About this file

This is an Engineering Technical Specifications document for the Regional Transportation District (RTD) in Denver, Colorado, detailing infrastructure work requirements for a Ticket Vending Machine (TVM) replacement and new installation systemwide project. The project scope encompasses removal and disposal of 185 existing TVMs and installation of 173 new units, comprising 113 TVMs at existing locations, 54 units along the East Colfax Bus Rapid Transit corridor, 1 TVM at Civic Center Station, 5 spare units for parts inventory, and an option to purchase 6 additional TVMs for Denver Union Station Bus Concourse. The specifications establish the technical and construction standards governing contractor performance, incorporating the 2023 Colorado Department of Transportation Standard Specifications for Road and Bridge Construction as the baseline framework, supplemented by RTD-specific requirements, CDOT details, and RTD Light Rail Standard Drawings and Design Criteria.

The technical specifications document establishes comprehensive engineering and construction requirements across multiple divisions, including general construction conditions, project management and coordination, quality assurance and control, safety certification, construction zone traffic control, electrical systems (Sections 2600-2800), and communications systems (Sections 2700). A 5% Small Business Enterprise (SBE) goal applies to the contract opportunity. The document prioritizes worker safety, project scheduling, photographic documentation, submittal procedures, and adherence to established construction standards. While specific pricing, contract duration, funding sources, and award dates are not detailed in this specifications document, the technical requirements emphasize compliance with electrical conductor identification, grounding, raceways, underground duct banks, handholes, electrical service metering, and communications system testing and installation standards to ensure systemwide consistency and operational integrity of the modernized TVM infrastructure.

View the file

Other files

File Type Posted
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#5_Revision).pdf PDF
Ticket_Vending_Machine_(TVM)_Replacements_(5%_SBE_Goal)_(Addendum_#4_Revision).pdf PDF
126FO005_-_TVM_Replacement_-_Form_of_the_Contract.pdf PDF
TVM_Replacement_SOW.docx DOCX document
Exhibit_B_-_TVM_Inventory_&_Status_Matrix.xlsx XLSX spreadsheet
Exhibit_I_-_TVM_-_Advanced_Shipping_Notice.xlsx XLSX spreadsheet
Exhibit_C_-_TVM_Data_Sheets.pdf PDF
Exhibit_G_-_RTD_Equipment_Case_Requirements.pdf PDF
Exhibit_A_-_RTD_System_Map.pdf PDF
Goal_Determination_Letter_TVM_Replacement_Re-Evaluation_3..23.26_IFB.pdf PDF
TVM_Vendor_list.xlsx XLSX spreadsheet
Exhibit_D_-_TVM_Replacement_-_Standard_Details.pdf PDF
Exhibit_H_-_Grounding_and_Bonding_and_Surge_Protection_Requirements.pdf PDF
Exhibit_J_-_TVM_Requirements_Compliance_Matrix.xlsx XLSX spreadsheet
List_of_Certified_Firms_-_TVM_Replacement_3.23.26.xlsx XLSX spreadsheet
Procurement_Initiation_Form_-TVM_Version_1.2.docx DOCX document
TAG_Review_-_PCRA_TVM_Replacement_v1[1]_(2).docx DOCX document
Title_VI_TVM_Assessment_Memo_-_26_FEB_2025[1]_(2).pdf PDF
Updated_PR_Memo_-_TVM_2025-02_11[1]_(2).pdf PDF
liquidated_damages_memo-TVM_(1).docx DOCX document
Exhibit_E_-_Colfax_BRT_Reference_Plans.pdf PDF
Ticket_Vending_Machine_Working_ICE_3-7-26.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REGIONAL TRANSPORTATION DISTRICT

INFRASTRUCTURE WORK FOR TICKET VENDING MACHINES REPLACEMENT AND NEW INSTALLATIONS – SYSTEMWIDE

PROJECT NO.

EXHIBIT F – ENGINEERING SPECIFICATIONS

See Exhibit A – System Map, Exhibit B TVM Inventory and for existing system information and details of infrastructure work needed.

General Contract Conditions shall be the Division 01 General Requirements contained herein.

STANDARD CONSTRUCTION SPECIFICATIONS

The Standard Specifications for Construction for this Project shall consist of the applicable sections and subsections, numbered Section 200 through Section 700, of the 2023 "Colorado Department of Transportation Standard Specifications for Road and Bridge Construction."

The Colorado Department of Transportation General Provisions consists of Sections 100 through 109 of the above-mentioned specifications. With the exception of the Sections included herein as Project Special Provisions or as otherwise noted herein, all other General Provisions are not applicable to this Project and are hereby deleted.

Should a conflict arise between RTD General Requirements and CDOT Section 105.21 for partial or final acceptance of work, CDOT Section 105.21 shall take precedence.

The following Project Special Provisions take precedence over Specifications or Plans and supplement or amend the referenced” Standard Specifications for Road and Bridge Construction” adopted in 2021 by the Colorado Department of Transportation, which is to be used to control construction of this Project.

STANDARD CONSTRUCTION DETAILS

It is the intent of the RTD to use applicable details from the Colorado Department of Transportation M&S Standards, the RTD Light Rail Standard Drawings, and the RTD Light Rail Design Criteria, most recent editions.

The Colorado Department of Transportation (CDOT) Special Provisions, Standard Special Provisions are to be used for the project. Use CDOT Project Special Provisions that revise the above described documents and prevail over above described documents.

Table of Contents

SECTION 00 01 10 GENERAL REQUIREMENTS

SECTION DESCRIPTION

01 01 50Construction Staging
01 02 50Measurement and Payment
01 03 10Conformity with Plans and Specifications
01 03 40Cooperation with Utility Companies
01 04 00Cooperation Between Contractors
01 10 00Statement of Work – Additional Details
01 14 13Access To Site – BGAP (As applicable)
01 14 13.1Access To Site – LRT (As applicable)
01 25 00Substitution Procedures
01 31 00Project Management and Coordination
01 31 14Public Information Procedures (As applicable)
01 31 19Project Meetings – Contractor Scheduled
01 32 16Construction Progress Schedule
01 32 33Photographic Documentation
01 33 00Submittal Procedures
01 33 23Shop Drawings, Product Data and Samples
01 35 23Safety Certification Program
01 35 43.23Noise and Vibration Control
01 40 00Quality Requirements
01 42 00References
01 43 00Quality Assurance
01 45 00Quality Control
01 50 00Temporary Facilities and Controls
01 55 26Construction Zone Traffic Control
01 64 00Owner Furnished Materials (As applicable)
01 65 00Product Delivery Requirements
01 66 00Product Storage and Handling Requirements
01 74 00Cleaning and Waste Management
01 76 00Protecting Installed Construction
01 77 00Closeout Procedures
01 78 23Operation and Maintenance Data (As applicable)
01 78 39Project Record Documents
01 78 43Spare Parts (As applicable)
01 78 46Extra Stock Materials (As applicable)

PROJECT SPECIAL PROVISIONS

Revision of Section 107 – Worker Safety Revision of Section 108 – Prosecution and Progress Revision of Section 202 – Removal of Structures, Asphalt Mat and Obstructions Revision of Section 203 – Potholing Revision of Section 412 – Concrete Patching and Curb Head Replacement Revision of Section 601 – Structural Concrete Revision of Section 613 – Electrical Conductor Identification Revision of Section 613 – Electrical Conduit – General Revision of Section 613 – Pull Boxes – General Revision of Section 630 – Construction Zone Traffic Control Utilities

SECTION 26 00 00

SECTION DESCRIPTION

26 05 00Systemwide Electrical General Requirements for Systems
26 05 19Systemwide Electrical Low-Voltage Electrical Power Conductors and Cables for Systems
26 05 26Systemwide Electrical Grounding for Systems
26 05 29Systemwide Electrical Raceway and Equipment Support for Systems
26 05 33Systemwide Electrical Raceways for Systems
26 05 43Systemwide Electrical Underground Duct banks and Raceways for Systems
26 05 44Systemwide Electrical Handholes for Systems
26 05 33Systemwide Electrical Identification for Electrical Systems for Systems
26 08 10Systemwide Electrical Testing for Systems
26 27 13Systemwide Electrical Electricity Service and Metering
26 28 13Systemwide Electrical Fuses for Systems
26 28 16Systemwide Electrical Enclosed Switches and Circuit Breakers for Systems

SECTION 27 00 00

SECTION DESCRIPTION

27 02 00Communications System Overview
27 60 00Communications Wire, Cable and Raceway
27 96 00Communications System Testing
27 98 00Communications Materials and Workmanship

END OF TABLE OF CONTENTS FOR TECHNICAL SPECIFICATIONS