Opportunity details come from cogreggtx.bonfirehub.com. Updated .

About this opportunity

Gregg County, Texas is soliciting bids under County Bid No. 2026-18 for removal and replacement of the exterior Exterior Insulation and Finish System (EIFS) cladding on the Terminal Building at East Texas Regional Airport, with bids due August 18, 2026. The source names no set-aside, preference, or eligibility restriction beyond bidder SAM registration.

The scope covers complete EIFS demolition down to concrete masonry, cold-formed steel, cast-in-place concrete, and brick substrates, followed by installation of either brick masonry or Insulated Metal Panel cladding. The insulation specifications call for 2-inch polyiso rigid insulation rated R-8 or 2-inch IMP over 1.5-inch metal hat channels, with fluid-applied vapor barriers and sealed building envelopes. Associated work includes replacement of mechanical equipment, awnings, parapet coping, fencing, and signage, plus door and window replacements, mechanical chase construction, and new pre-finished metal parapet capping and screening walls. Work spans concrete, masonry, metals, thermal and moisture protection, openings, finishes, plumbing, HVAC, and electrical divisions. Bidders must submit statements of qualifications, references, and non-collusion certifications, and must comply with mandatory federal contract provisions. Required bonds include bid, construction performance, payment, and maintenance bonds, along with insurance certificates.

Performance occurs at 269 Terminal Circle, Longview, Texas 75603, where building operations continue during construction. Roof access is restricted to exterior access only, and the contractor must use designated lay-down areas that avoid blocking driveways. The contractor must obtain all permits, verify existing conditions in the field, and repair ground disturbance caused by construction.

KSA Engineers prepared the construction documents dated May 8, 2026, and the project manual dated June 2026. Consultants on the project include structural engineer S.E. Huey Co., mechanical and plumbing engineer EMA, and electrical engineering services, with principal architect John E. Selmer of KSA Engineers.

Opportunity text

Gregg County is soliciting bids for Terminal Building Exterior EIFS Removal and Replacement at the East Texas Regional Airport in Gregg County, Texas from qualified Respondents.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for State & Local Contractors