State Road (SR) 60 Trailhead Park
Closed State & local contract opportunity
- Solicitation number
- 26-0052-PR
- State
- Florida
- Responses due
Opportunity facts
- Jurisdictions
- Point of contact
-
- Kelly Rogers kelly.rogers@myclearwater.com (727) 444-8527
Opportunity details come from procurement.opengov.com. Updated .
About this opportunity
The City of Clearwater is soliciting bids for construction services on the State Road (SR) 60 Trailhead Park project with proposals due October 7, 2026. The scope includes site improvements at State Road 60 and Bayshore Boulevard to support the Courtney Campbell Causeway pedestrian overpass and adjoining trail system, with connectivity to an adjacent Welcome Center.
Work encompasses installation of site furnishings (benches, picnic tables, Adirondack chairs, waste receptacles, drinking fountains, bike racks, and bicycle repair stations), landscaping and irrigation, concrete pads and sidewalks, and regulatory and informational signage. All new concrete slabs must be 6-inch reinforced concrete on grade with minimum 3,000 PSI strength, Type 1 cement conforming to ASTM C150, and compaction and testing per specifications. Concrete slab areas must match existing grade elevations of adjacent pavement and comply with ADA requirements, maintaining a maximum 1:20 slope and 1:50 cross slope. The irrigation system design uses reclaimed water as the primary source with Hunter and Rainbird equipment including solar sync controllers, bubbler systems for trees, rotors for turf areas, and spray heads for shrub and groundcover beds. All landscaping materials must be Nursery Grade No. 1 or better, and the contractor must provide a written guarantee of plant survivability for twelve months from final acceptance. The contractor is required to provide one fixed project sign and coordinate all material installations with the City Project Manager at (727) 444-8584. All irrigation shop drawings require City approval prior to work commencement. Work must comply with the Florida Building Code 8th Edition 2023 and Florida Fire Prevention Code 8th Edition 2023.
The contract period is 90 consecutive calendar days from Notice to Proceed. All quantities in the scope of work are estimates only; the City is not obligated to purchase any minimum or maximum amount. The bid set includes 100% construction documents dated July 21, 2026, with architectural, structural, and landscaping plans prepared by Williamson Design Associates and landscape architect Birgit Kibelka.
Opportunity text
The Scope of Work for the State Road (SR) 60 Trailhead Park Project includes creating a new Trailhead to support the use of the new Courtney Campbell Causeway pedestrian overpass and adjoining trail system and connectivity to the adjacent Welcome Center. Site improvements include the installation of site furnishings such as benches, picnic tables, Adirondak chairs, waste receptacles, drinking fountain, bike racks, bike repair station, landscaping, irrigation, concrete pads and sidewalks and regulatory/informational signage as specified in the construction plans.
The intent of this bid is to obtain competitive prices to establish a contract for construction services. All quantities are estimates only and the city of Clearwater (city) is not obligated to purchase any minimum or maximum amount during the contract. All the work is to be administered per Section III, Section 23 of the Contract Documents. The Contractor shall provide one (1) [Fixed] project sign as described in Section III, Section 23 of the Contract Documents.
Contract Period: 3 months or 90 Consecutive Calendar Days from Notice to Proceed