by the Contractor and may include any topics that the Contractor's Project Manager determines to be relevant to the project. The Contractor shall insure those persons knowledgeable in the topics to be discussed, including subcontractors, subject matter experts, and/or technical representatives, are present at all necessary meetings. Agendas will be submitted at least two (2) business days prior to the meeting.
REQ-55Meeting SummariesFunctionalMeeting summaries shall be taken at all meetings. Summaries shall include a summary of all topics discussed, a listing of all understandings and agreements reached, and an updated Action Item List (AIL). Unless otherwise agreed, the Contractor shall be responsible for taking all meeting summaries. The format for the meeting summaries shall be developed based on input from RTD.
REQ-56Meeting SummariesFunctionalThe meeting summaries shall be distributed to all attendees for review within three (3) business days from the end of the meeting.
REQ-57Action Item ListFunctionalDuring meetings, action items will be identified, with each action item assigned to an individual for disposition by a pre-determined response date. These action items shall be maintained and updated throughout the project by the Contractor, in an Action Item List (AIL). The AIL format will be mutually agreed upon by the Contractor and RTD.
REQ-58Issue Tracking systemsFunctionalThe Contractor shall provide RTD key personnel access to any issue tracking system used by the Contractor to support the project. The Contractor will provide no less than monthly a status report of all tickets.
REQ-59Monthly Status ReportFunctionalContractor shall provide to the RTD PM a status report monthly highlighting key accomplishments, risks, issues, and milestones/deliverables updates.
REQ-60Invoice DocumentationFunctionalThe Contractor shall keep and maintain reasonably complete and reliably detailed records of milestones achieved in performing the Contract, including records of productivity to identify basis for payment, sufficient to evaluate the accuracy, completeness, and currency of the costs or prices.
REQ-61Project ScheduleFunctionalWithin thirty (30) days after Notice to Proceed (NTP), the Contractor shall furnish, to RTD for RTD’s approval, a detailed Project Schedule. The detailed Project Schedule shall be based on critical-path-method and constructed using Microsoft Project or RTD approved substitute.
REQ-62Project ScheduleFunctionalThe detailed Project schedule shall show start and completion of the work with dependencies for each activity and shall be properly ordered and sequenced. It shall identify all major work tasks including critical events of design, procurement, delivery schedule, installation, testing, and integration, and shall identify interface activities, subcontractor contributions and submittals, RTD inspections, tests, and approvals as may be required by this document, additional details shall be provided, such as:
REQ-63Project Schedule UpdatesFunctionalThe Contractor shall be required to submit project schedule updates on at least a monthly basis. More frequent near-term schedule updates may be required, if deemed advantageous by RTD for monitoring the progress of specific phases of the project.
REQ-64Site VisitsFunctionalThe Contractor shall schedule and conduct site visits with the RTD PM with at least two (2) weeks notice or at the discretion of the RTD PM.
REQ-65PersonnelFunctionalAll personnel assigned by the Contractor shall display appropriate identification while on RTD property and adhere to all RTD Rules and Regulations.
REQ-66Project CommunicationsFunctionalAll email communications from the vendor shall originate from accounts that are owned and managed by the vendor through access management controls.
REQ-67Project CommunicationsFunctionalWithin thirty (30) days of Notice to proceed (NTP), the Contractor shall provide a RACI along with Contractor’s escalation procedure, including contact names and information for each level of escalation.
REQ-68Project CommunicationsFunctionalThe Contractor shall promptly notify the RTD PM of any problems or difficulties that may affect the timely or effective completion of the project or any scheduled deliverables.
REQ-69Project CommunicationsFunctionalThe Contractor shall coordinate activities with RTD PM regarding affected RTD business units and personnel, and with external individuals and organizations.
REQ-70Subject Matter ExpertsFunctionalThe Contractor shall make all subject matter experts available - when required or requested.
REQ-71Quality AssuranceFunctionalThe Contractor shall plan, establish, and maintain a Quality Assurance (QA) program. The Contractor’s QA program shall be imposed upon all entities within the Contractor’s organization and on all subcontractors whenever contract work is performed.
REQ-72Quality AssuranceFunctionalA QA Program Plan shall be submitted for review within 30 days of Notice to Proceed (NTP). The QA Program Plan shall describe the methods for planning, implementing, and maintaining quality, schedules, and cost. The QA Program Plan shall contain a company policy statement that clearly defines the authority and responsibilities of QA personnel.
REQ-73Training Program and ScheduleFunctionalThe Contractor shall work with RTD to develop a Training Program and Schedule that describes:
REQ-74Training InstructorsFunctionalThe Contractor is responsible for ensuring that the instructors teaching these courses are not only familiar with technical information but are able to use proper methods of instruction, training aids, audiovisuals and other materials to provide for effective training. All of the instructors provided by the Contractor shall be fully capable of transmitting in‐depth technical information that can be clearly understood by RTD participants. The training presentations and material shall be in English. RTD shall have the right to direct that an instructor be replaced for cause, at no cost or schedule impact.
REQ-75TrainingFunctionalThe Contractor shall train RTD-designated personnel to install, operate, administrate, and maintain the Contractor-provided solution as required, including solution demonstrations.
REQ-76Training ApprovalFunctionalTraining curricula, presentations, and/or materials shall be provided to RTD for review a minimum 30 days prior to commencement of training. No training shall commence until these items have been approved by RTD.
REQ-77Training LocationFunctionalThe Contractor shall provide instructor-led on-site training in the Denver, Colorado region or remote training as agreed upon with RTD.
REQ-78Recording TrainingFunctionalThe Contractor shall permit RTD to record the training sessions for future in-agency training purposes.
REQ-79Additional TrainingFunctionalThe Contractor shall provide additional training to the original trainees after System Acceptance at no additional cost if major modifications, as defined by RTD, are made to the solution after the initial training due to solution upgrades or changes made under warranty; and/or System Acceptance occurs at least three (3) months after the completion of training, due to delays for which the Contractor is responsible.
REQ-80Support ResourcesFunctionalThe Contractor shall provide phone and email support to RTD during [business hours Monday - Friday 8am - 5PM (Mountain Time)] or [24x7] to assist with any issues during the term of the contract
REQ-81Service Level AgreementFunctionalThe Contractor shall adhere to the following Service Level Agreement (SLA) for any issues with the Solution once implemented.

- Severity 1 - Total System Error ‐ RTD will call the Contractor Support Line. This first line response will log the call immediately, issue a service ticket number, and offer resolution if possible, within 1 (one) service or working hour. If resolution is not possible, within 2 (two) service or working hours, a qualified technician will access the system and diagnose the problem. A resolution strategy will be presented to RTD that will detail the scope and duration of the solution. The solution shall be implemented within 1 working day or less.

- Severity 2 - Severe Impact on System ‐ RTD will call the Contractor Support Line. This first line response will log the call immediately, issue a service ticket number, and offer resolution if possible, within 2 (two) service or working hours. If resolution is not possible, within 4 (four) service or working hours a qualified technician will access the system and diagnose the problem. A resolution strategy will be presented to RTD that will detail the scope and duration of the solution. The solution shall be implemented within 3 working days or less.

- Severity 3 - Minor Impact on System ‐ RTD will call the Contractor Support Line. This first line response will log the call immediately, issue a service ticket number, and offer resolution, if possible, within 1 (one) working day. If resolution is not possible, within 10 (ten) working days a qualified technician will access the system and diagnose the problem. A resolution strategy will be presented to RTD that will detail the scope and duration of the solution. The solution shall be implemented within 7 working days or less.

- Severity 4 - Watch Status ‐ RTD will call the Contractor Support Line any time 24x7x365. This first line response will log the call immediately, issue a service ticket number, and offer resolution if possible, within 1 (one) working day. If resolution is not possible, within 10 (ten) working days a qualified technician will diagnose the problem. The item will remain open until it can be reproduced or more information can be gathered. These items will be reviewed monthly to assess the need to remain on the open list.

REQ-82Update ScheduleFunctionalContractor shall provide annual schedule and monthly update reports of upcoming application patches and fixes (e.g. monthly, quarterly, annually) and end-of-life notices.
REQ-83Release NotesFunctionalContractor shall include, with release notes, the expected time required for any particular update to complete. (e.g. expected downtime)
REQ-84OutagesFunctionalThe Contractor shall proactively (at least 2 weeks in advance) alert RTD to any planned updates and outages to the system.
REQ-85Support and MaintenanceFunctionalContractor shall provide a method/process for hardware and software updates that ensures all devices have received updates.
REQ-86Support and MaintenanceFunctionalBack-end software must provide a report that identifies software version by device.
REQ-87Patching/UpgradesFunctionalContractor shall maintain all patches and upgrades to all software and never be more than 1 (one) month behind on upgrades and patches recommended by Operating System and Database software providers
REQ-88Patching/UpgradesFunctionalContractor shall provide any and all software updates required to run the latest Operating System or Database version within 1 (one) or 2 (two) years of its release.
REQ-89Compatibility with 3rd party softwareFunctionalContractor shall maintain compatibility with Contractor-provided 3rd-party software updates (Prime and their sub system integrations versus browsers and other RTD integrated systems).
REQ-90Technical SupportFunctionalContractor shall provide technical support services to RTD to support integration of existing and future enterprise applications that exchange data with the solution.
REQ-91Remote MaintenanceFunctionalRTD shall be able to perform remote and on-site maintenance on the devices (Remote master device management tool)
REQ-92Repair SupportFunctionalThe Contractor shall supply repair support via RTD sending the broken hardware back to the Contractor for exchange of new equipment as needed.
REQ-93Firmware/Software CompatibilityFunctionalThe Contractor shall supply compatible firmware and software versions across the fleet over the life of the contract.
REQ-94ReliabilityFunctionalProposers shall characterize the reliability of the equipment types on either the basis of elapsed time (mean time between failures) or number of events (such as a number of failures per a number of transactions). This is required for TVMs, and preferred for other asset types including software and other system elements other than TVMs and change machines (if applicable).
REQ-95Test PlanFunctionalThe Contractor shall develop test plan(s) and detailed test cases, with acceptance criteria, cooperatively with RTD which demonstrates all requirements have been met.
REQ-96Test PlanFunctionalThe Contractor shall supply, to RTD, a detailed test plan that spells out the types of testing that will be performed, testers, and schedule.
REQ-97Test CasesFunctionalThe test cases shall be mapped to the contract requirements using a traceability matrix listing each requirement proposed to be demonstrated to applicable test case(s).
REQ-98Test CasesFunctionalUnless otherwise specified, all test cases shall include at a minimum the following:
REQ-99Test Case ApprovalFunctionalTest case approval will be based on RTD validation that they will collectively serve to fully demonstrate all requirements.
REQ-100Test PlanFunctionalTest plan(s) and test cases shall be submitted to RTD a minimum of 30 days prior to the planned start of testing. Testing shall not commence until the test plan(s) and test cases have been approved by RTD.
REQ-101Contractor TestingFunctionalThe Contractor shall perform all testing so as to satisfy the objectives of each testing stage as per the RTD approved test plan. Testing shall include all labor, materials, and support services required to completely test the installed Solution.
REQ-102Test Failure TrackingFunctionalThe Contractor shall maintain a database of and shall track the status of all test failures; errors, defects, or missing functionality.
REQ-103Test Failure SeverityFunctionalAll test failures shall be recorded by the Contractor and assigned a Severity rating as follows:
REQ-104Test Failure SeverityFunctionalRTD shall reserve the right to re‐classify a severity assignment.
REQ-105Testing and DefectsFunctionalTest continuation, suspension or restart shall be as follows:
REQ-106Testing and DefectsFunctionalAll Severity 1 and 2 test failures shall be corrected prior to completion of the stage of testing where they were identified. Test results for that stage shall not be accepted until such time as the Contractor demonstrates that all Severity 1 and 2 test failures have been resolved and tested.
REQ-107Testing and DefectsFunctionalSeverity 3 test failures may be carried forward into the next stage of the project and shall be demonstrated to be corrected in the next planned testing stage.
REQ-108Test RecordsFunctionalUpon successful completion of any test, the Contractor shall prepare and submit within 10 days, a report summarizing the results with relevant test records appended. All such test reports will be reviewed and approved by RTD prior to acceptance of the test results.
REQ-109Witness during TestingFunctionalRTD or its representatives shall have the right to witness any and all tests. No test shall be considered complete until results are signed off by an authorized RTD representative.
REQ-110Changes to SystemFunctionalSignificant or major changes to solution shall initiate a restart of Testing Stage, based on RTD's definition of significant or major change.
REQ-111Testing of ChangesFunctionalAll changes to the solution shall be tested by the contractor before delivering to RTD.
REQ-112Readiness ReportFunctionalThe Contractor shall submit a Readiness Report requesting RTD approval to begin the System Acceptance Testing (SAT) at least five (5) days prior to the planned commencement of SAT. The report shall demonstrate at a minimum that:
REQ-113Test/Development EnvironmentsFunctionalThe Contractor shall provide RTD with separate fully functional Test / Development environments. No development shall occur in the Test environment.
REQ-114Test HardwareFunctionalThe Contractor shall provide to RTD, fully configured hardware, to be used for RTD's test environment.
REQ-115Network Test ResultsFunctionalThe Contractor shall accept RTD’s network test results for network issues. RTD has significant network diagnostic testing capability (e.g. tests for pings, spanning tree, VLAN, routing, buffers, switch restarts, operational status of uplinks, utilization levels, Mesh status, etc.).
REQ-116System Integration Testing (SIT)FunctionalThe Contractor shall install the Solution and demonstrate the integrated operation of all Solution components. The integrated operation of all Solution components will be demonstrated, to the extent possible, in test/development environment before moving to production. The integrated operation of all Solution components shall be demonstrated both in the production and, after failover, to the backup environments.
REQ-117System Integration Testing (SIT)FunctionalThe System Integration Testing shall include time and provisions for RTD staff to conduct independent System integration testing using their own or ad‐hoc script and test cases. Contractor will provide support during these tests.
REQ-118System Acceptance Testing (SAT)FunctionalThe SAT shall include a test of the Disaster Recovery Site failover System and procedures.
REQ-119System Acceptance Testing (SAT)FunctionalSAT shall be conducted for a minimum thirty (30) days, during which time the Contractor shall measure and report on performance and failures on a weekly basis and RTD shall actively monitor the continued performance and functionality of the complete System under diverse revenue service conditions.
REQ-120Additional test failures during SATFunctionalSystem Acceptance shall be granted once any additional test failures identified during the SAT period have been rectified. This may result in the SAT extending beyond thirty (30) days from its initiation and shall be for as long as is needed for all deficiencies to be resolved.
REQ-121Final AcceptanceFunctionalFinal acceptance shall occur after passing SAT and submitting all required documentation to RTD.
REQ-122DocumentationFunctionalAll documentation shall be in English, shall utilize Imperial measurements, and shall be submitted directly to RTD electronically in the following formats, as applicable:
REQ-123Documentation (Manuals)FunctionalThe Contractor shall provide written detailed system operation, administration, configuration, architecture, and maintenance manuals to RTD. Manuals shall be complete, accurate, and up-to-date, and shall contain only information that pertains to the system(s) installed.
REQ-124DocumentationFunctionalAll pages of the documentation shall carry a title, version and page number and issue date. All manuals shall contain a complete subject index.
REQ-125DocumentationFunctionalDocumentation shall require re-issuance if any change or modification is made to the system proposed to be supplied. The Contractor may re-issue individual sheets or portions of the documentation that are affected by the change or modification. Each re-issuance or revision shall carry the same title as the original, with a change in version number and issue date.
REQ-126DocumentationFunctionalApproved documentation shall be a condition of final acceptance, and updated documentation will be required at any time the Contractor provides software or hardware upgrades. If the documentation as submitted is found to be unacceptable due to incompleteness or inaccurate information, the documentation shall be returned to the Contractor for corrective action and be resubmitted for acceptance prior to the release of Final Acceptance payment.
REQ-127DocumentationFunctionalThe Contractor shall provide an Interface Control Document (ICD) and Entity Relationship Diagram (ERD) for all interfaces.
REQ-128Collaboration ToolsFunctionalThe Contractor shall use RTD's Microsoft Team Site for a document sharing/repository.
REQ-129System Implementation PlanFunctionalThe Contractor shall develop a System Implementation Plan (SIP) no less than 60 days prior to start of system implementation. The SIP describes how the System will be installed, deployed and transitioned into an operational System. The SIP will contain an overview of the System, a brief description of the major tasks involved in the implementation, assumptions, constraints, risks, the overall resources needed to support the implementation effort (e.g., hardware, software, facilities, materials, and personnel), and the cutover plan to transition to the new System with minimal adverse impact to RTD’s operations. The overall sequence and site-specific implementation specifications will also be documented. The SIP must be approved by RTD prior to its implementation.
REQ-130Online DocumentationFunctionalContractor shall provide online support including FAQs and online help for the Solution.
REQ-131QR code FunctionalityFunctionalThe system shall be able to print QR codes readable by Fare system validators. Specification to be provided by ABT vendor
REQ-132Warranty CoverageNon-FunctionalThe hardware shall be warranted against defects in materials and workmanship under normal use for the duration of the warranty period specified in the contract.
REQ-133Replacement of Defective PartsNon-FunctionalIf a component is determined to be defective and covered under warranty, the manufacturer shall provide a replacement at no cost to RTD.
REQ-134Return Material Authorization (RMA)Non-FunctionalAn approved RMA number must be obtained to process a warranty claim.

Field Replaceable Units must be eligible for RMA processing.

Replacement FRUs must be shipped to RTD within two to five business days of RMA approval.

Return mailing labels and packaging, if required, must be provided at no cost to RTD.

REQ-135Warranty DurationNon-FunctionalParts only coverage shall be included for eight years or the Expected Useful Life of the asset, whichever is longer, beginning on the date of installation acceptance of the entire system. All warranty periods shall commence and expire on the same dates.
REQ-136Warranty Cost StructureNon-FunctionalThe cost of the warranty shall be provided as:

Cost per year, with options for initial warranty period plus annual renewal options, or

Priced for the entire coverage period.

REQ-137Warranty ExclusionsNon-FunctionalAll exclusions must be listed in detail in the proposal response.
REQ-138Software and Firmware WarrantyNon-FunctionalIf software or firmware fails due to a defect in design, coding, or implementation, and the defect is confirmed by the manufacturer, corrective updates, patches, or replacement versions shall be provided at no cost to RTD.
REQ-139Software and Firmware WarrantyNon-FunctionalThe manufacturer shall cover the cost of any backend system updates necessary to restore functionality, provided the updates are part of the originally licensed software included with the hardware purchase.
REQ-140Software and Firmware WarrantyNon-FunctionalIf defects require partial hardware replacement of Field Replaceable Units, replacement parts shall be shipped within two business days.
REQ-141Software and Firmware WarrantyNon-FunctionalIf defects require full reinstallation, the RMA process shall be initiated, and replacement hardware shall be provided within two business days. The manufacturer shall cover:

Replacement hardware

Packaging

All shipping costs