Newport Utilities is soliciting a Request for Proposal (RFP) for a pre-engineered steel storage building project located in Clay County, Tennessee. The specific procurement involves constructing a 100' x 50' x 20' storage area with detailed specifications, including an open 100' side with 6' turn-ins on each end and metal-covered 50' gable ends. The comprehensive project scope requires comprehensive site preparation, including excavation, fill, compaction, and constructing a concrete slab approximately 12" higher than existing grade. Key deliverables include rebar package installation, formed pier footings, concrete work, steel building erection, roof and end wall panel installation, and complete engineering of foundations and columns. The project timeline includes a contractor invitation on April 17th, 2025, a mandatory pre-bid meeting on April 24th, 2025, at the Newport Utilities Operations Center, and a bid opening on May 12th, 2025, at the NU Main Office. All proposals must be electronically submitted through BidNet, with questions due by May 9th, 2025. Additional project requirements include electrical outlets, lighting, bird netting, and rain leader piping to connect downspouts to an existing grate drain.
While specific disadvantaged enterprise requirements are not explicitly outlined in the documentation, the project appears open to qualified contractors capable of meeting the detailed technical specifications. The RFP does not mention incumbent vendors or existing infrastructure constraints that would limit competitive bidding. The proposal indicates that pricing will be based on similar recent projects, with the final cost contingent upon receiving engineered drawings specifying exact building specifications. No explicit budget range is provided in the available documentation, though the comprehensive nature of the project suggests a substantial capital investment for a specialized storage facility. Potential bidders should be prepared to demonstrate technical expertise in pre-engineered steel building construction, site preparation, concrete work, and comprehensive project management. Contractors will need to show capability in handling complex construction projects with precise engineering requirements and the ability to integrate multiple technical components including structural, electrical, and drainage systems.
Opportunity text
Newport Utilities is requesting an RFP for a 100' x 50' x 20' storage area.
Files
| File | Type | Posted |
|---|---|---|
| RFP Storage Building 042025-01001.pdf |