2-Plans (Sealed).pdf
PDF 20 MB Posted
- Solicitation number
- 2026-18
- Issued by
- Gregg County, Texas
About this file
This document consists of construction plans and specifications for the Terminal Building Exterior EIFS Removal and Replacement Project at East Texas Regional Airport (ETRA), located at 269 Terminal Circle, Longview, Texas 75603, prepared by KSA Engineering for Gregg County, Texas. The project involves the complete demolition of existing Exterior Insulation and Finish System (EIFS) cladding and its replacement with new brick masonry or Insulated Metal Panel (IMP) cladding systems. The scope of work encompasses removal of existing EIFS assemblies and sheathing down to various substrate types including concrete masonry units, cold-formed steel framing, cast-in-place concrete, and brick masonry; installation of new 2-inch polyiso rigid insulation with R-8 rating or 2-inch IMP over 1.5-inch metal hat channels; application of fluid-applied vapor barriers; and replacement of associated components including mechanical equipment, awnings, parapet coping caps, fencing, and signage. The construction documents dated May 8, 2026, include detailed floor plans, roof plans, elevations, wall sections, and specifications across multiple sheets showing existing, demolition, and new conditions. The project maintains ongoing building operations throughout construction, with roof access restricted to exterior access only and designated construction lay-down areas established to avoid blocking driveways.
The construction documents establish comprehensive requirements for site management, including contractor responsibility for documenting existing damage, maintaining proper drainage, and repairing all ground disturbance caused by construction activities. The contractor must obtain all required permits and building permits for the work and verify existing building conditions and dimensions in the field, notifying the architect of any discrepancies. Specific demolition protocols require removal and protection of existing jetways, fencing, mechanical equipment, and other site elements, with temporary sealing of openings during demolition to prevent water and air infiltration. The project includes multiple exterior wall configurations with different base conditions and insulation specifications, detailed interior modifications including door and window replacements, and mechanical chase construction. New pre-finished metal parapet capping, metal awnings, screening wall assemblies, and associated flashing and waterproofing details are specified throughout. All work must comply with federal, state, and local codes and ordinances, with sealed building envelopes required to prevent moisture vapor, air, and light transmission infiltration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .